Name
|
Done
|
Plan
|
Hubert
|
|
|
Cynthia
|
- Week W39 (09/22~09/26):
- Take care of Flame KK v2.0 automation reports
- Clarify and reproduce Woodduck issues on Flame (http://goo.gl/W577ka)
|
- Week W40 (09/29~10/03):
- Take care of Flame KK v2.0 automation reports
- Clarify and reproduce Woodduck issues on Flame (http://goo.gl/W577ka)
|
Gerry
|
- Week W39 (09/22~09/26):
- Test App usage metrics
- Finish EU-support test
- Verify 2.1 bugs
|
|
Mike
|
- Week W39 (09/22~09/26):
- Test case mind map creation
- Tarako power drain issue follow up
- Madai bug verification
- Project management training
|
- Week W40 (09/29~10/03):
- Flame base image verification: v184
- Madai bug verification
- Extend Orangutan capability
- 3rd party app performance measurement
|
eric
|
- Week W39 (09/22~09/26):
- Test Run for RIL
- Exploratoy against v2.1
- Feature page index for OS
- Verification of bugs before FC
- Fixing RIL/COMMS test cases
|
- Week W40 (09/29~10/03):
- Exploratoy against v2.1
- Feature page index for OS
- Verification of bugs before CC
- Fixing SMS/STK test cases
- Reviewing smoke test case
|
Paul
|
- bug 1064800 - Re-test on master and v2.1
- Fix test case error
- Trigger full run on v2.1
|
- bug 1064800
- Setup device for flame_kk
- Workaround for v2.0 software home button
- Fix test case error
- Patch for reusing marionette instance
- Trigger custom build run for patch 1064800
- Modify crash report patch based on review
-- backlog --
- Followup live test run stream
- Datazilla integration
- Bug fix for in-testcase logging
|
William Hsu
|
- Week W39 (09/22~09/26)
- [Routine] Bug replication, submission, and verification.
- [Device] Assist device related tests - Tako
- Smoketest on Tako (ETA:9/25)
- Gaia UI test on Tako (ETA:9/23)
- Test strategy for CAF ES2 build (v2.0)
- Prepare All-in-one test machine/VM for partner (Part I: Packages installation 9/26)
- Weekly meeting with partner (9/23)
- Address automation test related problems
- Three-way synchronization with partners (progress)
- [Device] Assist device related tests - Flame
- Prepare jobs for Flame KK
- Gaia UI test on v2.0 Build
- Analyze problem of rescue tool
|
- Week W40 (09/29~10/03)
- [Device] Assist device related tests - Tako
- Prepare All-in-one test machine/VM for partner (Part II: System Configuration 9/29~9/30)
- Smoketest on Tako (ETA:10/02)
- Gaia UI test on Tako (ETA:9/30)
- Weekly meeting with partner (9/30)
- Three-way synchronization (project status)
- [Device] Assist device related tests - Flame
- Gaia UI test on v2.0 Build
- v2.0 Bug verification (verifyme) (Ref: http://goo.gl/EyMRDn)
|
Alison Shiue
|
- Week W39 (09/22~09/26)
- Bugs verification
- [Bluetooth] Update test cases at mozrtrap
|
|
Al
|
- Week W39 (09/22~09/26)
- Woodduck weekly triage
- Privacy Panel Feature for v2.1
- MCTS for v2.0/v2.1
- Monkey Test
|
|
Walter Chen
|
- Week W39 (09/22~09/26)
- Bug solving for mtbf
- MTBF test runs*2
- interviews
|
|
Shing
|
- Week W39 (09/22~09/26)
- Apps usage metrics testing
- Cost Control testing
- Cost Control test cases design
- Cost Control performance regression investigation
|
- Week W40 (09/29~10/03)
- Cost Control test cases design
- Apps usage metrics test cases design
- Read Pragmatic Software Testing
- Prepare sharing on how to submit app to Firefox Marketplace
|
Edward
|
- Week W39 (09/22~09/26)
- Test/ verify sprint 5 tickets
- Plan rearrangement resource for feature owner.
- Smoke test for productivity apps with KK image
|
|
Askeing
|
- Week W39 (09/22~09/26)
- Develop the combo-runner framework.
- Investigate the MCTS.
- Fix the building/testing jobs on CI server.
- Develop the flashing tools.
- Prepare the information of outsourcing.
|
- Week W40 (09/29~10/03)
- Investigate the MCTS.
- Develop the flashing tools for MTBF.
- Prepare the information of outsourcing.
- Follow up the Card UI user story.
|
|