3,860
edits
(Created page with " Last week | Next week {| class="wikitable" class="fullwidth-table" border="1" |...") |
m (Lakrits moved page FirefoxOS/DeviceQA/2014-11-24WeeklyReport to Firefox OS/DeviceQA/2014-11-24WeeklyReport: The official spelling of "Firefox OS" leaves a space between the two parts of the name. It's easier to find a page if the spelling of it...) |
||
(7 intermediate revisions by 6 users not shown) | |||
Line 26: | Line 26: | ||
|| | || | ||
* Week W48 (11/24~11/28) | * Week W48 (11/24~11/28) | ||
** Device Builds discussion. | |||
** Plan Gaia Build process with Gaia team. | |||
** Android L Porting. | |||
** Follow up Woodduck build issue. | |||
** Mozilla Certificate Test Suite discussion. | |||
** Connected Devices meeting. | |||
|| | || | ||
* Week W49 (12/1~12/5) | * Week W49 (12/1~12/5) | ||
Line 88: | Line 93: | ||
|| | || | ||
* Week W48 (11/24~11/28) | * Week W48 (11/24~11/28) | ||
** Prepare Portland ww sessions | |||
|| | || | ||
* Week W49 (12/1~12/5) | * Week W49 (12/1~12/5) | ||
Line 104: | Line 109: | ||
|| | || | ||
* Week W48 (11/24~11/28) | * Week W48 (11/24~11/28) | ||
** Prepared for V2.2 productivity | |||
** Completed 11/28 Smoketest (thanks Mike and William's support) | |||
|| | || | ||
Line 111: | Line 118: | ||
| Walter | | Walter | ||
|| | || | ||
* | ** Taking care of Bugs | ||
*** Bug 1077292 - [MTBF][B2G] Phone shutdown due to high power consumption and chopped charging | |||
**** Help T2M with issues | |||
*** Bug 1081577 - [Performance][Dialer] lmk.js is wrong in Flame base image | |||
**** lmk.js experiments (some more issues) and need more patches | |||
*** Bug 1094070 - [MTBF][B2G][Camera][Media Server] black camera screen with buttons | |||
**** Reproduced in v180 v184 v188 and log provided. | |||
*** Bug 1076605 - [MTBF][App Launch] Apps failed to launch, stuck at icon splash | |||
**** Customized patches and fixes, now patched. | |||
** Restruct | |||
*** MTBF restruct in process | |||
** Portland workweek preparation | |||
|| | || | ||
Line 120: | Line 138: | ||
|| | || | ||
* Week W48 (11/24~11/28) | * Week W48 (11/24~11/28) | ||
** [Device] Assist Dolphin related stuffs | |||
*** Performance evaluation (Smoketest, test-perf, and Gaia UI test) | |||
*** FPS measurement | |||
** [Device] Assist Tako related stuffs | |||
*** Follow remaining tasks, and close Tako's bug (v2.1 & v2.0) | |||
** [Device] Assist Flame related stuffs | |||
*** Gaia UI test on v2.0 Build | |||
*** Gaia UI test on v2.1 Build | |||
*** Tune GU's testvars (Flame v2.1) | |||
*** v2.0 Bug verification (verifyme) | |||
**** Ref: http://goo.gl/EyMRDn | |||
|| | || | ||
* Week W49 (12/1~12/5) | * Week W49 (12/1~12/5) |
edits