Firefox OS/DeviceQA/2014-11-24WeeklyReport: Difference between revisions

m
Lakrits moved page FirefoxOS/DeviceQA/2014-11-24WeeklyReport to Firefox OS/DeviceQA/2014-11-24WeeklyReport: The official spelling of "Firefox OS" leaves a space between the two parts of the name. It's easier to find a page if the spelling of it...
(Created page with " Last week | Next week {| class="wikitable" class="fullwidth-table" border="1" |...")
 
m (Lakrits moved page FirefoxOS/DeviceQA/2014-11-24WeeklyReport to Firefox OS/DeviceQA/2014-11-24WeeklyReport: The official spelling of "Firefox OS" leaves a space between the two parts of the name. It's easier to find a page if the spelling of it...)
 
(7 intermediate revisions by 6 users not shown)
Line 26: Line 26:
||
||
* Week W48 (11/24~11/28)  
* Week W48 (11/24~11/28)  
 
** Device Builds discussion.
** Plan Gaia Build process with Gaia team.
** Android L Porting.
** Follow up Woodduck build issue.
** Mozilla Certificate Test Suite discussion.
** Connected Devices meeting.
||
||
* Week W49 (12/1~12/5)
* Week W49 (12/1~12/5)
Line 88: Line 93:
||
||
* Week W48 (11/24~11/28)  
* Week W48 (11/24~11/28)  
 
** Prepare Portland ww sessions
||
||
* Week W49 (12/1~12/5)
* Week W49 (12/1~12/5)
Line 104: Line 109:
||
||
* Week W48 (11/24~11/28)  
* Week W48 (11/24~11/28)  
** Prepared for V2.2 productivity
** Completed 11/28 Smoketest (thanks Mike and William's support)


||
||
Line 111: Line 118:
| Walter
| Walter
||
||
* Week W48 (11/24~11/28)  
** Taking care of Bugs
*** Bug 1077292 - [MTBF][B2G] Phone shutdown due to high power consumption and chopped charging
**** Help T2M with issues
*** Bug 1081577 - [Performance][Dialer] lmk.js is wrong in Flame base image
**** lmk.js experiments (some more issues) and need more patches
*** Bug 1094070 - [MTBF][B2G][Camera][Media Server] black camera screen with buttons
**** Reproduced in v180 v184 v188 and log provided.
*** Bug 1076605 - [MTBF][App Launch] Apps failed to launch, stuck at icon splash
**** Customized patches and fixes, now patched.
** Restruct
*** MTBF restruct in process
** Portland workweek preparation


||
||
Line 120: Line 138:
||
||
* Week W48 (11/24~11/28)  
* Week W48 (11/24~11/28)  
 
** [Device] Assist Dolphin related stuffs
*** Performance evaluation (Smoketest, test-perf, and Gaia UI test)
*** FPS measurement
** [Device] Assist Tako related stuffs
*** Follow remaining tasks, and close Tako's bug (v2.1 & v2.0)
** [Device] Assist Flame related stuffs
*** Gaia UI test on v2.0 Build
*** Gaia UI test on v2.1 Build
*** Tune GU's testvars (Flame v2.1)
*** v2.0 Bug verification (verifyme)
**** Ref: http://goo.gl/EyMRDn
||
||
* Week W49 (12/1~12/5)
* Week W49 (12/1~12/5)
3,860

edits