Firefox/IterativeDevelopment/IT-39.1PerformanceReport: Difference between revisions
Jump to navigation
Jump to search
Full Query
(Created page with "==Iteration 39.1 Performance== <p> </p> ===Iteration Production Goal=== * Team surpassed the iteration production goal of 156 points and completed 176 points. File:39-1-ITGO...") |
|||
(3 intermediate revisions by the same user not shown) | |||
Line 18: | Line 18: | ||
===Production Growth=== | ===Production Growth=== | ||
* The team's production range experienced a | * The team's production range experienced a 13-point contraction in comparison to the Q1 baseline: | ||
** Minimum production capacity decreased 6.8% (5 points). | ** Minimum production capacity decreased 6.8% (5 points). | ||
** Median production capacity decreased 7.6% (13 points). | ** Median production capacity decreased 7.6% (13 points). | ||
Line 27: | Line 27: | ||
===Completion Rate=== | ===Completion Rate=== | ||
* 113% of iteration point target completed which surpassed the 'success' range. | * 113% of iteration point target completed which surpassed the 'success' range. | ||
* 47% of | [[File:39-1-ICOMPLETION.png]] | ||
[[File:39-1- | * 47% of Release 39 point target completed to date. | ||
[[File:39-1-RCOMPLETION.png]] | |||
<p> </p> | <p> </p> | ||
Latest revision as of 00:12, 11 March 2015
Iteration 39.1 Performance
Iteration Production Goal
- Team surpassed the iteration production goal of 156 points and completed 176 points.
Release Production Goal
- Given the 176 points completed in IT 39.1 the team is currently ahead in achieving the target release goal of 390 points for Release 39.
- The team will need to complete a minimum of 156 points in IT 39.2 to achieve the target release goal of 390 points.
Velocity Range
- Team achieved a median velocity of 157 points with a 90% likelihood the actual points completed will fall between 69 and 255 in Iteration 39.2.
Production Growth
- The team's production range experienced a 13-point contraction in comparison to the Q1 baseline:
- Minimum production capacity decreased 6.8% (5 points).
- Median production capacity decreased 7.6% (13 points).
- Maximum production capacity increased 2.0% (5 points).
Completion Rate
- 113% of iteration point target completed which surpassed the 'success' range.
- 47% of Release 39 point target completed to date.
Completed Work
74 Total; 0 Open (0%); 45 Resolved (60.81%); 29 Verified (39.19%);