Gaia/SMS/Scrum/FxOS-S7: Difference between revisions

From MozillaWiki
< Gaia‎ | SMS‎ | Scrum
Jump to navigation Jump to search
(Created page with "Replace: * 1202956 by the bug number for this sprint * FxOS-S7 by the sprint name (eg: 2.1S1) * FxOS-S7 (21Sep) by the sprint name in the target milestone property (eg: 2.1 S1...")
 
No edit summary
Line 1: Line 1:
Replace:
* 1202956 by the bug number for this sprint
* FxOS-S7 by the sprint name (eg: 2.1S1)
* FxOS-S7 (21Sep) by the sprint name in the target milestone property (eg: 2.1 S1 (1aug))
* FxOS-S7%20%2818Sep%29 by the sprint name in the target milestone property, url-escaped (eg: 2.1%20S1%20%281aug%29)
* 8 by the points taken for this sprint
== List of bugs ==
== List of bugs ==
<onlyinclude>
<onlyinclude>

Revision as of 03:46, 9 September 2015

List of bugs

SMS issues handled by the SMS subteam (blocks the sprint bug 1202956)

Bugzilla link

Full Query
ID Assigned to Summary Blocking b2g Feature-b2g Whiteboard Resolution
818000 Julien Wajsberg [:julienw] system messages are ignored if the handler pathname is not the same as the foreground application pathname --- No cf_feature-b2g [sms-sprint FxOS-S7 p=3][sms-sprint FxOS-S6 p=2][sms-sprint FxOS-S5 p=3] WONTFIX
1180592 Steve Chung [:steveck] [Messages][NG] mozMobileConnections shim Implementation --- No cf_feature-b2g [sms-sprint FxOS-S7 p=1][sms-sprint FxOS-S6 p=2] FIXED
1198266 [Messages] Use ConversationService in the application --- No cf_feature-b2g [sms-sprint FxOS-S8 p=1][sms-sprint FxOS-S7 p=3][sms-sprint FxOS-S6 p=2] WONTFIX
1201016 [Messages][NG] Migrate the current Message manager event handling to NGA --- No cf_feature-b2g [sms-sprint FxOS-S8 p=1][sms-sprint FxOS-S7 p=1] WONTFIX

4 Total; 4 Open (100%); 0 Resolved (0%); 0 Verified (0%);


Remaining points and burndown chart

google chart api url for Sprint FxOS-S7

Burndown chart
Remaining points
Start 8
Day 2
Day 3
Day 4
Day 5
Day 6
Day 7
Day 8
Day 9
Day 10
End


SMS issues handled by the SMS subteam outside of the sprint (contains whiteboard "sms-sprint-FxOS-S7")

No results.

0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);


All SMS issues tracked for this sprint (target milestone)

Bugzilla link

Full Query
ID Assigned to Summary Blocking b2g Feature b2g Resolution
1184012 Stéphane Roucheray [Messages] Throttle event handlers for the "input" event handlers --- --- FIXED
1202956 SMS sprint FxOS-S7 --- --- INCOMPLETE

2 Total; 2 Open (100%); 0 Resolved (0%); 0 Verified (0%);


Sprint planning

Minutes are on a separate page.

Daily meetings

Day 2: 9th September

Day 3: 10th September

Day 4: 11th September

Day 5: 14th September

Day 6: 15h September

Day 7: 16th September

Day 8: 17th September

Day 9: 18th September

Day 10: 21st September

Demos

Retrospective