** There is still a lot work to do, but some features should be reconsidered like A/B testing
** There is still a lot work to do, but some features should be reconsidered like A/B testing
** We need prioritization of the features, too many features and there are dependencies with platform (just confirmed with Tamara that there is only one dependency and it seems not difficult to implement, [https://bugzilla.mozilla.org/show_bug.cgi?id=1232453 1232453])
** We need prioritization of the features, too many features and there are dependencies with platform (just confirmed with Tamara that there is only one dependency and it seems not difficult to implement, [https://bugzilla.mozilla.org/show_bug.cgi?id=1232453 1232453])
|-
| NSEC
| Jason/Aaron
| New
| This week:
* Refer to Mozlando [https://docs.google.com/document/d/1OT3ktKZPYZnL2s8diXs5Dy6VXAdHXeml5wnhHRcwsBc/edit NSec weekly meeting notes]
* Spec out Pinning.
Issues:
* Persistent solution - Pinning (PT)
** Can we achieve solid persistence with service workers?
* To package or not (package format) (Ethan)
** SRI (subresource integrity)
** Standard package format (RFC 1847)
** Consider this old design document: https://docs.google.com/document/d/1ehNH83tr1D965UkJdKxhFL_Am2AfsgOxY9QYJU4zBys/edit#heading=h.sr938rgjx1vf
* Subresource integrity (SRI) security check for unsigned packaged content
We should move forward this way.
https://developer.mozilla.org/en-US/docs/Web/Security/Subresource_Integrity
* Permission model for New Security Model (PT)
** Also looking at Alternative permission model
*** eg move some things to the web
* Marketplace
** “discontinue new security architecture”
** Product is working on a plan for the future of marketplace
** (Jean) update NSec team discontinue NSEC from Marketplace
** QA support transitioning to FxOS QA
*** Need hand over meeting with Krupa
*** [QA met with Krupa in Orlando. Looking at
their automation test suite now]
|-
| Foxfooding, Participation and Contributor Growth
| Jean/Peter
| New
| *Sessions in Orlando on improving product participation
*Discussion on foxfooding held at Mozlando with Ari re. focusing more heavily in foxfooding program. There were some strategic next steps proposed. These are tbd but will be shared once we lock these down
*Ari agreed that foxfooding is critical in the new connected devices realm where we still need a development reference device (that may or may not be a phone).
*150 devices distributed @ Mozlando
|-
| Android Ports
| Nicole/Peter
|New
| *[12/1] B2G-Installer Add-on QA started
* B2G-Installer Add-On bug dependencies need to be resourced after Orlando
* Nexus 6 done - distribution will depend on build creation
* Legal discussions happening to unblock distribution
* Releng conversation on scaling builds will happen in Orlando
|-
| B2Gdroid
| Nicole/Peter/Fabrice
| New
| * [12/15] Focus priorities to support the Alopex experience.
* [12/1] bug tracking wiki: https://wiki.mozilla.org/B2Gdroid
* 100K downloads
* [11/24] Weekly triaging every Tuesday and Thursday
* Have nightly builds and updates (still need manual work for signing)
* Highest priority for development now is to get Gi and raptor tests running.
|-
| Pin the Web
| Lindsay/Ben
|
| * [12/15]
** Mostly continuing as planned
** Some features may be cut due to dependencies on other teams with shifting priorities:
*** Pin Contact/Event at risk due to NSEC/NGA priority changes
*** Talking to Marketplace tomorrow about bug [https://bugzilla.mozilla.org/show_bug.cgi?id=1226625 1226625] (W3C Web App support) for web app suggestions
* [Previous]
** [https://www.pivotaltracker.com/n/projects/1354744 Ordered product backlog] (subject to release planning)
UX specs in progress
Working on timeline for feature complete as well as polish and QA schedules
Working on pulling the [https://wiki.mozilla.org/Pin_the_Web documentation] into one place
|-
| Add-ons
| Mars/David Durst
|
| * [12/1] - 2.6 scope will not be determined till after Orlando or Q1 due to marketplace resourcing
|-
| Control Center
| Lindsay/Ben
|
| * [https://www.pivotaltracker.com/n/projects/1354744 Ordered product backlog] (as above)
* UX spec ready
* Team is identifying platform dependencies
* User stories have been estimated and work has begun
* Issues with platform dependencies
|-
| TV
| Josh
|
| * Completed
** Remote Control http://bit.ly/1PptNy7
** Marketplace TV side install feature
*** legal discussion on icon
* On-going
**Fixing TV bugs
** FTU
** Marketplace TV and frontend integration
** iarc needs to be cleared with panasonic
* P1: [https://bugzilla.mozilla.org/show_bug.cgi?id=1214148 Bug 1214148] - AudioChannel API design doesn't fit into nested mozbrowser iframe case.
|-
| Kill Switch
| Michael
|
|* FTE changes are out of scope and will not be needed for 2.6
* Patches ready for landing will be allowed to land
* Kill Switch is needed only for commercial devices.
* Kill Switch has been a US market entry requirement
* Kill switch is a complicated enough feature that we have really reduced in complexity over the last few weeks since we dropped the red* projects
|}
|}