Continuous Integration: Difference between revisions
Jump to navigation
Jump to search
(→Automated Test Coverage: new status for code coverage) |
(→Marionette Improvements: updated status) |
||
Line 92: | Line 92: | ||
|- | |- | ||
| Removal of python from the Marionette harness | | Removal of python from the Marionette harness | ||
| | | 01/28/16 | ||
! style="background:#FF2800;" | AT RISK | ! style="background:#FF2800;" | AT RISK | ||
| New marionette-client promises driver developed. Now working on tests for driver. | | New marionette-client promises driver developed. Now working on tests for driver. | ||
|- | |- | ||
| Device testing on TaskCluster/Treeherder with Bitbar | | Device testing on TaskCluster/Treeherder with Bitbar | ||
| | |05/31/16 | ||
! style="background:#00EC00;" | | ! style="background:#00EC00;" | CHALLENGED | ||
| | |Uncertaintly about the future of phone testing at Bitbar has resulted in questions regarding how to proceed. | ||
|- | |- | ||
| Marionette stability | | Marionette stability | ||
| | |03/31/16 | ||
! style="background:#00EC00;" | ON TARGET | ! style="background:#00EC00;" | ON TARGET | ||
| Bugs have been entered and work is slotted for Q1. | | Bugs have been entered and work is slotted for Q1. Fixes have been made to tackle problem associated with "intermittents". | ||
|- | |- | ||
| Sandbox environment stability | | Sandbox environment stability | ||
| | |03/31/16 | ||
! style="background:#00EC00;" | ON TARGET | ! style="background:#00EC00;" | ON TARGET | ||
| Work is slotted for Q1. | | Work is slotted for Q1. |
Revision as of 23:41, 22 January 2016

Program Description
The purpose of the Firefox OS Quality initiative is to drive the engineering team to Continuous Integration through testing platform improvements, test improvements, test automation and code coverage, where every commit on Gecko and Gaia triggers a full test run, with failures and performance issues reported on Treeherder for immediate backout.
Requirements:
The following Firefox OS 2.6 work must be completed to achieve Continuous Integration:
* Automated Test Coverage * Convert integration tests from GIP to GIJ * Fix intermittently failing tests * Fix tests that work on mulet but not on device * Create a Test Matrix to define which platform the tests are going to run on (device, mulet, emulator) * Make sure every single commit in gecko/gaia triggers automated tests * Automate MozTrap scenarios using GIJ when feasible * Actively maintain working Mulet tests with reporting on Treeherder * Ensure code coverage * Marionette Improvements * Remove python from Marionette harness * Run Marionette.js tests on devices in the Bitbar testing farm with reporting on Treeherder * Improve Marionette stability and stability of sandbox environment * Kitkat Emulator Improvements * Fix kitkat emulator testing issues * Put emulators in place for testing with reporting on Treeherder * Port emulator to next android x86 version * Raptor Activation on Treeholder * Run performance tests on devices with reporting on Raptor and Treeherder (Bitbar testing farm) * Integrate the device service into Raptor * Achieve ability for sheriffs to back out commits if post-commit data is bad * Ability to block commits with pre-commit testing
Program Status
Automated Test Coverage
Milestone | Due Date | Status | Notes |
---|---|---|---|
Convert integration tests from GIP to GIJ | 12/31/15 | LATE | All but 10 have been converted. This deliverable is late because intermittents were prioritized above this effort. |
Intermittently failing tests fixed | 01/31/15 | AT RISK | Fixed parts of Marionette that were causing issues. Disabled all the tests were failing intermittently. Module owners need to ensured they're fixed before re-enabling them. Will need more time than originally estimated so most likely won't meet due date. |
Tests that work on mulet work on device | 01/31/15 | CHALLENGED | It's being reported that some of the flagged tests actually work on device. Need to reassess all. |
Test Matrix created that defines platform(s) the tests are going to run on | 12/31/15 | LATE | Draft of matrix completed but there are still some tests that need to be evaluated for appropriate testing environment. Won't get this done until January. |
Automation of tests according to Test Matrix | 05/31/16 | CHALLENGED | Draft of matrix completed but there are still some tests that need to be evaluated for appropriate testing environment. Need to finalize matrix before automation can begin. |
Every single commit in gecko/gaia triggers automated tests | 05/31/16 | ON TARGET | There's still work that needs to be identified and scheduled. |
MozTrap scenarios automated using GIJ when feasible | 05/31/16 | ON TARGET | |
Working Mulet tests actively maintained with reporting on Treeherder | 05/31/16 | ON TARGET | |
Code Coverage Tool developed | 05/31/15 | ON TARGET | Originally targeted for end of Q4, but assistance at Mozlando didn't happen. Re-prioritized and given new due date. |
Marionette Improvements
Milestone | Due Date | Status | Notes |
---|---|---|---|
Removal of python from the Marionette harness | 01/28/16 | AT RISK | New marionette-client promises driver developed. Now working on tests for driver. |
Device testing on TaskCluster/Treeherder with Bitbar | 05/31/16 | CHALLENGED | Uncertaintly about the future of phone testing at Bitbar has resulted in questions regarding how to proceed. |
Marionette stability | 03/31/16 | ON TARGET | Bugs have been entered and work is slotted for Q1. Fixes have been made to tackle problem associated with "intermittents". |
Sandbox environment stability | 03/31/16 | ON TARGET | Work is slotted for Q1. |
Kitkat Emulator Improvements
Milestone | Due Date | Status | Notes |
---|---|---|---|
Milestone 1 | ON TARGET | ||
Milestone 2 | CHALLENGED | ||
Milestone 3 | AT RISK | ||
Milestone 4 | ON TARGET | ||
Milestone 5 | CHALLENGED | ||
Milestone 6 | AT RISK | ||
Milestone 7 | ON TARGET | ||
Milestone 8 | CHALLENGED | ||
Milestone 9 | AT RISK |
Raptor Activation on Treeholder
Milestone | Due Date | Status | Notes |
---|---|---|---|
Integrate the fxos device service into Raptor | DONE | ||
Enable automated testing of devices at Bitbar | NOT STARTED | ||
AT RISK |
Status Key
Color | Status | Key |
---|---|---|
On Target | The project or deliverable is expected to meet its due date. | |
Challenged | The project or deliverable is facing an issue that might cause it to miss its due date, but a “get well” plan has been developed to get it back on track. | |
At Risk or Late | The project or deliverable is blocked or facing an issue that might cause it to miss its due date, and there’s no “get well” plan to get it back on track, or it is already late. | |
Done | The project or deliverable has been completed. | |
On Hold | The project or deliverable has been placed on hold. |
Program Timeline
MVP Scope
Querying by 2.6+ features
(please add correct bug tracking number)
No results.
0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);
Dependency Tracking
Detailed Program Plan
Action Item | Engineering Owner | QA Owner | UX Owner | Bugzilla ID | Planned Done | Actual Done |
---|---|---|---|---|---|---|
Program Stakeholders
Role | Name | IRC |
---|---|---|
EPM | ||
EM | ||
PM | ||
TL | ||
UX | ||
QA |
- EPM = Engineering Program Manager
- EM = Engineering Manager
- PM = Product Manager
- TL = Tech Lead
- UX = User Experience
- QA = Quality Assurance