EngineeringProductivity/Projects/Debugging UX improvements: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
m (add links to tracking bugs)
(Add project components and minor changes)
Line 22: Line 22:
</bugzilla>
</bugzilla>
= Project #2 - End to end times =
= Project #2 - End to end times =
* Meeting notes - [https://drive.google.com/open?id=1B1ksYp-U20Ghvwzam8TLeN7U-3Ast8NdeiNGVRf1F9k]
* Meeting notes - [https://drive.google.com/open?id=1B1ksYp-U20Ghvwzam8TLeN7U-3Ast8NdeiNGVRf1F9k link]
* Project brief - [https://docs.google.com/document/d/13ZG1L_z93rEbRRMkFaAABYL-rFGa-gzLaxuW0UFn8Aw/edit#heading=h.jwvrqttqmb7s]
* Project brief - [https://docs.google.com/document/d/13ZG1L_z93rEbRRMkFaAABYL-rFGa-gzLaxuW0UFn8Aw/edit#heading=h.jwvrqttqmb7s link]
* Work breakdown - [https://docs.google.com/spreadsheets/d/1kYf66y1gQbw7FZ-Abf0Q4kJ4n7IbswkQ6gz22hLcU-w/edit#gid=0]
* Work breakdown - [https://docs.google.com/spreadsheets/d/1kYf66y1gQbw7FZ-Abf0Q4kJ4n7IbswkQ6gz22hLcU-w/edit#gid=0 link]
* Tracking bug - [https://bugzilla.mozilla.org/show_bug.cgi?id=1278680 link]
* Tracking bug - [https://bugzilla.mozilla.org/show_bug.cgi?id=1278680 link]
<bugzilla>
<bugzilla>
Line 37: Line 37:
}
}
</bugzilla>
</bugzilla>
== Metrics ==
 
TBD
== Project components ==
=== Skip builds ===
Only show [skip-builds] in the whiteboard.
<bugzilla>
{
    "f1": "status_whiteboard",
    "o1": "anywords",
    "v1": "[skip-builds]",
 
    "resolution": "---",
    "include_fields": "id, priority, summary, whiteboard, keywords, assigned_to",
    "order": "priority"
}
</bugzilla>
=== sscache ===
Only show [TBD] in the whiteboard.
 
=== metrics ===
Only show [TBD] in the whiteboard.

Revision as of 21:03, 7 June 2016

This project is composed of multiple projects which will be improving the overall experience when debugging issues on try. The original discussions are discussed in here. The projects defined below are the ones we're considering tackling at this point.

Discovered possible projects - bugzilla tree dependency

Project #1 - Remote debuggers

  • Meeting notes - link
  • Project brief - link
  • Work breakdown - link
  • Tracking bug - link
Full Query
ID Priority Summary Whiteboard Keywords Assigned to
1271677 P2 Interactive tasks should be scheduled with high priority
1284998 P2 Create tests for interactive debugging workflows
1302520 P3 Support running jittest from an interactive worker
1303031 P3 Support running Android xpcshell tests on interactive loaners
1302518 -- Support running cppunittests from an interactive worker
1302519 -- Support running gtest from an interactive worker

6 Total; 6 Open (100%); 0 Resolved (0%); 0 Verified (0%);

Project #2 - End to end times

  • Meeting notes - link
  • Project brief - link
  • Work breakdown - link
  • Tracking bug - link
Full Query
ID Priority Summary Whiteboard Keywords Assigned to
1240644 P2 Allow skipping build and reusing existing build result for try push
1280641 P3 Implement a two-tier S3 cache for sccache [build-run-speed-up] stale-bug
1284882 P3 [tracker] Artifact builds on automation
1315030 P3 Determine how many try pushes could benefit from using artifact builds
1432287 P3 [meta] Run tests from source checkouts in CI meta
1294706 -- "Mochitest other" chunk on win7 debug slow and often last to complete

6 Total; 6 Open (100%); 0 Resolved (0%); 0 Verified (0%);


Project components

Skip builds

Only show [skip-builds] in the whiteboard.

No results.

0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);

sscache

Only show [TBD] in the whiteboard.

metrics

Only show [TBD] in the whiteboard.