Line 60: Line 60:
! style="background:#00EC00;" | On Target
! style="background:#00EC00;" | On Target
|  
|  
'''Product Concept Validation'''
*Launched a consumer study Oct. 25th to test two different value propositions with groups of 100 in the target demographic group. Will monitor results and review the questions we're asking for appropriateness.
*Also launched a Facebook campaign and [http://www.mozilla-campaigns.org/project-abigail-product-page/ landing page] to gauge interest in Abigail and collect email addresses.
*Working closely with an agency on the Abigail video that will feature how a family of four can be helped by Abigail.
*Models of Abigail have been printed in 3D to be used in the video and available for studies.
[[File:Model of Abigail.png|500px]]
*Wrote and posted a [https://connected.mozilla.org/ blog on Abigail].
'''Engineering'''
*Spending this week with testing code, bug fixing. Working on getting voice commands with user names working.
*Getting the base code running on the 5 prototype devices and preparing them for use in the study. Working on a problem identified with flaky accelerometer connections. Looking into loose jumper wires.
[[File:Abigail Prototype.png|500px]]
'''Concept Validation Testing'''
'''Concept Validation Testing'''
*Study was started October 28th to test a couple concepts for the Abigail product: 1) Smart Family Tracker and 2) Smart Reminders for the Whole Family
*Study was started October 28th to test a couple concepts for the Abigail product: 1) Smart Family Tracker and 2) Smart Reminders for the Whole Family
*A Facebook campaign has been active since October 26th to test consumer interest using different product concepts. Data is coming in on how well this is driving consumers to Abigail product page.
*A Facebook campaign has been active since October 26th to test consumer interest using different product concepts. Data is coming in on how well this is driving consumers to [http://www.mozilla-campaigns.org/project-abigail-product-page/ Abigail product page].
[[File:Model of Abigail.png|300px]]
 
*Revisiting how to produce a video to showcase all the functionality that Abigail can provide.
*Revisiting how to produce a video to showcase all the functionality that Abigail can provide.
'''Engineering'''
*Spending this week ensuring end-to-end use cases work, testing code, bug fixing. Working on getting voice commands with user names working.
*Working on 5 prototype devices and preparing them for use in the study. Working on a problem identified with flaky accelerometer connections. Fixing a problem with loose jumper wires.
[[File:Abigail Study Prototype 1.jpg|300px]]
[[File:Abigail Study Prototype 2.jpg|300px]]


'''Abigail Study with Prototypes'''
'''Abigail Study with Prototypes'''
*Finishing up work on a prototype study guide that will be used during the visits to participant homes.  
*Finishing up work on a prototype study guide that will be used during the visits to participant homes.  
*Scheduling participant sessions. The first will be held November 11th. Abigail team members will be interviewing the participants and observing their interactions with the Abigail prototypes.
*Scheduling participant sessions. The first will be held November 11th. Abigail team members will be interviewing the participants and observing their interactions with the Abigail prototypes through the week of November 14th.
*Study will include consumer interaction with the prototypes and collection of feedback regarding usage and responses to questions asked of the consumers.   
*Study will include consumer interaction with the prototypes and collection of feedback regarding usage and responses to questions asked of the consumers.   


'''Schedule'''
'''Schedule'''
*Value proposition validation - Oct. 24 - early November   Status: On Target
*Value proposition validation - Oct. 24 - early November
*Prototype development: month of October    Status: Completed - fixing bugs now
*Prototype development: month of October     
*Assembly of devices: week of October 31    Status: Nearly Completed - working on loose connections
*Assembly of devices: week of October 31     
*Testing in homes: November 7 - 18          Status: On Target - home visits are being scheduled
*Testing in homes: November 7 - 18           
*Data synthesis from pilot and video/landing page studies: November 21 - 29
*Data synthesis from pilot and video/landing page studies: November 21 - 29
*Gate 1 pitch: November 30
*Gate 1 pitch: November 30
Line 142: Line 135:
*Game ON! was approved to proceed through Gate 0.
*Game ON! was approved to proceed through Gate 0.
*Approval was granted to add a UX resource and an electrical engineering resource to the team.  
*Approval was granted to add a UX resource and an electrical engineering resource to the team.  
*Gate 1 pitch: Mid January, 2017
*Wiki will be developed and made available
*Wiki will be developed and made available
*Check in with the team in the #gameON IRC channel.  
*Check in with the team in the #gameON IRC channel.  
Line 148: Line 142:
[[File:Game ON Prototype landscape.JPG|500px]]
[[File:Game ON Prototype landscape.JPG|500px]]
*Looking at 3D printing with conductive ABS filament for possible experimentation with capacitive technologies for some of our accessories such as the spinner or figures.  
*Looking at 3D printing with conductive ABS filament for possible experimentation with capacitive technologies for some of our accessories such as the spinner or figures.  
*Working on dynamics for new games using existing simulator
*Game play is working end to end, and a [https://www.youtube.com/watch?v=5dGaiOGcQ9w&feature=youtu.be demo of the game board] has been recorded.  
*Game play is working end to end, and a [https://www.youtube.com/watch?v=5dGaiOGcQ9w&feature=youtu.be demo of the game board] has been recorded.  
'''Research'''
'''Research'''
Line 161: Line 156:
! style="background:#00EC00;" | On Target
! style="background:#00EC00;" | On Target
|
|
* Bulleted list item
'''Engineering'''
* Bulleted list item
*Lighthouse prototype was successfully demonstrated to leadership team this week.
*Voice prompts now in place to prompt user as to how to use the camera - photo capture, object description, confirmation
*Re-engineered how most of the background behind an object is removed to make the match easier and quicker.
 
[[File:Lighthouse prototype for study 1.jpg|300px]]
[[File:Lighthouse prototype for study 2.jpg|300px]]
 
'''User Studies'''
*Team has built prototypes to test over the next couple weeks with study participants who are blind. Finalizing the plan for how to conduct the prototype study and the questions to ask.  Working on logistics for the shopping trip, use of the prototype, feedback to collect.
**Shopping trip - Photos will be taken of items they need to buy while in the store, with the participants' descriptions of the items recorded and stored with the images.
**Image matching session - Items purchased in the store will be brought to the Santa Clara Valley Blind Center to test the image matching.
*Product study with 25 participants - Session at the SCVBC scheduled for November 18th to gauge reaction to and to gain impressions of various form factors.
 
'''Schedule'''
*Complete development of prototype: October
*Assemble prototypes: Oct 31 - Nov 4
*Prototype pilot: Nov 7 - 18
*Data synthesis from pilot and video/landing page studies: November 21 - 29
*Gate 1 pitch: November 30
|-
|-
| 3D Printing
| 3D Printing

Revision as of 16:47, 3 November 2016

<< Connected Devices Weekly Updates Home

Program Passed Gate Status Notes
Project Sensor Web Cindy/Jean Gate 1 On Target
  • Bulleted list item
  • Bulleted list item
Project_Haiku (taking in Project Smart Display) Liz/Joe/Mahe Gate 0 On Target
  • Bulleted list item
  • Bulleted list item
Platform and Tools Sandip/Nicole N/A On Target

Design Document

Platform extraction

  • Platform team in dialog with track 1 product teams on understanding possible reusable components, as well as abstractions needed.
  • Current examples include
    • Communication/Security - (Game ON, Haiku using webRTC)
    • User mgmt - (Sensorweb, potentially some others like project Magnet?)
    • Mash up services (Project Magnet)
  • This will help prioritizing the building & abstraction of reusable components to resource and timebox them.

Weekly Notes:

Voice Platform - Deep Speech Sandip/Nicole N/A On Target
  • Bulleted list item
  • Bulleted list item
Abigail Preeti/Julie Gate 0 On Target

Concept Validation Testing

  • Study was started October 28th to test a couple concepts for the Abigail product: 1) Smart Family Tracker and 2) Smart Reminders for the Whole Family
  • A Facebook campaign has been active since October 26th to test consumer interest using different product concepts. Data is coming in on how well this is driving consumers to Abigail product page.

Model of Abigail.png

  • Revisiting how to produce a video to showcase all the functionality that Abigail can provide.

Engineering

  • Spending this week ensuring end-to-end use cases work, testing code, bug fixing. Working on getting voice commands with user names working.
  • Working on 5 prototype devices and preparing them for use in the study. Working on a problem identified with flaky accelerometer connections. Fixing a problem with loose jumper wires.

Abigail Study Prototype 1.jpg Abigail Study Prototype 2.jpg

Abigail Study with Prototypes

  • Finishing up work on a prototype study guide that will be used during the visits to participant homes.
  • Scheduling participant sessions. The first will be held November 11th. Abigail team members will be interviewing the participants and observing their interactions with the Abigail prototypes through the week of November 14th.
  • Study will include consumer interaction with the prototypes and collection of feedback regarding usage and responses to questions asked of the consumers.

Schedule

  • Value proposition validation - Oct. 24 - early November
  • Prototype development: month of October
  • Assembly of devices: week of October 31
  • Testing in homes: November 7 - 18
  • Data synthesis from pilot and video/landing page studies: November 21 - 29
  • Gate 1 pitch: November 30
Project Magnet David/Maria Gate 0 On Target

Mozfest

  • Project Magnet team
    • London team attended to the Science Fair (Friday), they presented Magnet app with the new Virtual Beacon experience. Warm welcome and really good one to one feedback.
    • Contacted to several storytellers interested in use Magnet as a channel to provide content in the future
  • Mozfestation application: Dietrich, Liz and Katie run an experiment based on our app during Mozfest
    • With very small changes in the Magnet app (as adding a counter of the beacons discovered with mozfest URL), 100 beacons were distributed in the venues encouraging people to visit all the ideas and spaces at Mozfest to discover them.
    • With the info provided from Magnet server during the experiment, Mozfest team could track people movements and create a heat map of the spaces.
  • The game was a success, and that's the reason we are right now exploring the call of adventure (gamification) and completeness as possible features in the UX of Magnet to make it more engaging/compelling for future versions. Storytellers could also provide a reward encouraging people subscribed to their channels to visit more POIs

Magnet status

  • This week we will finish our second sprint Sprint 7
    • In the client side Channels subscription is almost ready in iOS and Android and the team is working on the buzz notifications
    • Server side: most of the work done, still working on an issue regarding to the 'extra_metadata' returned from the content service.
    • Research product/solution fit: Landing page test for pre-signups and app downloads from Londoners is ready. Doing a small test run on the ads over next 2 day, then will choose and do a longer run.
                          Magnet campaign 1.png
  • Gate 1 scheduled on Dec 21st
HomeWeb Ben/Mahe Gate 0 On Target

Project homeweb wordmark.png

  • Progress on WiFi camera integration (WPS/ONVIF)
  • Progress on sensor integration (ZigBee)
  • Identified some backup hardware options in case the current hardware doesn't meet our needs
  • Helpful feedback on landing page experiment/survey from User Research (Thanks Rina/Mihaela!)
  • Landing page created in Unbounce
  • Finishing off creating survey in SurveyGizmo
  • Waiting on input from Marketing including a potential Twitter ad campaign

Latest landing page design:

HomeWeb landing page.png

GameON! Candice/Julie Gate 0 On Target

Gate 0 Pitch

  • Gate 0 Pitch was presented to the PIB on October 27th.
  • Game ON! was approved to proceed through Gate 0.
  • Approval was granted to add a UX resource and an electrical engineering resource to the team.
  • Gate 1 pitch: Mid January, 2017
  • Wiki will be developed and made available
  • Check in with the team in the #gameON IRC channel.

Engineering

  • Work is now focused on building a PCB and eliminating all the wires currently necessary for connections.

Game ON Prototype landscape.JPG

  • Looking at 3D printing with conductive ABS filament for possible experimentation with capacitive technologies for some of our accessories such as the spinner or figures.
  • Working on dynamics for new games using existing simulator
  • Game play is working end to end, and a demo of the game board has been recorded.

Research

  • Continuing research into competitor products, possible game ideas.
  • Continuing to identify the best use cases.

Consumer Studies

  • Planning for prototype testing can proceed now that the project has Gate 0 approval.
  • Team is consulting with the research team on development of a study to test consumer response to the product.
Lighthouse Preeti/Julie Gate 0 On Target

Engineering

  • Lighthouse prototype was successfully demonstrated to leadership team this week.
  • Voice prompts now in place to prompt user as to how to use the camera - photo capture, object description, confirmation
  • Re-engineered how most of the background behind an object is removed to make the match easier and quicker.

Lighthouse prototype for study 1.jpg Lighthouse prototype for study 2.jpg

User Studies

  • Team has built prototypes to test over the next couple weeks with study participants who are blind. Finalizing the plan for how to conduct the prototype study and the questions to ask. Working on logistics for the shopping trip, use of the prototype, feedback to collect.
    • Shopping trip - Photos will be taken of items they need to buy while in the store, with the participants' descriptions of the items recorded and stored with the images.
    • Image matching session - Items purchased in the store will be brought to the Santa Clara Valley Blind Center to test the image matching.
  • Product study with 25 participants - Session at the SCVBC scheduled for November 18th to gauge reaction to and to gain impressions of various form factors.

Schedule

  • Complete development of prototype: October
  • Assemble prototypes: Oct 31 - Nov 4
  • Prototype pilot: Nov 7 - 18
  • Data synthesis from pilot and video/landing page studies: November 21 - 29
  • Gate 1 pitch: November 30
3D Printing Thomas Pre Gate 0 On Target
  • Bulleted list item
  • Bulleted list item
Participation Update Michael/Brian -- On Target
  • Bulleted list item
  • Bulleted list item
Market Developments Update Irina
  • Amazon & Alexa
    • Alexa now works with Logitech's Harmony Hub
    • Alexa will be available on Amazon Fire tablets
    • Amazon expanded the Dash program to include more products and more countries
  • Air pollution
    • When pollution levels rise in Manhattan, stocks take a dive, according to a study from researchers at the University of Ottawa and Columbia University. One standard deviation increase in air pollution decreases returns by 11.9%. The research follows on previous findings of a link between the Air Quality Index and stock returns on fours US exchanges.
    • Several government officials in the Shanxi province of China have been arrested in connection with an effort to mislead and falsify air quality data. They are accused of obscuring the filters with cotton to purify the air samples taken by the air quality stations.
  • IoT platforms & security
    • Samsung expanded its ARTIK IoT platform with 2 new modules: one for low-power and cost-optimized devices and one for high-end gateways and multimedia applications. The modules are designed to work out of the box with the Samsung ARTIK Cloud, an open data-exchange platform which allows device manufacturers to monitor and manage both end-points and gateways.
    • Microsoft introduced a Security Program for the Azure IoT platform. The program brings together a curated set of security auditors that developers can choose from to perform a security audit on their IoT solutions, find issues and provide recommendations. The Security Program for Azure IoT will work from the ground up, examining everything from a businesses’ devices and assets to gateways and even communication to the cloud.
    • Intel announced its latest generation of Atom processors for IoT applications. The chipsets are optimized to enable some of the processing needs of IoT systems to happen at or near the data sensor to alleviate the need to push all processing to the data center.
Other Announcements / Questions -- --