Connected Devices Weekly Update/2016-11-03: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
(Added Lighthouse update) |
||
Line 60: | Line 60: | ||
! style="background:#00EC00;" | On Target | ! style="background:#00EC00;" | On Target | ||
| | | | ||
'''Concept Validation Testing''' | '''Concept Validation Testing''' | ||
*Study was started October 28th to test a couple concepts for the Abigail product: 1) Smart Family Tracker and 2) Smart Reminders for the Whole Family | *Study was started October 28th to test a couple concepts for the Abigail product: 1) Smart Family Tracker and 2) Smart Reminders for the Whole Family | ||
*A Facebook campaign has been active since October 26th to test consumer interest using different product concepts. Data is coming in on how well this is driving consumers to Abigail product page. | *A Facebook campaign has been active since October 26th to test consumer interest using different product concepts. Data is coming in on how well this is driving consumers to [http://www.mozilla-campaigns.org/project-abigail-product-page/ Abigail product page]. | ||
[[File:Model of Abigail.png|300px]] | |||
*Revisiting how to produce a video to showcase all the functionality that Abigail can provide. | *Revisiting how to produce a video to showcase all the functionality that Abigail can provide. | ||
'''Engineering''' | |||
*Spending this week ensuring end-to-end use cases work, testing code, bug fixing. Working on getting voice commands with user names working. | |||
*Working on 5 prototype devices and preparing them for use in the study. Working on a problem identified with flaky accelerometer connections. Fixing a problem with loose jumper wires. | |||
[[File:Abigail Study Prototype 1.jpg|300px]] | |||
[[File:Abigail Study Prototype 2.jpg|300px]] | |||
'''Abigail Study with Prototypes''' | '''Abigail Study with Prototypes''' | ||
*Finishing up work on a prototype study guide that will be used during the visits to participant homes. | *Finishing up work on a prototype study guide that will be used during the visits to participant homes. | ||
*Scheduling participant sessions. The first will be held November 11th. Abigail team members will be interviewing the participants and observing their interactions with the Abigail prototypes. | *Scheduling participant sessions. The first will be held November 11th. Abigail team members will be interviewing the participants and observing their interactions with the Abigail prototypes through the week of November 14th. | ||
*Study will include consumer interaction with the prototypes and collection of feedback regarding usage and responses to questions asked of the consumers. | *Study will include consumer interaction with the prototypes and collection of feedback regarding usage and responses to questions asked of the consumers. | ||
'''Schedule''' | '''Schedule''' | ||
*Value proposition validation - Oct. 24 - early November | *Value proposition validation - Oct. 24 - early November | ||
*Prototype development: month of October | *Prototype development: month of October | ||
*Assembly of devices: week of October 31 | *Assembly of devices: week of October 31 | ||
*Testing in homes: November 7 - 18 | *Testing in homes: November 7 - 18 | ||
*Data synthesis from pilot and video/landing page studies: November 21 - 29 | *Data synthesis from pilot and video/landing page studies: November 21 - 29 | ||
*Gate 1 pitch: November 30 | *Gate 1 pitch: November 30 | ||
Line 142: | Line 135: | ||
*Game ON! was approved to proceed through Gate 0. | *Game ON! was approved to proceed through Gate 0. | ||
*Approval was granted to add a UX resource and an electrical engineering resource to the team. | *Approval was granted to add a UX resource and an electrical engineering resource to the team. | ||
*Gate 1 pitch: Mid January, 2017 | |||
*Wiki will be developed and made available | *Wiki will be developed and made available | ||
*Check in with the team in the #gameON IRC channel. | *Check in with the team in the #gameON IRC channel. | ||
Line 148: | Line 142: | ||
[[File:Game ON Prototype landscape.JPG|500px]] | [[File:Game ON Prototype landscape.JPG|500px]] | ||
*Looking at 3D printing with conductive ABS filament for possible experimentation with capacitive technologies for some of our accessories such as the spinner or figures. | *Looking at 3D printing with conductive ABS filament for possible experimentation with capacitive technologies for some of our accessories such as the spinner or figures. | ||
*Working on dynamics for new games using existing simulator | |||
*Game play is working end to end, and a [https://www.youtube.com/watch?v=5dGaiOGcQ9w&feature=youtu.be demo of the game board] has been recorded. | *Game play is working end to end, and a [https://www.youtube.com/watch?v=5dGaiOGcQ9w&feature=youtu.be demo of the game board] has been recorded. | ||
'''Research''' | '''Research''' | ||
Line 161: | Line 156: | ||
! style="background:#00EC00;" | On Target | ! style="background:#00EC00;" | On Target | ||
| | | | ||
* | '''Engineering''' | ||
* | *Lighthouse prototype was successfully demonstrated to leadership team this week. | ||
*Voice prompts now in place to prompt user as to how to use the camera - photo capture, object description, confirmation | |||
*Re-engineered how most of the background behind an object is removed to make the match easier and quicker. | |||
[[File:Lighthouse prototype for study 1.jpg|300px]] | |||
[[File:Lighthouse prototype for study 2.jpg|300px]] | |||
'''User Studies''' | |||
*Team has built prototypes to test over the next couple weeks with study participants who are blind. Finalizing the plan for how to conduct the prototype study and the questions to ask. Working on logistics for the shopping trip, use of the prototype, feedback to collect. | |||
**Shopping trip - Photos will be taken of items they need to buy while in the store, with the participants' descriptions of the items recorded and stored with the images. | |||
**Image matching session - Items purchased in the store will be brought to the Santa Clara Valley Blind Center to test the image matching. | |||
*Product study with 25 participants - Session at the SCVBC scheduled for November 18th to gauge reaction to and to gain impressions of various form factors. | |||
'''Schedule''' | |||
*Complete development of prototype: October | |||
*Assemble prototypes: Oct 31 - Nov 4 | |||
*Prototype pilot: Nov 7 - 18 | |||
*Data synthesis from pilot and video/landing page studies: November 21 - 29 | |||
*Gate 1 pitch: November 30 | |||
|- | |- | ||
| 3D Printing | | 3D Printing |
Revision as of 16:47, 3 November 2016
<< Connected Devices Weekly Updates Home
Program | Passed Gate | Status | Notes | |
---|---|---|---|---|
Project Sensor Web | Cindy/Jean | Gate 1 | On Target |
|
Project_Haiku (taking in Project Smart Display) | Liz/Joe/Mahe | Gate 0 | On Target |
|
Platform and Tools | Sandip/Nicole | N/A | On Target |
Design Document
Platform extraction
Weekly Notes: |
Voice Platform - Deep Speech | Sandip/Nicole | N/A | On Target |
|
Abigail | Preeti/Julie | Gate 0 | On Target |
Concept Validation Testing
Engineering
Abigail Study with Prototypes
Schedule
|
Project Magnet | David/Maria | Gate 0 | On Target |
Mozfest
Magnet status
|
HomeWeb | Ben/Mahe | Gate 0 | On Target |
Latest landing page design: |
GameON! | Candice/Julie | Gate 0 | On Target |
Gate 0 Pitch
Engineering
Research
Consumer Studies
|
Lighthouse | Preeti/Julie | Gate 0 | On Target |
Engineering
User Studies
Schedule
|
3D Printing | Thomas | Pre Gate 0 | On Target |
|
Participation Update | Michael/Brian | -- | On Target |
|
Market Developments Update | Irina |
| ||
Other Announcements / Questions | -- | -- |