QA/Browser Technologies/2010-05-06: Difference between revisions
< QA | Browser Technologies
Jump to navigation
Jump to search
m (→Round Table) |
|||
Line 47: | Line 47: | ||
= Round Table = | = Round Table = | ||
* | * uTest and Waverly (matt) | ||
** Utest will work with performance and load testing with weave 1.3 against production servers | |||
** dry run sync tests on friday (no load), then repeat tests on tuesday after load test have been ran | |||
** includes exploratory testing | |||
* item 2 | * item 2 | ||
Revision as of 20:33, 6 May 2010
« previous mtg | Browser Technologies Home | next mtg »
Discussion Items
- BT projects targeting Fx4.0beta (tchung)
- Slides say late june for beta1
- Weave, Jetpack, Testpilot, Account Manager targeted
- Weave for Iphone Plan (tchung)
- Opt into the beta program that caitlin sent out. only 100 seats available.
- Will be owned by fennec team, not Weave team
- BT Calender of Events
- Ayan (6-month intern) starting May 10th
- Aakash mentor
- Tasklist here.
- Tomcat's meetup for demos
- He'll be showing off Desktop/n900 fennec, weave, and maybe iphone sync
- Any other ideas for him?
Project Status
- Fennec
- Client update (aakashd)
- String Freeze tomorrow; Code Freeze on the 13th
- FFT is up and currently triaging through there
- Automation update (martijn)
- Getting stuff set up on my machine. Jmaher is helping me out a lot. He's written some good documentation on the wiki for it. When I have all set up (for reftest, crashtest, mochitest, browser-chrome test) and running, I'll start working on the browser-chrome tests.
- Client update (aakashd)
- Weave (tracy)
- Appear to be on schedule for release of 1.3 on May 17.
- Several fixes went into the account manager flows for b3 and b4.
- Weave for iphone will be off-cycle within the 1.3 timeline
- Test pilot (tracy)
- The team is primarily focused on studies at this time. No important extension changes.
- Jetpack (tchung)
- Jetpack 0.3 is out!
- Jetpack 0.4 targeted end of May. 0.5; end of June
- Ayan to work this summer with extension development
Round Table
- uTest and Waverly (matt)
- Utest will work with performance and load testing with weave 1.3 against production servers
- dry run sync tests on friday (no load), then repeat tests on tuesday after load test have been ran
- includes exploratory testing
- item 2
Takeaways and Action Items
- item 1
- item 2