* BT projects targeting Fx4.0beta (tchung) | |||
** Slides say late june for beta1 | |||
** Weave, Jetpack, Testpilot, Account Manager targeted | |||
* | * Weave for Iphone Plan (tchung) | ||
* | ** Opt into the beta program that caitlin sent out. only 100 seats available. | ||
** Will be owned by fennec team, not Weave team | |||
* BT Calender of Events | |||
** Add to google Cal: http://www.google.com/calendar/embed?src=m42o9ivukgvpn17bvalf4iv0mk%40group.calendar.google.com&ctz=America/Los_Angeles | |||
* Ayan (6-month intern) starting May 10th | |||
** Aakash mentor | |||
** Tasklist [https://intranet.mozilla.org/2010Interns/QA#Ayan_Shah here]. | |||
* Tomcat's meetup for demos | |||
** He'll be showing off Desktop/n900 fennec, weave, and maybe iphone sync | |||
** Any other ideas for him? | |||
** come up with a fluid test on all products (eg. search google maps on firefox, sync to weave | |||
= Project Status = | = Project Status = | ||
* | * Fennec | ||
* | ** Client update (aakashd) | ||
*** String Freeze tomorrow; Code Freeze on the 13th | |||
*** FFT is up and currently triaging through there | |||
** Automation update (martijn) | |||
*** Getting stuff set up on my machine. Jmaher is helping me out a lot. He's written some good documentation on the wiki for it. When I have all set up (for reftest, crashtest, mochitest, browser-chrome test) and running, I'll start working on the browser-chrome tests. | |||
* Weave (tracy) | |||
** Appear to be on schedule for release of 1.3 on May 17. | |||
** Several fixes went into the account manager flows for b3 and b4. | |||
** Weave for iphone will be off-cycle within the 1.3 timeline | |||
* Test pilot (tracy) | |||
** The team is primarily focused on studies at this time. No important extension changes. | |||
* Jetpack (tchung) | |||
** Jetpack 0.3 is out! | |||
** Jetpack 0.4 targeted end of May. 0.5; end of June | |||
** Ayan to work this summer with extension development | |||
= Round Table = | = Round Table = | ||
* | * uTest and Waverly (matt) | ||
* | ** Utest will work with performance and load testing with weave 1.3 against production servers | ||
*** dry run sync tests on friday (no load), then repeat tests on tuesday after load test have been ran | |||
*** includes exploratory testing | |||
** Waverly contract also signed, will have n900 | |||
*** perform smoketests and bfts on a nightly basis | |||
*** want a consistent set of tests ran daily, so we can track results over time (also effective set of exploratory tests, eg. Hulu, gmail, tabs, etc..) | |||