Line 22: | Line 22: | ||
** He'll be showing off Desktop/n900 fennec, weave, and maybe iphone sync | ** He'll be showing off Desktop/n900 fennec, weave, and maybe iphone sync | ||
** Any other ideas for him? | ** Any other ideas for him? | ||
** come up with a fluid test on all products (eg. search google maps on firefox, sync to weave | |||
= Project Status = | = Project Status = | ||
Line 47: | Line 48: | ||
= Round Table = | = Round Table = | ||
* | * uTest and Waverly (matt) | ||
* | ** Utest will work with performance and load testing with weave 1.3 against production servers | ||
*** dry run sync tests on friday (no load), then repeat tests on tuesday after load test have been ran | |||
*** includes exploratory testing | |||
** Waverly contract also signed, will have n900 | |||
*** perform smoketests and bfts on a nightly basis | |||
*** want a consistent set of tests ran daily, so we can track results over time (also effective set of exploratory tests, eg. Hulu, gmail, tabs, etc..) | |||
= Takeaways and Action Items = | = Takeaways and Action Items = |
Latest revision as of 20:40, 6 May 2010
« previous mtg | Browser Technologies Home | next mtg »
Discussion Items
- BT projects targeting Fx4.0beta (tchung)
- Slides say late june for beta1
- Weave, Jetpack, Testpilot, Account Manager targeted
- Weave for Iphone Plan (tchung)
- Opt into the beta program that caitlin sent out. only 100 seats available.
- Will be owned by fennec team, not Weave team
- BT Calender of Events
- Ayan (6-month intern) starting May 10th
- Aakash mentor
- Tasklist here.
- Tomcat's meetup for demos
- He'll be showing off Desktop/n900 fennec, weave, and maybe iphone sync
- Any other ideas for him?
- come up with a fluid test on all products (eg. search google maps on firefox, sync to weave
Project Status
- Fennec
- Client update (aakashd)
- String Freeze tomorrow; Code Freeze on the 13th
- FFT is up and currently triaging through there
- Automation update (martijn)
- Getting stuff set up on my machine. Jmaher is helping me out a lot. He's written some good documentation on the wiki for it. When I have all set up (for reftest, crashtest, mochitest, browser-chrome test) and running, I'll start working on the browser-chrome tests.
- Client update (aakashd)
- Weave (tracy)
- Appear to be on schedule for release of 1.3 on May 17.
- Several fixes went into the account manager flows for b3 and b4.
- Weave for iphone will be off-cycle within the 1.3 timeline
- Test pilot (tracy)
- The team is primarily focused on studies at this time. No important extension changes.
- Jetpack (tchung)
- Jetpack 0.3 is out!
- Jetpack 0.4 targeted end of May. 0.5; end of June
- Ayan to work this summer with extension development
Round Table
- uTest and Waverly (matt)
- Utest will work with performance and load testing with weave 1.3 against production servers
- dry run sync tests on friday (no load), then repeat tests on tuesday after load test have been ran
- includes exploratory testing
- Waverly contract also signed, will have n900
- perform smoketests and bfts on a nightly basis
- want a consistent set of tests ran daily, so we can track results over time (also effective set of exploratory tests, eg. Hulu, gmail, tabs, etc..)
- Utest will work with performance and load testing with weave 1.3 against production servers
Takeaways and Action Items
- item 1
- item 2