QA/Test Automation/2010-11-17: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
Line 17: Line 17:


= Project Status =
= Project Status =
== Tests / Shared Modules ==
; General (Henrik)
* Waiting for Clint's proposal how to do Drag&Drop - needed for Panorama tests
; Broken Tests
* Firefox 4.0 (Geo)
* Firefox 3.5/3.6 (Anthony)
** Landed waitForTabPanel() to make notification bar handling more reliable (5 of top-10 fails resolved)
; DOM Walker + L10n API (Adrian)
* final review stages
; Redesign Shared Modules (Geo)
; Test Refactoring (Anthony)
* Draft styleguide being composed (targetting EOW)
* Begin refactoring once styleguide approved
; Local Test Data (Anthony)
* No progress yet - considering community outreach to create testpages
** 35 tests are already local
** 4 tests remain which can be made local
** remainder are not doable in Mozmill
** not much value-add
; Update Testing (Henrik)
* Currently we fail in downloading partial updates because the about window and the old ui are blocking each other. (bug 599290)
** Attached is a workaround patch
* We will have to update the shared module asap to be able to test the new ui
; Add-ons Testing (Henrik)
* With Mozmill 1.5.1 add-on authors should be able to create tests now. But should we wait with advertisement until shared modules have been refactored?
* Dave is working on tests for the Selenium IDE extension
; Mozmill Crowd Extension (Henrik)
* In contact with Patrick Brunswig regarding IPC-PIPE regression. Will still use nsIProcess to prevent possible other upcoming regressions
; Mozmill Result Dashboard (Henrik)
* Waiting to land patches for software update tests (multiple updates)
; Automation / Infrastructure (Henrik)
* Investigating possible notification exchange between RelEng/QA for triggered test-runs


= Personal Status =
= Personal Status =

Revision as of 14:52, 18 November 2010

previous meeting | Meetings | next meeting »

Dial in

 # 650-903-0800 or 650-215-1282 x92 Conf# 315 (US/INTL)
 # 1-800-707-2533 (pin 369) Conf# 315 (US)
 # irc.mozilla.org #mozmill for backchannel

Attendees

  • Cameron, Geo, Al, Matt, Anthony, Aaron, Adrian, Henrik, Dave

Last weeks action Items

Goals Overview

Risky Goals

Project Status

Tests / Shared Modules

General (Henrik)
  • Waiting for Clint's proposal how to do Drag&Drop - needed for Panorama tests
Broken Tests
  • Firefox 4.0 (Geo)
  • Firefox 3.5/3.6 (Anthony)
    • Landed waitForTabPanel() to make notification bar handling more reliable (5 of top-10 fails resolved)
DOM Walker + L10n API (Adrian)
  • final review stages
Redesign Shared Modules (Geo)
Test Refactoring (Anthony)
  • Draft styleguide being composed (targetting EOW)
  • Begin refactoring once styleguide approved
Local Test Data (Anthony)
  • No progress yet - considering community outreach to create testpages
    • 35 tests are already local
    • 4 tests remain which can be made local
    • remainder are not doable in Mozmill
    • not much value-add
Update Testing (Henrik)
  • Currently we fail in downloading partial updates because the about window and the old ui are blocking each other. (bug 599290)
    • Attached is a workaround patch
  • We will have to update the shared module asap to be able to test the new ui
Add-ons Testing (Henrik)
  • With Mozmill 1.5.1 add-on authors should be able to create tests now. But should we wait with advertisement until shared modules have been refactored?
  • Dave is working on tests for the Selenium IDE extension
Mozmill Crowd Extension (Henrik)
  • In contact with Patrick Brunswig regarding IPC-PIPE regression. Will still use nsIProcess to prevent possible other upcoming regressions
Mozmill Result Dashboard (Henrik)
  • Waiting to land patches for software update tests (multiple updates)
Automation / Infrastructure (Henrik)
  • Investigating possible notification exchange between RelEng/QA for triggered test-runs

Personal Status

For the personal status please check the weekly status updates:

Roundtable

General
  • Results from work week
  • Endurance tests with Mozmill (see Etherpad document)
  • MozMill testday on Nov 26th?
    • Can we combine this testday with goals we want to see accomplished by end of this year?
    • What about help in refactoring the tests? That sounds like a great collaboration.
    • Help in fixing still remaining broken tests.
    • Getting feedback for the documentation, beside the notes Dave already has written down
    • Creation of test files for local test data project
  • Litmus vs. Mozmill tests
    • For the add-ons manager we have 60+ in-litmus requests. Do we want to have manual tests for all those requests or can we only implement those which really need manual action?
  • Other
    • Etherpad
      • Any comments? What do you like? What don't you like? Any suggestions?
        • I can directly see the status of any team member without having to look at their status reports (Henrik)
        • I can see discussions even when I was offline (Henrik)
        • Etherpad makes it so easy and fast to edit content compared to the wiki (Henrik)
Issues

Meeting Notes

Action Items