What's been completed: | |||
* fwenzel | |||
** release 3.1 | |||
*davedash | |||
** finished 3.2 bugs | |||
* ryansnyder | |||
** knocked out 3.2 bugs | |||
* michaelk | |||
** | |||
* mbrandt/rbillings | |||
** wrote some automated tests for Input | |||
* aakashd | |||
** | |||
What we aim to do and when do we expect to accomplish them: | |||
* fwenzel | |||
*# release input 3.2 | |||
*# follow-up with michaelk for clustering | |||
*# triage 3.3 | |||
* davedash | |||
*# work on all bugs for 3.3 | |||
* ryansnyder | |||
*# will work on bugs assigned to me by next monday | |||
* michaelk | |||
*# | |||
* mbrandt/rbillings | |||
*# work on test failures | |||
* aakashd | |||
*# have meetings about 4.x Input stuff | |||
*# scope out 3.4 and 4.x work | |||
*# start on a PRD | |||
== 3.1 == | == 3.1 == |
Revision as of 18:20, 22 February 2011
Meeting Notes
3.2
2-22-2011
What's been completed:
- fwenzel
- release 3.1
- davedash
- finished 3.2 bugs
- ryansnyder
- knocked out 3.2 bugs
- michaelk
- mbrandt/rbillings
- wrote some automated tests for Input
- aakashd
What we aim to do and when do we expect to accomplish them:
- fwenzel
- release input 3.2
- follow-up with michaelk for clustering
- triage 3.3
- davedash
- work on all bugs for 3.3
- ryansnyder
- will work on bugs assigned to me by next monday
- michaelk
- mbrandt/rbillings
- work on test failures
- aakashd
- have meetings about 4.x Input stuff
- scope out 3.4 and 4.x work
- start on a PRD
3.1
2-15-2011
What's been completed:
- fwenzel
- good for release
- most of 3.2 work has been completed
- davedash
- input 3.2
- ryansnyder
- worked on 3.2 and mobile submission pages
- michaelk
- working on clustering service
- mbrandt/rbillings
- qa verified 3.1, looks good
- trying to wrap around automation for Input
- aakashd
- got t-shirts in and gave to folks in the office
What we aim to do and when do we expect to accomplish them:
- fwenzel
- release input 3.1
- need to determine if 3.2
- davedash
- stragglers for 3.2
- ryansnyder
- finish up some 3.2 bugs, but they're low-priority
- michaelk
- trying to push for big clusters for 3.3 release
- mbrandt/rbillings
- look into inconsistent failures
- aakashd
- send t-shirts out
- scope out 3.4 and 4.x work
2-1-2011
What's been completed:
- fwenzel
- reviewing 3.1 patches
- davedash
- finished release dashboard for rate
- ryansnyder
- mostly done with mobile submission pages
- michaelk
- sites theme is done on branch, now waiting
- rebecca
- worked on SUMO and started ramping up Matt
- aakashd
- did the lightning talk about input
- talking to vendors and lee
What we aim to do and when do we expect to accomplish them:
- fwenzel
- file bugs for 3.2 and 3.3
- davedash
- finishing up on release dashboard
- ryansnyder
- fixed 3.1 bugs
- michaelk
- waiting for versioning stuff to land, then will rebase and push it
- rebecca
- verify bugs and get ready for release
- work with matt
- aakashd
- get t-shirt orders done
Flags:
3.0
1-25-2011
What's been completed:
- fwenzel
- assigned bugs for 3.1
- working on channel switcher
- davedash
- channels framework work
- middleware decides which channel you're in
- ryansnyder
- refactoring 3.1 work
- dealing with failing tests in sandbox due to changes from 3.0 to 3.1
- michaelk
- QA'd export to tsv work
- rebecca
- verified/filed all 3.0 bugs
- aakashd
- did the brownbag and created a follow-up doc on use cases for input
- talking to vendors
What we aim to do and when do we expect to accomplish them:
- fwenzel
- finish channel switcher
- finish review requests
- davedash
- finishing up on release dashboard
- ryansnyder
- fixed 3.1 bugs
- michaelk
- review request for broken sites on major release dashboard
- bugzilla work is piling up and need to work on that
- rebecca
- wrap-up testing for 3.0
- SUMO release on Wednesday
- aakashd
- get t-shirt orders done
- write up a mini-search plugin
Flags:
- Need celery set up to use the export to tsv button on admin
1-18-2011
What's been completed:
- fwenzel
- 3.0 is code and string frozen
- davedash
- added themes work for "All"
- ryansnyder
- finished 3.0 bugs
- michaelk
- copy ux
- rebecca
- verified/filed bugs
- aakashd
- posted a screencast of basic features on input
- set up testday with localizers
What we aim to do and when do we expect to accomplish them:
- fwenzel
- need to fix a css and rendering bug
- Assign bugs for 3.1
- davedash
- will work on previous beta theme reports
- make links permanent
- ryansnyder
- will look at 3.1 bugs
- a little bit
- michaelk
- work on 3.1 bugs
- rebecca
- emergency training and SUMO training
- will file and verify bugs
- aakashd
- work on brownbag, 1/20
- have a testday on bugdays/testdays with localizers
1-11-2011
What's been completed:
- fwenzel
- fixing bugs with 4 left on 3.0
- worked on 3.x roadmap
- talked to jono about feedback add-on on beta channel
- davedash
- prioritized themes bugs and started work on versioning and "all" issues
- ryansnyder
- couple of bugs fixed
- michaelk
- copy ux
- stephend
- verifying bugs
- rebecca
- verifying bugs
- figured out user agent stuff
- aakashd
- created a brownbag
- sent out email to seth for triaging locale feedback
What we aim to do and when do we expect to accomplish them:
- fwenzel
- work with michaelk
- fix assigned bugs
- davedash
- work on themes work for 3.x
- ryansnyder
- fix remaining bugs, 1/12
- unavailable until next tuesday
- stephend
- rebecca
- verify 3.0 bugs
- follow-up on a ramp-up document on how to test Input (i.e. UA stuff)
- michaelk
- finish up remaining 3.0 bugs
- aakashd
- work on brownbag, 1/20
- work on bugdays/testdays with localizers
1-4-2011
What's been completed:
- fwenzel
- feedback submission landed on stage
- davedash
- ryansnyder
- getting environment on new laptop
- michaelk
- working on sites clustering
- stephend
- guided prathiba in writing testcases for input and getting ramped up with the app
- moving off of Input
- rebecca
- SUMO release being worked on
- reading over docs
- aakashd
- talked to gerv about deprecating hendrix -> http://weblogs.mozillazine.org/gerv/archives/2010/12/goodbye_hendrix.html
- https://bugzilla.mozilla.org/show_bug.cgi?id=622669
- worked on input 4.0 definition and mock-ups
What we aim to do and when do we expect to accomplish them:
- fwenzel
- work with michaelk
- fix assigned bugs
- davedash
- ryansnyder
- fix 3-4 assigned bugs
- stephend
- rebecca
- verify 3.0 bugs
- michaelk
- finish sites clusters metrics job to speed things up
- aakashd
- finish up input 4.0 mock-ups
- start work on the PRD
- start up education work with localizers on triaging input data into bugs
Flags:
- bug 620845 - cannot search for recently submitted feedback
- when its broken, its broken on staging and prod
- reproducible only sometimes
2.1
12-07-2010
What's been completed:
- fwenzel
- branching for 3.0
- davedash
- integrated ideas and mobile device type on dashboard
- ryansnyder
- committed work for 2.1
- michaelk
- started work on 2.1 bugs
- stephend
- on dedicated hardware with IT for staging
- not sure about performance testing, been cobbling...need a baseline
- aakashd
- look into bizdeving an open-source version of the library for AMO, Input and other projects, 12/3
- worked with juanb and ashughes on lesson plan for localizers
- mocked up client-side changes for major releases
What we aim to do and when do we expect to accomplish them:
- fwenzel
- branching for 3.0
- start assigning out issues for 3.0
- davedash
- fix remaining bugs for 2.1, 12/7
- ryansnyder
- start work on 3.0, 12/7
- stephend
- get a perf baseline, 12/9
- work on better coverage on automation
- rebecca billings for 3.0, 12/14
- michaelk
- finish off 2.1 bugs, 12/7
- ramp-up on 3.0, 12/14
- aakashd
- look into bizdeving an open-source version of the library for AMO, Input and other projects, 12/3
- work on getting input used by localizers, 12/9
- work on client-side changes to feedback add-on, 12/14
Flags:
- un-assigned bugs for 2.1
- Enable submissions on staging from mobile nightlies
11-30-2010
What's been completed:
- fwenzel
- released 2.0.1
- got device type working
- davedash
- worked on incorporating suggestions onto highchart and search
- ryansnyder
- pushed suggestions onto staging
- michaelk
- started work on 2.1 bugs
- stephend
- started work on automation with david burns
- aakashd
- working on input with localizer feedback per beta
- moar promotions in mobile firefox since people can't
What we aim to do and when do we expect to accomplish them:
- fwenzel
- finished off the traceback bug for 2.1, 11/30
- determine a time and schedule for code freeze, 12/3
- start work on submission pages for 3.0
- davedash
- ask IT for crons running on staging, 11/30
- get suggestions into search and line charts, 12/3
- get device type for mobile dashboard and search, 12/3
- ryansnyder
- fixing p2/p3's assigned for 2.1, 12/3
- stephend
- determine a more formal environment (i.e. where and when) to run qa tests on staging, 12/3
- continue on automation for Input
- michaelk
- finish off 2.1 bugs, 12/3
- aakashd
- look into bizdeving an open-source version of the library for AMO, Input and other projects, 12/3
- work on getting input used by localizers, 12/1
Flags:
- chowse is done with mock-ups, going forward with stylings for 3.0
- 3.0 vs 2.1: resourcing
- plan for bundling highcharts and using another library in the future
- staging
- '1day ago': the cron runs daily at noon
- determine a more formal environment (i.e. where and when) to run qa tests on staging
11-23-2010
What's been completed:
- fwenzel
- interesting push with IT, learned a lot more about release process
- davedash
- worked on releasing 2.0
- reviewed ideas
- ryansnyder
- got ideas reviewed
- michaelk
- stephend
- vish_moz is working on selenium tests; page object model is done
- prathiba is working on manual coverage
- aakashd
- created blogpost
- worked on 3.0 design work
What we aim to do and when do we expect to accomplish them:
- fwenzel
- release 2.0.1, 11/23
- will assign remaining 2.1 bugs
- davedash
- ideas integration
- ryansnyder
- fixing p2/p3's assigned for 2.1
- stephend
- slow on automation for input, will ask david burns to look into it
- check up on feedback submission issue
- michaelk
- aakashd
- talk with google user support about input, 11/30
- work on getting input used by localizers, 12/1
Flags:
- look at feedback submission issue on staging
- release 2.0.1 at 4pm today
2.0
11-16-2010
What's been completed:
- fwenzel
- fixed remaining small input 2.0 bugs
- davedash
- all-in with AMO, but helped out with some bugs for Input
- ryansnyder
- done with 2.1 and ready to merge after release
- michaelk
- stephend
- verified bugs
- created test run for input in litmus
- slow on automation for input
- aakashd
- sent out e-mail to l10n group for input triage
- worked with chowse on 3.0 mock-ups
What we aim to do and when do we expect to accomplish them:
- fwenzel
- hash out remaining bugs
- code freeze pushed out to 11/11, release date 11/16
- davedash
- start work on integrating ideas into graphs and search
- ryansnyder
- get in ideas and fix other 2.1 issues
- second priority
- stephend
- slow on automation for input, will ask david burns to look into it
- michaelk
- aakashd
- work on 2.0 blogpost
Flags:
- 4pm push; Dave Dash and krupa will be available.
- Dave will tag 2.0
11-9-2010
What's been completed:
- fwenzel
- fixing lots of p2's and assigning
- davedash
- incorporated search and high charts
- ryansnyder
- finished most of ideas
- michaelk
- stephend
- london
- aakashd
- finished NTT for mobile
- finished data challenge ideas/themes for dees
What we aim to do and when do we expect to accomplish them:
- fwenzel
- hash out remaining bugs
- code freeze pushed out to 11/11, release date 11/16
- davedash
- full-time committed to AMO
- ryansnyder
- rebase to 2.1 and work on ideas
- stephend
- verify everything after code freeze; litmus testcases
- michaelk
- aakashd
- work on 2.0 blogpost
11-2-2010
What's been completed:
- fwenzel
- graphs without data, passed down to dave to add in the data
- minified css/js files and improved YSlow score
- davedash
- finished faceted search
- ryansnyder
- 100% on socorro and have a rollout tonight
- michaelk
- finished a few sites
- stephend
- verified bugs, wrote some litmus testcases
- aakashd
- finished product roadmap blogpost
- talked to desigan about input and design challenges
What we aim to do and when do we expect to accomplish them:
- fwenzel
- work on copy user agent, 11/5
- look at p2's, 11/5
- davedash
- finish graphs, 11/2
- ryansnyder
- finish ideas, 11/3
- file a bug on search and graph work incorporating ideas, 11/2
- stephend
- in London for the week, krupa and vishal will occur on verifications and bug filing
- michaelk
- fix remaining 2.0 bugs, 11/5
- aakashd
- write out some data challenges, 11/5
Additional/Flags
- Data Challenges: improve clustering both in making the connections tighter and faster
10-26-2010
What's been completed:
- fwenzel
- worked on graphs and assignments
- davedash
- worked on faceted search
- ryansnyder
- worked mostly on Socorro
- michaelk
- fixed duplicate domain and other bugs
- stephend
- verified CSRF issues and 1.9 release
- aakashd
- finished 3.0 PRD
- set up a bunch of meetings on tuesday
What we aim to do and when do we expect to accomplish them:
- fwenzel
- finish graphs, 10/29
- davedash
- finish faceted search, 10/26
- ryansnyder
- work on ideas, 11/3
- stephend
- verified some bugs, start work on mobile stuff 10/29
- michaelk
- fix remaining 2.0 bugs, 11/3
- aakashd
- have a product planning meeting for 3.0
- post out product roadmap blogpost, 10/29
- work with design challenge folks, 10/29
10-19-2010
What's been completed:
- fwenzel
- 1.9 bugs and moving over to America
- davedash
- CSRF fun. Worked over the weekend
- ryansnyder
- Worked mostly on Socorro
- michaelk
- Class!
- stephend
- Verified CSRF issues and 1.9 release
- aakashd
- Finished 3.0 PRD
What we aim to do and when do we expect to accomplish them:
- fwenzel
- assign out 2.0 bugs
- davedash
- Work on faceted search
- ryansnyder
- Work on 2.0
- stephend
- Coverage is good, work on mobile coverage
- michaelk
- work on multiple sites and domains
- get any bugs related to product
- aakashd
- Create a product roadmap meeting
- Review finished 3.0 PRD
Notes:
- Thanks Dave!
1.9
10-12-2010
What's been completed:
- fwenzel
- 1.9 bugs
- davedash
- Fixed themes by product
- CSRF bug
- staging crons
- ryansnyder
- feedback landing page landed
- michaelk
- fixed ssl, product differentiation on sites
- can't work on differentiation
- stephend
- filed a bunch of bugs, verified mostly all bugs
- wrote some litmus testcases
- aakashd
- Worked on 3.0 PRD
- Talked to Dev Tools and Automation about Input on NTT
What we aim to do and when do we expect to accomplish them:
- fwenzel
- scrounging for 1.9 bugs
- davedash
- Work on 2.0 bugs
- ryansnyder
- Pick up 2.0 bugs
- Talk to michaelk on 10/6/ morning about remaining 1.9 bugs
- stephend
- Digure out what's going on with bug 602427, 10/14
- Continue verifying 1.9 bugs, 10/14
- Regression-test and file any bugs, 10/14
- Need to verify csrf bug, 10/12
- michaelk
- Working on 2.0 bugs
- aakashd
- Push back remaining 1.9 bugs to 2.0, 10/12
- Finish 3.0 PRD, 10/16
- Schedule a product planning meeting (10/25-10/29) about Input over the next 6-9 months, 10/25
10-05-2010
What's been completed:
- fwenzel
- Immigration stuff
- davedash
- CSRF bug, will finish this week
- Will look into bug 601015
- ryansnyder
- Working on Socorro
- stephend
- Prathiba should be writing testcases on litmus
- aakashd
- Talked to chowse and horlander about Input 2.0 and 3.0 icons
- Determine scalability of major release support
What we aim to do and when do we expect to accomplish them:
- fwenzel
- COMIN' TO THE USSAAA
- davedash
- I plan on tackling some of the 1.9 bugs that cropped up in the last day. I expect to have some time this or next week to dive into that.
- ryansnyder
- Back on Socorro through Tuesday, at which time I'll pick up Input 1.9 tickets, 10/12
- Talk to michaelk on 10/6/ morning about remaining 1.9 bugs
- stephend
- Circle back with Prathiba on litmus testcasea additions, 10/12
- Continue verifying 1.9 bugs, 10/12
- Regression-test and file any bugs, 10/12
- michaelk
- Working on bug 600209, 10/12
- aakashd
- Talk to Erik Moeller from Wikipedia, 10/6
- Get Input 2.0 & 3.0 icons and post into bugs, 10/8
- Started work on 3.0 PRD, 10/16
Notes:
- Stephend is unsure on how to get data on themes and sites
9-30-2010
What's been completed:
- fwenzel
- Working on movin' to America
- davedash
- Pushed 1.8 again with oremj
- Fixed Hudson
- http://bit.ly/babFBG
- ryansnyder
- Identified 1.8 did not get pushed in its entirety yesterday
- stephend
- Flagged several bugs for Litmus tests (to be written by
Pratihba/Rebecca/myself)
- Committed to 1.9/2.0
- aakashd
- Worked on scheduling/resourcing Input 2.0 with morgamic
- Stephen Horlander will have the Idea Submission icons ready to go by the end of this week or early next week
- Talked to chowse on availability on 2.0 features
What we aim to do and when do we expect to accomplish them:
- fwenzel
- Will poke my nose into 1.9 bugs, 10/1
- davedash
- I plan on tackling some of the 1.9 bugs that cropped up in the last day. I expect to have some time this or next week to dive into that.
- ryansnyder
- Back on Socorro through Tuesday, at which time I'll pick up Input 1.9 tickets, 10/12
- stephend
- As time permits, write Litmus tests for existing features, 10/12
- Continue verifying 1.9 bugs, 10/12
- Regression-test and file any bugs, 10/12
- michaelk
- Working on bug 600209, 10/12
- aakashd
- Start work on 3.0 PRD, 10/16
- Make sure chowse knows he'll need to devote some time to 3.0 work this quarter, 10/1
- Determine scalability of major release support, 10/16
- Talk to Wikimedia, 9/30
9-28-2010
What's been completed:
- fwenzel
- Crunched 1.8 bugs (with Ryan)
- tagged 1.8 for production
- waited in vain for the push to happen this morning
- davedash
- Nothing - AMO has been beating me like a red-headed step child
- ryansnyder
- Added product / version dropdowns per #590688
- hamilton
- Demo'd on LDA Topic Modeling per Platform & Type
- stephend
- Verified FIXED 1.8 bugs
- Filed a few bugs
- aakashd
- Worked on scheduling/resourcing Input 2.0 with morgamic
- Stephen Horlander will have the Idea Submission icons ready to go by the end of this week or early next week
- 3 Talked to chowse on availability on 2.0 features
What we aim to do and when do we expect to accomplish them:
- fwenzel
- not much "actual work" for the rest of the quarter: movers are coming, approx. a bazillion forms want filled out, and your guys' embassy wants to interview me...
- davedash
- Finish my AMO stuff early this week and crank on any bugs assigned to me., 9/20
- ryansnyder
- Picking up bugs for 2.0 release, 9/15
- stephend
- Keep trying to stay sane
- See above., 9/28
- aakashd
- Start work on 3.0 PRD, 10/16
- Make sure chowse knows he'll need to devote some time to 3.0 work this quarter, 10/1
- Determine scalability of major release support, 10/16
- Talk to Wikimedia, 9/30
1.8
9-21-2010
What's been completed:
- fwenzel
- Crunched 1.8 bugs (with Ryan)
- tagged 1.8 for production
- waited in vain for the push to happen this morning
- davedash
- Nothing - AMO has been beating me like a red-headed step child
- ryansnyder
- Added product / version dropdowns per #590688
- hamilton
- Demo'd on LDA Topic Modeling per Platform & Type
- stephend
- Verified FIXED 1.8 bugs
- Filed a few bugs
- aakashd
- Talked to Wikimedia Foundation. They want to learn about the design and implementation decisions made for user submission.
- Worked on defining roadmap into Q4 and filed bugs via Mr. Alexis's webform
What we aim to do and when do we expect to accomplish them:
- fwenzel
- not much "actual work" for the rest of the quarter: movers are coming, approx. a bazillion forms want filled out, and your guys' embassy wants to interview me...
- davedash
- Finish my AMO stuff early this week and crank on any bugs assigned to me., 9/20
- ryansnyder
- Picking up bugs for 2.0 release, 9/15
- stephend
- Keep trying to stay sane
- See above., 9/28
- aakashd
- Start on PRD for Input 3.0 designs and requirements, 10/8
- Push out blogpost for 1.8, 9/28
9-14-2010
What's been completed:
- fwenzel
- Fixed some P1 bugs (we're down to three!)
- Fixed product-details lib to make developers' lives easier
- PTO until Wednesday, will be back Thursday.
- davedash
- Worked on Admin site stuff
- AMO has me over capacity
- ryansnyder
- I've been hosting family, so I've accomplished a big fat nothing since 9/9
- Worked with Dave Dash yesterday to get my sandbox back up and running (thanks Dave)
- michaelk
- --
- hamilton
- Demo'd on LDA Topic Modeling per Platform & Type
- stephend
- Working my way through the resolved-fixed 1.8 bugs, now that we have
staging data, w00t w00t!
- aakashd
- Worked on Mobile Firefox Feedback Add-on
- Tested Mobile dashboard, filed a few bugs on ua'ing
What we aim to do next and when we expect to accomplish them:
- fwenzel
- There are a few P1s open. I'll try to assign them and fix some of them myself., 9/15
- davedash
- For this coming week, I'll look at the remaining 1.x bugs or dig into 2.x, 9/16+
- ryansnyder
- Currently working on #590688 in between meetings/work for Socorro week, 9/15
- michaelk
- --
- stephend
- Finish verifying all fixed 1.8 bugs I can, 9/16
- Do a round of serious testing and some more fuzzing, 9/16
- aakashd
- Figure out dev estimation on 2.0, 9/16
- Work on blog post for 1.8, 9/16
- Talk to mrz, 9/21
9-9-2010
- Fred
- Dave
- Ryan
- Mobile search came in
- Michael
- Hamilton
- Demo'd on LDA Topic Modeling per Platform & Type
- Stephen
- Filed/verified bugs
- Some data loss
- Aakash
- Was on vacation
What we aim to do next and when we expect to accomplish them:
- Frederic:
- Dave
- Ryan
- Hands tied with family and socorro, will take small bugs if available
- Michael
- Fix 1.8 bugs related to Sites, 9/16
- Hamilton
- Working on LDA Topic Modeling
- Stephen
- File/verify bugs
- Check it out with Android
- Aakash
- Work on blog post for 1.8, 9/16
- Figure out dev estimation on 2.0, 9/14
8-31-2010
What's been completed:
- Fred
- Working on Mobile Dashboard, will commit 8/31
- Dave
- Michael
- Getting fennec set up with sites
- Andres
- --
- Ryan
- Pushed last 1.7 bug, there was a regression
- Will try to pick up some 1.8
- Stephen
- Filed/verified bugs
- Aakash
- Setup 2.0 meeting
- Filed some bugs
- 3 Created 1.7 blog post
What we aim to do next and when we expect to accomplish them:
- Frederic:
- Complete UX overhaul of mobile dashboard, 9/6
- Ryan
- Fix assigned 1.8 bugs, 9/6
- Dave
- Michael
- Fix 1.8 bugs related to Sites, 9/6
- Andres
- --
- Stephen
- file/verify bugs (swamped with other projects)
- Aakash
- Talk to folks in platform meeting about Input, 8/31
- Hold the 2.0 planning meeting
- Help Stephen get set up on his mobile device, 8/31
1.7
8-26-2010
What's been completed:
- Fred
- 1.7 Bugs Fixed
- L10n notified
- Dave
- Themes up on Sites
- Michael
- Fixed Sites bugs for 1.7
- Andres
- --
- Ryan
- Fixed last bug, need a push
- Stephen
- Finishing up QA Completeness
- Aakash
- Done with 2.0 PRD (on the wiki)
- Created 1.8 wiki
What we aim to do next and when we expect to accomplish them:
- Frederic:
- Complete UX overhaul of mobile dashboard, 9/6
- Ryan
- Get bug pushed by Dave
- File all necessary bugs needed to complete 1.8 milestone, 8/27
- Dave
- Push Ryan's bug, enjoy the weekend
- Work on 1.8 bugs
- Michael
- Fix 1.7 bugs related to Sites, 8/24
- Andres
- --
- Stephen
- file/verify bugs
- Aakash
- Hold a planning meeting for 2.0
- on vacation (not available) from 9/1-9/5
- Work on communication effort to promote Input after 1.7, 8/31
- Create 1.7 release blogpost, 8/26
Additional Notes:
- We're going to be in Firefox Proper
- We're planning to be in Nightly Builds
8-24-2010
What's been completed:
- Fred
- Fixed remaining P1/P2 bugs
- Need follow-up with michaelk
- Dave
- Done with Themes UX Overhaul, need to have tests automated
- Andres
- --
- Ryan
- Fixed 1 of the bugs
- Stephen
- Verified some bugs and filed some more
- Aakash
- 3/4 done on 2.0 PRD
- Created 1.8 wiki
What we aim to do next and when we expect to accomplish them:
- Frederic:
- Finish P1/P2 bugs, 8/24
- Ryan
- Fix last bug and work with wenzel on committing process, 8/24
- Dave
- Themes UX Overhaul, 8/24
- Michael
- Fix 1.7 bugs related to Sites, 8/24
- Andres
- --
- Stephen
- file/verify bugs
- Aakash
- Finish Input 2.0 PRD, 8/24
- Talk to mrz about release time
- Update 1.8 wiki, 8/24
- Work on communication effort to promote Input after 1.7, 8/31
- Create 1.7 release blogpost, 8/26
8-19-2010
What's been completed:
- Fred
- Only 1 P1 bug left
- Assigned 2 bugs to Ryan
- Working on RTL support
- Dave
- Michael
- staging site now has sites dump coming in on a daily basis
- fixed P2 bugs for Sites
- Andres
- Ryan
- Been busy with Socorro, but will work on bugs today and tomorrow
- Stephen
- Verified some bugs and filed some more
- Has some sites questions that should be answered with chowse's
- Got another free load test report
- Aakash
- Finished 2.0 definition
What we aim to do next and when we expect to accomplish them:
- Frederic:
- Finish P1/P2 bugs, 8/23
- Contact l10n, 8/19
- Ryan
- Fix assigned bugs, 8/23
- Dave
- Themes UX Overhaul, 8/23
- Michael
- add (unit) tests for sites generation as soon as I find the time
- Fix 1.7 bugs related to Sites
- Andres
- --
- Stephen
- file/verify bugs
- Aakash
- Finish Input 2.0 definition, 8/24
- Work on communication effort to promote Input after 1.7, --
- Create 1.7 release blogpost, 8/24
8-17-2010
What's been completed:
- Fred
- Working on UX Overhaul
- fixed most P1 bugs
- won't be ready for tomorrow, but we'll need a few days
- Dave
- Brought up a half-done sites for the ux overhaul
- Michael
- made the changes to the sites process that were needed for Bugs 587616, 587588, 586915
- added an IT ticket (Bug 587942) to regularly run migrations for sites on stage
- Andres
- Ryan
- Sandbox is up and running
- WIll pick up bugs
- Stephen
- Verified some bugs
- Ran LoadImpact and Jmeter
- Got some 500 errors on staging
- Running 40 requests/sec and 300kb/sec with no issue
- Aakash
- Start communication effort for Input Dashboard
- Filed some bugs
What we aim to do next and when we expect to accomplish them:
- Frederic:
- UX overhaul
- Give heads up when pages are ready to be QA'd
- Ryan
- Work with Fred and fix assigned bugs
- Dave
- Themes UX Overhaul
- Michael
- - make sure the sites production db is migrated before 1.7 goes online (please notify me when code freezes)
- add (unit) tests for sites generation as soon as I find the time
- Fix 1.7 bugs related to Sites
- Andres
- --
- Stephen
- file/verify bugs
- try to look into happy/sad load testing
- Aakash
- Finish Input 2.0 definition, 8/24
- Work on communication effort to promote Input, --
- Create 1.7 release blogpost, 8/24
1.6.2
8-12-2010
What's been completed:
- Fred
- Working on UX Overhaul
- Dave
- Almost fully sandboxed
- Andres
- Stephen
- Verified some bugs
- Load testing as well
- Aakash
- Finished data flow, its on the wiki now
- Created 1.6.2 blogpost
What we aim to do next and when we expect to accomplish them:
- Frederic:
- Will release on branch by end of today
- Give an update on possibility of release on Wednesday, 8/16
- Ryan
- Take a look at bug queries, pick up a few bugs, 8/13
- Fix assigned 1.7 bugs, 8/16
- Dave
- Fix assigned 1.7 bugs, 8/16
- Andres
- Stephen
- vacation, vishal verifying bugs
- Aakash
- Input 2.0 definition
- Create 1.7 release blogpost
8-10-2010
What's been completed:
- Fred
- Dave
- Hudson is up, coverage is kinda crap - 67%
- Individual pieces of feedback linked
- Andres
- Michael
- Sites is up
- Stephen
- verify some bugs
- load testing as well
- Aakash
- finished data flow
- github commits are working
What we aim to do next and when we expect to accomplish them:
- Frederic:
- UX overhaul, 8/16
- Ryan
- UX Overhaul, 8/16
- Dave
- Take a look at 1.7 bugs, 8/12
- Andres
- Michael
- Maintain Sites, 8/12
- Stephen
- vacation, vishal verifying bugs
- Aakash
- Prepare 1.6.1 blogpost, 8/5
- input 2.0 definition
1.6.1
8-05-2010
What's been completed:
- Fred
- Held UX Overhaul meeting with chowse
- Atom Feeds
- Dave
- Worked on Hudson and removed smiley face from dashboard
- Andres
- introduced us to Hamilton
- Michael
- Don't have access to prod db, need help from IT
- need uptake with dmoore
- code is r+'d by fwenzel
- Stephen
- load-testing being worked on
- random numbers for search query terms brings down
- Aakash
- talked to Hamilton about things we're working on and our needs
- finished another rev of data flow chart
- sent out inquiries about 2.0 definition to triagers
What we aim to do next and when we expect to accomplish them:
- Frederic:
- Wait on chowse UX Overhaul, 8/10
- Dave
- Hudson for 1.7
- Andres
- continue with parsing through adjectives; modeling by topic
- Michael
- Sites, 8/4
- Stephen
- load testing, 8/4
- verify bugs
- Aakash
- work on data flow, 8/5
- work on Input 2.0 definition, 8/16
- Prepare 1.6.1 blogpost, 8/5
- figure out why my github commits to master are not working, 8/5
8-03-2010
What's been completed:
- Fred
- Took a look at the designs
- Dave
- Started on hudson, build is failing
- Andres
- parse through adjectives; modeling by topic
- Michael
- 1st review completed
- manual SQLs -> django to access db needs to be changed
- is thinking about pre-processing the data before Sites is
- Stephen
- verified some bugs
- Aakash
- Set up a meeting UX Overhaul
- Set up a meeting with Load Testing
- created the first draft of a data flow chart
- Sent out 1.6 blogpost
What we aim to do next and when we expect to accomplish them:
- Frederic:
- Have meeting with chowse about UX Overhaul
- Start on UX Overhaul
- Dave
- Fix Atom Feed, dashboard smiley face and hudson bugs, 8/4
- Andres
- Sites, 8/4
- Introduce Hamilton to the group
- continue with parsing through adjectives; modeling by topic
- Michael
- Sites, 8/4
- Stephen
- load testing ramp-up meeting, 8/4
- help out with UX Overhaul
- Aakash
- work on data flow, 8/5
- work on Input 2.0 definition, 8/16
- Push 1.6.1 release back (After word from mkurze), 8/3
- Prepare 1.6.1 blogpost
1.6
7-29-2010
What's been completed:
- Fred
- Finished all remaining (and found) P1/P2 bugs
- Dave
- Cluster
- Finished all remaining (and found) P1/P2 bugs
- Andres
- Sites prototyped on a local server
- Met with IT for Sites set up with metrics db cluster
- Michael
- Sites prototyped on a local server
- Met with IT for Sites set up with metrics db cluster
- Stephen
- Couldn't get a hold of oremj, will meet with him next week
- Aakash
- Worked on promoting out Input 1.6's and future releases
- Worked on new UX with chowse
What we aim to do next and when we expect to accomplish them:
- Frederic:
- UX Overhaul
- Dave
- 1.6.1 bugs
- Andres
- Sites, 8/3
- Michael
- Sites, 8/3
- Stephen
- load testing ramp-up, 8/2
- Aakash
- Set up a meeting UX Overhaul, 7/29
- Set up a meeting with Load Testing, 7/29
Additional Notes:
- Need time on working on better code
- Get hudson up
- Let's not fight fires
7-27-2010
What's been completed:
- Fred
- Finished Mobile
- URL submission on happy reports
- Dave
- Cluster
- Andres
- Sites prototyped on a local server
- Get PDF for Sites info over the past week
- Michael
- Sites prototyped on a local server
- Stephen
- Found Grinder, JMeter and ran them
- Need another sphinx node to run it against
- Aakash
- Get the new Cluster/Sites buttons
- Worked on new UX with chowse
What we aim to do next and when we expect to accomplish them:
- Frederic:
- Dave
- Andres
- Get PDF of Sites report, 7/29
- Michael
- Get term-matching onto trends box, 7/29
- Stephen
- Work on optimization of production sphinx node with oremj, 7/27
- QA 1.6 Changes
- Aakash
- Work on UX overhaul with chowse, 7/29
- File a bug on removing sites buttons, 7/27
Additional Notes:
- Are clusters and sites filtering by the product version? [aakash]
- There's no mixing, so we'll only get beta 2 information.
7-22-2010
What's been completed:
- Fred
- got the url (m.stage.input.mozilla.com) working
- submission pages are up, won't be completely done by 7/23
- Dave
- Finished RSS Feeds, working on Clusters
- Andres
- Finished algorithm, working on UI; targeting 7/26
- Got python on metrics db working
- Michael
- look up at Andres
- Stephen
- Jmeter is a bit complicated;
- Aakash
- Finished PRD 1.6 and re-uptake on Sites page
What we aim to do next and when we expect to accomplish them:
- Frederic:
- Finish Mobile, 7/27
- Dave
- Cluster, 7/26
- Andres
- Get prototype of Sites, 7/26
- Michael
- Get prototype of Sites, 7/26
- Stephen
- Investigate into load testing (talk to oremj), 7/27
- Figure out differences between staging and production for load testing
- Aakash
- UX Refresh with Chris Howse, 7/27
- Work with Lee Tom on new buttons, 7/27
1.5
7-20-2010
What's been completed:
- Fred
- On verbatim and have 7 locales already completed
- fixed all P1/P2 bugs that were blockers for 1.5
- Dave
- Almost done with RSS Feeds; Will go in a bit;
- Andres
- Working on "Sites";
- Q's: How do we analyze sites? Siphon the domains and then perform cluster analysis from there.
- Michael
- Last thursday/friday, worked on term-matching
- Setting up reporter project locally, will need Fred's help
- Q's: How do we write back into the tool? File an Input bug.
- Stephen
- Verified all bugs and filed some bugs.
- Aakash
- IT will help out in a big way
- PRD for 1.6 completed
What we aim to do next and when we expect to accomplish them:
- Frederic:
- Work on Mobile, 7/23
- Dave
- Cluster, 7/26
- Andres
- Finish up pseudo code of "sites", 78/
- Michael
- File Input Bug for data exchange workflow
- Get prototype of Sites, 7/26
- Stephen
- Investigate into load testing, 7/22
- Aakash
- Work through mock-ups and requirements with each feature, 7/26
- Figure out better triage techniques, 7/26
- UX Refresh with Chris Howse, 7/23
7-15-2010
What's been completed:
- Fred
- Completed Translate, l10n possible/not on verbatim
- Dave
- Changes haven't been made yet, got busy with AMO stuff
- Stephen
- Krupa is interested, but he'll be the only person needed for this release
- Aakash
- Talked to Chris Howse and he'll start on UX work next week with Input
- Worked with Metrics on Web Problems Page
What we aim to do next and when we expect to accomplish them:
- Frederic:
- Get on verbatim 7/19;
- Dave
- Complete RSS Feeds, 7/16
- Will try to get it in Clusters, 7/23
- Stephen
- Ready to QA and got updated on bug system
- Aakash
- communicate relative importance of Input to IT, 7/16
7-13-2010
Feeds:
- Django native cache; headers get picked up by Zeus and it doesn't hit the webhead.
L10n:
- Fred marked them as localizable and need to put them in verbatim. Will need strings separated for mobile pages.
Clusters:
- Aakash: Get a review from Chris Howse
- Warning Thing
- Doing a happy/sad report by version. It's a week's worth of data.
- Would rather prefer a week's worth of data because it's more useful and data won't get too large if we work on 3 week beta cycles.
Scheduling:
- 7/28: Searches with Feeds, L10n of Webpages, Translation Link and Clusters Beta
- String Freeze: 7/19
- Code Complete 7/21
- QA until 7/28
- Release 7/28
1.0
6-28-2010
Things we did well?
- Fred: requirements were very clear, mock-ups helped; execution was very much on-time;
- Aakash: pretty much what fred said; fred's coding was beast-like in its intensity; we got help from everyone we asked
Things we didn't do well?
- Fred: background changes a day before we launched; timeline was very short;
- Aakash: https stuff; blogposts were confusing since beta was not out yet to use the pages; VPN set-up 1 week after requested by fred
Things that are important to work on for next rev?
- get an idea about what marketing might want from Input early on
- When going live, Input needs an apache reload
Overall
- things were very good considering the timeline
6-22-2010
What's been completed:
- Frederic
- All remaining bugs fixed
- Aakash
- Tested Feedback Extension and identified nits to change
- Verified warning notification on submission pages
What we aim to do next and when we expect to accomplish them:
- Frederic:
- GO LIVE!
- Create blog post
- Aakash
- Create blog post/promotions as necessary and link Fred's stuff in it
6-21-2010
What's been completed:
- Frederic
- Pretty much all bugs fixed
- Filed bug 573468 to go live
- Aakash
- Done with Privacy Policy stuff
- verified fixes
What we aim to do next and when we expect to accomplish them:
- Frederic:
- fix remaining bugs
- Try out Lee Tom's next background image if he gets it in time
- Aakash
- Test out Jono's fix
- Verify warning notification on submission pages
6-20-2010
What's been completed:
- Frederic
- Fixed a bunch of bugs over the weekend
- Aakash
- talking to legal about implementation of privacy policy text on submission pages
- verified fixes
- promoted out input to a wider audience and got some testers (go kbrosnan!)
What we aim to do next and when we expect to accomplish them:
- Frederic:
- fix remaining P1-P3's
- file bug to go live Tuesday night PST
- Aakash
- hash out implementation with legal and give Fred a solution
- talk to Jono to comment out URL inclusion on extension side
6-16-2010
What's been completed:
- Frederic
- finished all P1/P2's except 1
- received horlander's icons
- Aakash
- finished 2nd set of mock-ups for mobile firefox
- verified p1 and p2 fixes
What we aim to do next and when we expect to accomplish them:
- Frederic:
- fix vendor directory issue for IT to get up on staging
- load testing
- fix remaining P1's and P3's
- Aakash
- test Input on staging
- promote out input to a wider audience (i.e. key stakeholders: qa, marketing, ux, fx-team)
6-15-2010
What's been completed:
- Frederic
- finished all P1's except 1
- replied to horlander
- Aakash
- followed-up with stephen horlander
- worked on implementation with mobile firefox
- filed a few more bugs
What we aim to do next and when we expect to accomplish them:
- Frederic:
- p2 bugs and remaining p1 bug
- Aakash
- test changes after p1 and p2 fixes are done
- look into load testing
6-14-2010
What's been completed:
- Frederic
- got hosed due to late issue with the weave team
- Aakash
- sent graphics via e-mail
- extension created by jono and we're testing that side
- all bugs triaged
What we aim to do next and when we expect to accomplish them:
- Frederic:
- p1 bugs
- reply back to horlander about smiley icon sizes on submission pages & sentiment box
- Aakash
- test changes after p1 fixes are done
- look into load testing
6-10-2010
What's been completed:
- Frederic
- completed beta page
- wrote unit tests
- did not file bug since app is changing quite a bit
- Aakash
- gave list of user agents
- got VPN access and tested/filed bugs
- created bugzilla component
- gave mock-up for download page
What we aim to do next and when we expect to accomplish them:
- Frederic
- fixing P1/P2's
- file a bug to staging when all P1/P2s are fixed
- Aakash
- follow up horlander
- lee tom for icons and graphics
- work on layout of search results
- file/triage bugs as needed
6-08-2010
What's been completed:
- Frederic:
- Search is working, pop-down for URLs, menu box options
- Aakash:
- Got Lee Tom to work on Dashboard and Thank You page graphics and Horlander to work on platform-specific icons
- Jono is going to incorporate button implementation with Feedback
- Metrics and TP will give info on riak implementation once its completed
What we aim to do next and when we expect to accomplish them:
- Frederic:
- create intermediary page to download beta (6/9)
- write unit test to make sure all cases are covered to send users to the download page
- file a bug on putting dashboard and submission pages to staging for input-stage.mozilla.com, input.stage.mozilla.com/happy input-stage.mozilla.com/sad (6/9)
- Aakash
- make a list of user agents 6/8
- get VPN access 6/8
- give text for download page 6/8
- get info on uservoice/survey api implementation with mktg on fx betas 6/10
6-01-2010
What's been completed:
- Fred:
- Working dashboard up (i.e. screenshot)
- swear word filter completed,
- Dashboard can be seen at http://fwenzel.khan.mozilla.org:8001/ (no search, urls are working, menuboxes for product/advanced options), admin panel (for deleting sentiment and hide terms)
- More screenshots: sad form, thank you page
What we aim to do next and when we expect to accomplish them:
- Fred (by Thursday 6/3):
- get search working
- pop-down for URLs when clicked ( go to page only when hyperlink clicked)
- implement in menu box options
- Aakash (by Thursday 6/3):
- get some designer love for happy/sad faces, dashboard header and follow-up buttons on thank you page
- start looking into client side
- getting info from metrics on implementation help for riak on rev 2
Additional Notes?
- Aakash: get set up with VPN for future demos
5-27-2010
Status Update:
- Fwenzel
- completed = forms (post positive and negative feedback), completed-ish user agent parser,
- questions = app that searches with riak?, interval on dashboard is? (1 day, 1 week, 1 month)
- aakashd
- getting info from metrics on implementation help for riak on rev 2
Next Steps:
- fwenzel = making django app/dashboard (late next week)