Mobile/Planning/2.0: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
Line 58: Line 58:
'''Top Goal''': RC “as close as possible to final release”  
'''Top Goal''': RC “as close as possible to final release”  


*'''Mar 8''': Code Freeze  
*'''Mar 9''': Code Freeze  
*'''Mar 10''': “go to build” RC1  
*'''Mar 14''': “go to build” RC1  
*'''Mar 15''': Launch, review RC user feedback
*'''Mar 18 or Mar 21''': Launch, review RC1 user feedback


Call RC1 “final”
Call RC1 “final”


*'''Mar 18''': Analyze RC feedback, make go/no-go decision
*'''Mar 21''': Analyze RC feedback, make go/no-go decision
*'''Mar 21''': Launch! Review user Feedback<br>
*'''Mar 29''': GA Launch (time frame depends on user feedback)<br>


== RC 2 (if required)  ==
== RC 2 (if required)  ==

Revision as of 18:53, 9 March 2011

Objectives

The main focus of Fennec 2.0 is on the platform side of things, focusing on Electrolysis and Layers and on Android integration. We'll continue to make front-end improvements that reflect a shift to more devices with broader capabilities.

Timeline

Important milestones (subject to change):

Alpha 1

  • Shipped on August 27, 2010

Beta 1

  • Shipped on October 7, 2010

Beta 2

  • Shipped on November 4th, 2010
  • Code freeze: Oct 19
  • Major Requirements:

Beta 3

  • Shipped on December 22, 2010
  • Code freeze: Nov 23
  • Major Requirements:

Beta 4

Top Goals: Performance, Stability, Compatibility, Usability

Beta 5

Top Goal: Launch Places changes- detailed schedule: http://bit.ly/ffG6iI

  • Feb 15 - Code Freeze
  • Feb 17 - Go to build
  • Feb 23 - Launch

RC 1

Top Goal: RC “as close as possible to final release”

  • Mar 9: Code Freeze
  • Mar 14: “go to build” RC1
  • Mar 18 or Mar 21: Launch, review RC1 user feedback

Call RC1 “final”

  • Mar 21: Analyze RC feedback, make go/no-go decision
  • Mar 29: GA Launch (time frame depends on user feedback)

RC 2 (if required)

Top Goal: RC “as close as possible to final release”

  • Mar 3: Code Freeze
  • Mar 17: Launch
  • Mar 21: Review user Feedback

Projects

List of projects for Fennec 2.0

Front-end:

Description Priority Status Details Strings Bugs
Multitouch P1 LANDED details yes
Virtual keyboard P1 INFLIGHT details no
Sync integration P1 LANDED details yes
Logging in to websites easier (need to be more specific) P3 RUNWAY
yes
Contacts integration P2 LANDED details no
Start page redesign




AwesomeScreen redesign P1 LANDED details yes
Find in page P3 LANDED details yes
Sharing P2 LANDED details yes
Platform integration (notification systems, back button, helper apps) P1 INFLIGHT details yes
Session Store & Undo Tab Close P4 LANDED details no
Feedback and Help P3 LANDED details yes
UI Transitions/animations (zooming, sliding panels, fade in/out, elastic edges) P3 RUNWAY
no
Page interactions (direct use and/or cursor mode) P1 INFLIGHT details no
Scroll indicators (content and chrome) P2 INFLIGHT details no
Consistent use of tap-and-hold




Better error pages P4 TAKEOFF details yes
Mobilize our messages/dialogs P4 TAKEOFF details yes
Form Assistant refresh P2 LANDED details no
RTL support P1 LANDED details no
Basic RSS support P3 INFLIGHT details yes
Basic webapp support P4 INFLIGHT details yes
Android chrome theme P1 LANDED details yes
Camera UI P3 INFLIGHT details yes
Reflow on zoom P3 RUNWAY details no
Remove TileManager from Frontend P1 LANDED details no
Master Password P4 INFLIGHT details yes
Updater P1 LANDED details yes


Platform:

Description Priority Status Details Strings Bugs
Electrolysis P1 INFLIGHT details notes no
Layers P1 INFLIGHT notes no
Power Management P1 RUNWAY
no
QT Widget
INFLIGHT


Plugins
RUNWAY

#630007
Video (and UI)




Camera (and UI)
INFLIGHT



Status Legend:

  • RUNWAY - Waiting for design or initial planning
  • TAKEOFF - Ready for work to begin
  • INFLIGHT - Work is in progress. Patches should be in bugs.
  • LANDED - Work has finished and is in the product.

See the projects page for the list of all potential projects.

Blockers

QA

2.0. Test Coverage Wiki