89
edits
Line 61: | Line 61: | ||
* QA sign-off: EOD Friday | * QA sign-off: EOD Friday | ||
* Push from stage to production will happen during the maintenance window on Mondays, 3-5pm Pacific time. (QA to be on hand for live spot checks to help verify the push was a success) | * Push from stage to production will happen during the maintenance window on Mondays, 3-5pm Pacific time. (QA to be on hand for live spot checks to help verify the push was a success) | ||
== Load Testing == | |||
* Working with ops team to improve grinder tests to better mimic real world conditions | |||
* Detailed testing strategies and processes can be found here: |
edits