Event - Firefox Live 2/meetings/2011-10-17: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 16: | Line 16: | ||
== Action Items == | == Action Items == | ||
* ckoehler will reach out to QA about owner, needs and timing | * ckoehler will reach out to QA about owner, needs and timing (done, {{bug|695227}} | ||
* ckoehler will reach out to SO with planned schedule | * ckoehler will reach out to SO with planned schedule (done, emailed Steven) | ||
* ckoehler will monitor {{bug|694666}} for getting the computers to the Zoo | * ckoehler will monitor {{bug|694666}} for getting the computers to the Zoo | ||
* williamr will reach out to L10n about needs and timing | * williamr will reach out to L10n about needs and timing | ||
* williamr will reach out to EC1 about design and content timing | * williamr will reach out to EC1 about design and content timing |
Revision as of 23:47, 17 October 2011
Attendees
Agenda
- Status of sending equipment to the Zoo bug 694666
- Engaging with Silver Orange
- Timeline for Design (EC1)
- Timeline for Implementation (SO)
- Outstanding items for Ooyala
- Locales targeting: en-US, ES, DE, FR (other locales can opt-in as well)
- Other?
Timeline: [1]
Notes
- Will start daily status meetings to check in on progress and issues
Action Items
- ckoehler will reach out to QA about owner, needs and timing (done, bug 695227
- ckoehler will reach out to SO with planned schedule (done, emailed Steven)
- ckoehler will monitor bug 694666 for getting the computers to the Zoo
- williamr will reach out to L10n about needs and timing
- williamr will reach out to EC1 about design and content timing