Support/Weekly Meetings/Notes 2012-03-12: Difference between revisions

Line 21: Line 21:


== UX ==
== UX ==
Progress report:
* Article category sort is done. [https://docs.google.com/spreadsheet/ccc?key=0AqTssbJSHVTndDNac0VkdHFOY1BwejN0Zk0zRXZDVUE#gid=0 View the result, and our rename recommendations].
* Sitemap test of our '''task-based''' workflow is done. [https://docs.google.com/spreadsheet/ccc?key=0AqTssbJSHVTndHoxQ2F2UGhCd0Rrby1VX0dyNDN4dlE View the result, and our comments].
* Sitemap test of our '''product-based''' workflow is done. [https://docs.google.com/spreadsheet/ccc?key=0AqTssbJSHVTndGF1aVZUMEt5N1VOR0s5QWJQdU5jUEE#gid=0 View the result, and our comments].
* Engaged Verdi on article renaming. See the link from the first item.
* Engaged Ibai and Matt_g on building [https://docs.google.com/spreadsheet/ccc?key=0AgscVQdNHuGudFpRY0lMMzFIT3RxbGZLUnFqbGdNa0E#gid=0 the search engine synonyms that we have started].
* I have assembled [https://docs.google.com/spreadsheet/ccc?key=0AqTssbJSHVTndG9vajdiMGwwTklSejhLMmtZSFhqTEE#gid=0 a To-do List document with action items for content strategy as well as Bugzilla items] to fill for the next few sprints.
What is due this week:
* One more sitemap test, which is a combination of the '''task-based''' and '''product-based''' workflows
* The new information architecture
* Phase 2 presentation (may be set next week)
What happens after this:
* Phase 3: I am going to be designing a lot of paper prototypes, putting the structure into design
* We will test it with users, face to face, and refine
* I also plan on '''revising SUMO’s front page with the new IA''' that Susan had developed, in preparation for the new design. Michelle is doing the same with the Mobile front page.


== Roundtable ==
== Roundtable ==
133

edits