Support/Weekly Meetings/Notes 2012-05-07: Difference between revisions
< Support | Weekly Meetings
Jump to navigation
Jump to search
(→UX) |
|||
Line 26: | Line 26: | ||
== UX == | == UX == | ||
* Thank you Verdi, Michelle and the content team for migrating the new IA over to the SUMO production site! | |||
* I had worked on the mobile site UX for a while (it started shortly after the desktop version), [http://people.mozilla.com/~bpitoyo/sumo/sumo-wireframes-mobile.pdf but the wireframes can now be seen]. It will be revised before testing. | |||
=== Paper Prototyping Planning === | |||
* [https://docs.google.com/document/d/17ddnoayx_WhS5eDAMBth8tzDSKtnbmABqRgCqmcuHg0/edit The research plan] has: | |||
** A detailed to-do list of what Susan, Crystal and Bram will need to do before testing | |||
* [https://docs.google.com/document/d/1vy4rVckvXnyrg3w8_HRwM2XDSfLMTA-ammTVLuqY-yo/edit The planning discussion] has: | |||
** The things that we need to test (labeled “NTK” for “Need To Know”) | |||
** The scenario required to test the things we need to know | |||
* [https://docs.google.com/document/d/1tSkrkkMy1wMW90u_uXIxWalEREOUpZWOl2AGkk3Akig/edit The recruitment plan] has: | |||
** The screening questionnaire that Susan will give to the recruiter to recruit test participants | |||
=== Paper Prototyping Timeline === | |||
* Location: [http://collectiveagency.co/ Collective Agency], Portland | |||
* Dates and times: | |||
** Wednesday, May 23 | |||
** Friday, May 25 | |||
** Tuesday, May 29 | |||
** 90 minutes per appointment | |||
** 3 appointments a day: 11 am, 2:30 pm and 5/5:30 pm | |||
** 8 total participants on the above three dates | |||
** '''Why the gap?''' We need a minimum of day-long break inbetween, so we can tweak and refine the design after each session | |||
* The visual designer will be needed after the testing day: very late May to early June | |||
== Roundtable == | == Roundtable == |
Revision as of 15:47, 7 May 2012
Meeting Details
Mondays (meeting duration approx. 30 minutes) at:
- 9:00 AM PST
- 12:00 Noon EST
- 16:00 UTC during summer
- 18:00 CET
- 11:00 CST
Phone call details:
- California: 1-650-903-0800, x92 then 9309 then #,
- Toll-free: +1 800 707 2533, pin 369 - then 9309 then #
- Skype (free): +1 800 707 2533, pin 369 - then 9309 then #
Participate in the video:
- Video link (You'll have to download and install the Vidyo Desktop client)
irc.mozilla.org: #sumo <== Click the link to use web-based chat
Sumo Development Update
- 2012.8 ends tomorrow. It was a short one, since last week was the webdev work week. Focus was:
- Search unification of KB and forums posts, first phase.
- Indicator for forum contributors about their impact on the forum
- 2012.9 starts tomorrow. Focus will be:
- Search unification, second phase
- Back end changes to support the new iA
UX
- Thank you Verdi, Michelle and the content team for migrating the new IA over to the SUMO production site!
- I had worked on the mobile site UX for a while (it started shortly after the desktop version), but the wireframes can now be seen. It will be revised before testing.
Paper Prototyping Planning
- The research plan has:
- A detailed to-do list of what Susan, Crystal and Bram will need to do before testing
- The planning discussion has:
- The things that we need to test (labeled “NTK” for “Need To Know”)
- The scenario required to test the things we need to know
- The recruitment plan has:
- The screening questionnaire that Susan will give to the recruiter to recruit test participants
Paper Prototyping Timeline
- Location: Collective Agency, Portland
- Dates and times:
- Wednesday, May 23
- Friday, May 25
- Tuesday, May 29
- 90 minutes per appointment
- 3 appointments a day: 11 am, 2:30 pm and 5/5:30 pm
- 8 total participants on the above three dates
- Why the gap? We need a minimum of day-long break inbetween, so we can tweak and refine the design after each session
- The visual designer will be needed after the testing day: very late May to early June
Roundtable
- Please add your comments, questions and updates here.
- Presentation about Kilimanjaro and what does it mean for SUMO
- Can i ask what you thing about the following page https://www.facebook.com/mozillasupport - williamr is behind this and verdi has admin (Verdi - I've never seen that page) - satdav
- Can us contributors get a email list for sumo as the thunderbird guys has one i know topal used to have one but was not advertised a lot - satdav
- IRC meeting this thursday in #sumomeet - 6PM UK time - satdav
- SUMO thread Analysis and request for Feedback -Tyler
Firefox Status Update
Metrics
Community
Knowledge Base
- The new task-based pages are live on the desktop start page.
- There are lots of updates for Firefox 13 to do this week along with lots of previously updated articles that can probably be marked as ready for L10n.
- Next KB meeting is Thursday at 9am PDT.
Mobile
Services
- Apps Marketplace Alpha Launch on track for this Tuesday. Mozillians to be invited to use it with Nightly.
Support Forum
Thunderbird
- An Introduction to Thunderbird Support and to Roland Tanglao
- last week spoke with Kadir about TB KB integration requirements and Michael Verdi about Firefox Clinic and KB; this week hope to speak with Matthew G about metrics and Madalina and Rosana about Community Management (and to all other SUMO team members for about 20 minutes over the next few weeks)