Firefox3/StatusMeetings/2007-02-14: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
m (→‎Firefox 3: mm grammar)
Line 28: Line 28:
* PRD Status
* PRD Status
** This was largely covered in yesterday's [[Firefox3/StatusMeetings/2007-02-13|Firefox 3 Meeting]], but to summarize:
** This was largely covered in yesterday's [[Firefox3/StatusMeetings/2007-02-13|Firefox 3 Meeting]], but to summarize:
*** Initial round of PRD discussions have been completed
*** Initial round of PRD discussions has been completed
*** [http://spreadsheets.google.com/pub?key=p4kVYBRbEKKgFPCn5XmfrXw&gid=0 Spreadsheet has been updated] with the outcome of those meetings
*** [http://spreadsheets.google.com/pub?key=p4kVYBRbEKKgFPCn5XmfrXw&gid=0 Spreadsheet has been updated] with the outcome of those meetings
*** Next steps: 1) Figuring out how to track requirements on a regular basis (Basil, Deb); 2) Mconnor, Schrep, Basil and others drafting a schedule of milestone target dates.
*** Next steps: 1) Figuring out how to track requirements on a regular basis (Basil, Deb); 2) Mconnor, Schrep, Basil and others drafting a schedule of milestone target dates.

Revision as of 14:02, 14 February 2007

« previous week | index | next week »

Meeting Details

  • 11:00am PST (19:00 UTC)
  • Mozilla HQ, 1st floor conference table
  • 650-215-1282 x91 Conf# 217 (US/INTL)
  • 1-800-707-2533 (pin 369) Conf# 217 (US)
  • join irc.mozilla.org #granparadiso for backchannel

Agenda

  • Action items
  • Gecko 1.9 Roundtable
  • Firefox 3
  • Any other business

Gecko 1.9 Alpha 2 Status

Gecko 1.9 Roundtable

  • Triage report
  • XHR

Testing

Firefox 3

  • PRD Status
    • This was largely covered in yesterday's Firefox 3 Meeting, but to summarize:
      • Initial round of PRD discussions has been completed
      • Spreadsheet has been updated with the outcome of those meetings
      • Next steps: 1) Figuring out how to track requirements on a regular basis (Basil, Deb); 2) Mconnor, Schrep, Basil and others drafting a schedule of milestone target dates.
      • The list of outstanding actions that came out of the PRD review sessions (primarily related to fleshing out or clarifying sections) has been collated and largely assigned.

Any other business