'''Performance Management Tools Kanban'''
{{ForceRefreshButton}}
{{ForceRefreshButton}}


===Kanban PM Work Stack===  
'''Performance Management Tools Stack'''
 
==="To be Scrubbed" Stack===  
The PM work stack contains all the user stories that need to be scrubbed and prioritized by PM and engineering. In terms of Bugzilla, it means status = "NEW" and the PM-Scrub flag has been set to ?.
The PM work stack contains all the user stories that need to be scrubbed and prioritized by PM and engineering. In terms of Bugzilla, it means status = "NEW" and the PM-Scrub flag has been set to ?.
<bugzilla>
<bugzilla>
Line 17: Line 18:
</bugzilla>
</bugzilla>


===Kanban "Ready to Work" Stack===  
==="Ready to implement" Stack===  
The ready to work stack contains all the user stories that are supposed to be ready to be worked on. In terms of Bugzilla, it means status = "NEW" and the PM-Scrubb has been set to +.
The ready to work stack contains all the user stories ready to be implemented. That means the stories have been flushed out, cleaned up and prioritized. In terms of Bugzilla, it means status = "NEW" and the PM-Scrubb has been set to +.
<bugzilla>
<bugzilla>
{
{
Line 32: Line 33:
</bugzilla>
</bugzilla>


===Kanban "In Progress" Stack===  
==="In Progress" Stack===  
User stories currently being worked on by an engineer. Bugzilla: status=ASSIGNED.  
User stories currently being implemented. Bugzilla: status=ASSIGNED.  


<bugzilla>
<bugzilla>
Line 44: Line 45:
</bugzilla>
</bugzilla>


===Kanban "Landed" Stack===  
==="Landed" Stack===  
User stories that have landed.
User stories that have landed.
<bugzilla>
<bugzilla>

Revision as of 22:25, 23 October 2013

Performance Management Tools Stack

"To be Scrubbed" Stack

The PM work stack contains all the user stories that need to be scrubbed and prioritized by PM and engineering. In terms of Bugzilla, it means status = "NEW" and the PM-Scrub flag has been set to ?.

No results.

0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);


"Ready to implement" Stack

The ready to work stack contains all the user stories ready to be implemented. That means the stories have been flushed out, cleaned up and prioritized. In terms of Bugzilla, it means status = "NEW" and the PM-Scrubb has been set to +.

No results.

0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);


"In Progress" Stack

User stories currently being implemented. Bugzilla: status=ASSIGNED.

No results.

0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);


"Landed" Stack

User stories that have landed.

Full Query
ID Priority Summary Status Assigned to
625846 -- Add Heap Snapshot and Analysis tools RESOLVED
879008 P2 New UI for the sampling Profiler RESOLVED Victor Porof [:vporof][:vp]
929114 -- Live Frame Rate Visualization RESOLVED
931898 -- Recorded Frame rate visualization RESOLVED
1011224 -- Performance tools are available in WebIDE RESOLVED

5 Total; 0 Open (0%); 5 Resolved (100%); 0 Verified (0%);