CloudServices/Meetings/2010-05-18: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
mNo edit summary
 
(12 intermediate revisions by 5 users not shown)
Line 22: Line 22:
** QA
** QA
*** Client
*** Client
**** [https://bugzilla.mozilla.org/buglist.cgi?classification=Client%20Software&chfieldto=Now&chfield=%5bBug%20creation%5d&query_format=advanced&chfieldfrom=2010-05-07&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&component=Fennec%20UI&component=Firefox%20UI&component=General&component=Needs%20Triage&component=Sync&product=Weave Unfixed bugs] filed since b5 release. None appear to be stop ship bugs.
**** [https://bugzilla.mozilla.org/buglist.cgi?resolution=FIXED&classification=Client%20Software&chfieldto=Now&chfield=resolution&query_format=advanced&chfieldfrom=2010-05-07&bug_status=RESOLVED&bug_status=VERIFIED&component=Fennec%20UI&component=Firefox%20UI&component=General&component=Needs%20Triage&component=Sync&product=Weave Bugs fixed] since b5 release. They will need verification in b6.
**** ddahl created [http://jetpackgallery.mozillalabs.com/jetpacks/296 JetCrawl], which builds bookmarks and history off of topsites.  Works with older jetpack sdks.  ''Update:'' filed {{bug|566707}} to track changes.
*** Load
*** Load
**** utest test completed 1st baseline measurements. Waiting for green light to repeat tests under load.
*** Automation
*** Automation
**** Dynamic account creation is working fine using staging server
**** Need about 10 more days to finish with client, then will work on results reporting to MySQL db
**** Will work on docs this week, so that when ashah starts writing tests next week he'll have some info to start with
** Metrics
** Metrics
** Marketing
** Marketing

Latest revision as of 20:06, 19 November 2013

Agenda:

  • Release schedule (need to revise)
    • Code freeze (for blockers): Apr 30 (Delayed, new date: May 4)
    • Registration server code complete: Apr 30 (Done)
    • String Freeze: Apr 30 (Delayed, new date: May 4)
    • H/W set up complete and configured: May 5
    • Load testing done : May 13 (Delayed, new date: May 14)
    • l10n complete: May 11
    • Security reviews done: May 10
    • RC release date: May 12
    • QA release sign off: May 13
    • Unit tests for Primary done: May 10
    • Web content finalized and staged: May 13
    • PR/Announcement complete and finalized: May 13
    • GA date: May 17, 2010
  • 1.3 release status update
    • Production environment
    • Load tests
    • Client
    • QA
      • Client
        • Unfixed bugs filed since b5 release. None appear to be stop ship bugs.
        • Bugs fixed since b5 release. They will need verification in b6.
        • ddahl created JetCrawl, which builds bookmarks and history off of topsites. Works with older jetpack sdks. Update: filed bug 566707 to track changes.
      • Load
        • utest test completed 1st baseline measurements. Waiting for green light to repeat tests under load.
      • Automation
        • Dynamic account creation is working fine using staging server
        • Need about 10 more days to finish with client, then will work on results reporting to MySQL db
        • Will work on docs this week, so that when ashah starts writing tests next week he'll have some info to start with
    • Metrics
    • Marketing
    • Support
    • iPhone client
  • Discussion Items
    • Load test...
    • utest status?
    • We need to test migration ?
    • Large profiles - tchung will look into alternatives.
    • Metrics is going to write a collector script and will switch over when we go live.
    • AI: MConnor and I will talk about what else needs to be localized.
    • AI: Need a blog post draft by the end of this week.
    • Ops Runbook needs to be done.
    • AI: Logging needs to be set up in production for security.
    • SLA: onsite backup every 2 days, offsite backup every week.
    • AI: Ragavan will talk Mayumi/WebDev about changing/localizing the updated page.