(→Marco) |
(→Marco) |
||
Line 37: | Line 37: | ||
** The remaining point capacity, up to the minimum value of the velocity range, is used for new work on the priority list. | ** The remaining point capacity, up to the minimum value of the velocity range, is used for new work on the priority list. | ||
* Aim to achieve the following performance gains based on the above mentioned process changes at the conclusion of Iteration 35.2 on September 29: | * Aim to achieve the following performance gains based on the above mentioned process changes at the conclusion of Iteration 35.2 on September 29: | ||
** Improve the average percentage of | ** Improve the average percentage of verified work from Iterations 34.2 - 35.2 to 75%. | ||
** Reduce the average percentage of carry over work from Iterations 34.2 - 35.2 | ** Reduce the average percentage of carry over work from Iterations 34.2 - 35.2 to 25%. | ||
*** The breakdown for the 25% reduction in carry over work aims to be 5% for resolved work awaiting verification and 20% for incomplete Engineering/Design work. | *** The breakdown for the 25% reduction in carry over work aims to be 5% for resolved work awaiting verification and 20% for incomplete Engineering/Design work. | ||