B2G/QA/Automation/UI/Scrum: Difference between revisions
< B2G | QA | Automation | UI
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(56 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
== | == [[/Sprint 17|Sprint 17 2015-05-18 -> 2015-05-29]] == | ||
{{:B2G/QA/Automation/UI/Scrum/Sprint 17}} | |||
== Backlog == | == Backlog == | ||
== | === Tasks === | ||
==== Bugzilla ==== | |||
* [https://bugzilla.mozilla.org/buglist.cgi?j_top=OR&j9=OR&list_id=11496396&o1=substring&v1=fxosqa-auto-backlog%2B&f1=cf_qa_whiteboard&f9=OP&query_format=advanced&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED Bugzilla Query (QA Whiteboard contains fxosqa-auto-backlog+ and bug is open)] | |||
<bugzilla>{ | |||
"f1": "cf_qa_whiteboard", | |||
"o1": "substring", | |||
"v1": "fxosqa-auto-backlog+", | |||
"status":["NEW","REOPENED","UNCONFIRMED","ASSIGNED"], | |||
"include_fields": "id, assigned_to, summary, resolution, priority, cf_qa_whiteboard" | |||
}</bugzilla> | |||
==== Other ==== | |||
* TBD | |||
=== Nominations === | |||
==== Bugzilla ==== | |||
* [https://bugzilla.mozilla.org/buglist.cgi?j_top=OR&f1=cf_qa_whiteboard&j9=OR&list_id=11496301&o1=substring&o2=equals&f9=OP&query_format=advanced&f2=flagtypes.name&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&v1=fxosqa-auto-backlog%3F&v2=in-qa-testsuite%3F&product=Firefox%20OS Bugzilla: QA Whiteboard contains fxosqa-auto-backlog? OR flags contain in-qa-testsuite?, but not fxosqa-auto-backlog-] | |||
* [https://bugzilla.mozilla.org/buglist.cgi?f1=cf_qa_whiteboard&list_id=11622624&o1=notsubstring&query_format=advanced&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&v1=fxosqa-auto&component=Gaia%3A%3AUI%20Tests&product=Firefox%20OS Bugzilla: All untriaged and open Gaia UI Test bugs] | |||
==== Other ==== | |||
* TBD | |||
== Previous Sprints == | |||
* [[/Sprint 17|Sprint 15 2015-05-18 -> 2015-05-29]] | |||
* [[/Sprint 16|Sprint 15 2015-05-04 -> 2015-05-15]] | |||
* [[/Sprint 15|Sprint 15 2015-04-20 -> 2015-05-01]] | |||
* [[/Sprint 14|Sprint 14 2015-04-06 -> 2015-04-17]] | |||
* [[/Sprint 13|Sprint 13 2015-03-23 -> 2015-04-03]] | |||
* [[/Sprint 12|Sprint 12 2015-03-09 -> 2015-03-20]] | |||
* [[/Sprint 11|Sprint 11 2015-02-23 -> 2015-03-06]] | |||
* [[/Sprint 10|Sprint 10 2015-02-09 -> 2015-02-20]] | |||
* [[/Sprint 9|Sprint 9 2015-01-26 -> 2015-02-06]] | |||
* [[/Sprint 8|Sprint 8 2015-01-12 -> 2015-01-23]] | |||
* [[/Sprint 7|Sprint 7 2014-12-22 -> 2015-01-09]] | |||
* [[/Sprint 6|Sprint 6 2014-12-08 -> 2014-12-19]] | |||
* [[/Sprint 5|Sprint 5 2014-11-24 -> 2014-12-05]] | |||
* [[/Sprint 4|Sprint 4 2014-11-11 -> 2014-11-21]] | |||
* [[/Sprint 3|Sprint 3 2014-11-03 -> 2014-11-07]] | |||
* [[/Sprint 2|Sprint 2 2014-10-20 -> 2014-10-31]] | |||
* [[/Sprint 1|Sprint 1 2014-10-06 -> 2014-10-17]] | |||
== How to Flag and Tag == | |||
=== Nominations === | |||
;fxosqa-auto-backlog? (qa whiteboard): Nominate for addition to backlog (preferred method) | |||
OR | |||
;in-qa-testsuite? (flag): | ;in-qa-testsuite? (flag): Alternative to above for backwards compatibility with old process. This should be switched to a whiteboard tag as above, when found, as in-qa-testsuite+ really means the test is implemented, not just planned. We do not consistently use this field, and use RESOLVED/FIXED instead. | ||
=== Backlog === | === Backlog === | ||
;fxosqa-auto-backlog+ (qa wb): | ;fxosqa-auto-backlog+ (qa wb): Approved for backlog | ||
;fxosqa-auto-backlog- (qa wb): Declined for backlog (excludes from future queries) | ;fxosqa-auto-backlog- (qa wb): Declined for backlog (excludes from future queries) | ||
=== Sprint === | === Sprint (Replaces Backlog Tag) === | ||
;fxosqa-auto-s# (qa wb): Added to sprint #. | ;fxosqa-auto-s#[, s#...] (qa wb): Planned as part of sprint #. If carrying over, add extra sprints on end. If not resolving and not carrying over, this should be replaced with a dropped tag, per below. | ||
;fxosqa-auto-points=# (qa wb): | ;fxosqa-auto-s#+[, s#...] (qa wb): Added to sprint # as an unplanned task. If carrying over, mark as above. | ||
;fxosqa-auto-points=# (qa wb): Optional points estimate | |||
=== Sprint | === Removing from Sprint (Replaces Sprint Tag) === | ||
;fxosqa-auto-dropped-s# (qa wb): Dropped from sprint, multiple if necessary | ;fxosqa-auto-dropped-s#[, s#...] (qa wb): Dropped from sprint, multiple if necessary. In-progress sprint tag should be removed when dropped. | ||
Latest revision as of 15:53, 18 May 2015
Sprint 17 2015-05-18 -> 2015-05-29
Focuses
- Q2 tasks
- Clean up the runs with xfail/disable
- Fix broken tests
Tasks
Bugzilla
ID | Assigned to | Summary | Resolution | Priority | Qa whiteboard |
---|---|---|---|---|---|
1145657 | John Dorlus [:Silne30] | Create View Pattern for use in Gaia Acceptance | WONTFIX | -- | [fxosqa-auto-s12+,s13,s14,s15,s16,s17] |
1156332 | Implement Brick Test in JavaScript | WONTFIX | -- | [fxosqa-auto-s14+,s15,s16,s17] | |
1156753 | Johan Lorenzo [:jlorenzo] - On PTO - Back on July 28th | Migrate test_sms_to_dialer.py to Gij | FIXED | -- | [fxosqa-auto-s15,s16,s17] |
1168118 | Johan Lorenzo [:jlorenzo] - On PTO - Back on July 28th | Migrate test_sms_contact_input_validation.py to Gij | FIXED | -- | [fxosqa-auto-s17+,s18] |
4 Total; 4 Open (100%); 0 Resolved (0%); 0 Verified (0%);
Other
Backlog
Tasks
Bugzilla
No results.
0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);
Other
- TBD
Nominations
Bugzilla
- Bugzilla: QA Whiteboard contains fxosqa-auto-backlog? OR flags contain in-qa-testsuite?, but not fxosqa-auto-backlog-
- Bugzilla: All untriaged and open Gaia UI Test bugs
Other
- TBD
Previous Sprints
- Sprint 15 2015-05-18 -> 2015-05-29
- Sprint 15 2015-05-04 -> 2015-05-15
- Sprint 15 2015-04-20 -> 2015-05-01
- Sprint 14 2015-04-06 -> 2015-04-17
- Sprint 13 2015-03-23 -> 2015-04-03
- Sprint 12 2015-03-09 -> 2015-03-20
- Sprint 11 2015-02-23 -> 2015-03-06
- Sprint 10 2015-02-09 -> 2015-02-20
- Sprint 9 2015-01-26 -> 2015-02-06
- Sprint 8 2015-01-12 -> 2015-01-23
- Sprint 7 2014-12-22 -> 2015-01-09
- Sprint 6 2014-12-08 -> 2014-12-19
- Sprint 5 2014-11-24 -> 2014-12-05
- Sprint 4 2014-11-11 -> 2014-11-21
- Sprint 3 2014-11-03 -> 2014-11-07
- Sprint 2 2014-10-20 -> 2014-10-31
- Sprint 1 2014-10-06 -> 2014-10-17
How to Flag and Tag
Nominations
- fxosqa-auto-backlog? (qa whiteboard)
- Nominate for addition to backlog (preferred method)
OR
- in-qa-testsuite? (flag)
- Alternative to above for backwards compatibility with old process. This should be switched to a whiteboard tag as above, when found, as in-qa-testsuite+ really means the test is implemented, not just planned. We do not consistently use this field, and use RESOLVED/FIXED instead.
Backlog
- fxosqa-auto-backlog+ (qa wb)
- Approved for backlog
- fxosqa-auto-backlog- (qa wb)
- Declined for backlog (excludes from future queries)
Sprint (Replaces Backlog Tag)
- fxosqa-auto-s#[, s#...] (qa wb)
- Planned as part of sprint #. If carrying over, add extra sprints on end. If not resolving and not carrying over, this should be replaced with a dropped tag, per below.
- fxosqa-auto-s#+[, s#...] (qa wb)
- Added to sprint # as an unplanned task. If carrying over, mark as above.
- fxosqa-auto-points=# (qa wb)
- Optional points estimate
Removing from Sprint (Replaces Sprint Tag)
- fxosqa-auto-dropped-s#[, s#...] (qa wb)
- Dropped from sprint, multiple if necessary. In-progress sprint tag should be removed when dropped.