FirefoxOS/DeviceQA/2015-09-28WeeklyReport: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
No edit summary
(update weekly report)
 
(11 intermediate revisions by 10 users not shown)
Line 10: Line 10:
||
||
* Week W39 (09/21~09/25)
* Week W39 (09/21~09/25)
 
** [v2.5 Pin the Web] Update test plan and test cases based on the latast UX spec
** [v2.5 Pin the Web] Exploratory test
** Bugs work from QAnalyst/Marigold
||
||
* Week W40 (09/28~10/05)
* Week W40 (09/28~10/02)
 
** [v2.5 Tracking Protection] Confirm 2.5 scope
** [v2.5 Tracking Protection] Study feature and write test plan
** [v2.5 Tracking Protection] Create test cases
** Bugs work from QAnalyst/Marigold
|-
|-
|Askeing
|Askeing
||
||
* Week W39 (09/21~09/25)
* Week W39 (09/21~09/25)
 
** Prepare Slides of Academy Program
** Investigate the biwet issue
** Develop the prototype of TC DL
||
||
* Week W40 (09/28~10/05)
* Week W40 (09/28~10/02)
 
** Academy program preparation
** Investigate the biwet issue
|-
|-
| Cynthia
| Cynthia
||
||
* Week W39 (09/21~09/25)
* Week W39 (09/21~09/25)
 
** [v2.5 TV - TV Deck] Design test cases and execute the testing
** [v2.5 TV - EPG] Design test cases and execute the testing
** [v2.5 TV] Bugs work
||
||
* Week W40 (09/28~10/05)
* Week W40 (09/28~10/02)
 
** [v2.5 TV - Pocket Integration] Study feature and create test cases
** [v2.5 TV - Bookmark Sync] Study feature in desktop for preparing the test account
** [v2.5 TV] Bugs work
|-
|-
|Gerry
|Gerry
Line 36: Line 48:


||
||
* Week W40 (09/28~10/05)
* Week W40 (09/28~10/02)


|-
|-
Line 42: Line 54:
||
||
* Week W39 (09/21~09/25)
* Week W39 (09/21~09/25)
 
** Set up testing environment on Desktop
** Practice automation testing b2g
** Study ftu-ping, app usage testing
||
||
* Week W40 (09/28~10/05)
* Week W40 (09/28~10/02)
 
** Set up Telemetry server/device/environment
** Study Telemetry testing
|-
|-
| Kinder
| Kinder
||
||
* Week W39 (09/21~09/25)
* Week W39 (09/21~09/25)
** [New Tool Development]
*** Prepare Puppet Scripts demo


||
||
* Week W40 (09/28~10/05)
* Week W40 (09/28~10/02)
** [New Tool Development]
*** Survey Docker


|-
|-
Line 65: Line 84:
*** Study New Security Model
*** Study New Security Model
||
||
* Week W40 (09/28~10/05)
* Week W40 (09/28~10/02)
** NSec WW
** NSec WW
|-
|-
Line 71: Line 90:
||
||
* Week W39 (09/21~09/25)
* Week W39 (09/21~09/25)
 
** integrating crash-bug-report system
||
||
* Week W40 (09/28~10/05)
* Week W40 (09/28~10/02)
 
** support replaceable homescreen
|-
|-
| Shako Ho
| Shako Ho
||
||
* Week W39 (09/21~09/25)
* Week W39 (09/21~09/25)
** MTBF
*** integrate the raptor Minion with boss framework [in progress]
*** Fix MTBF test cases on aries [done]


||
||
* Week W40 (09/28~10/05)
* Week W40 (09/28~10/02)
** MTBF
*** integrate the raptor Minion with boss framework [in progress]
*** Fix MTBF test cases on aries [done]


|-
|-
Line 87: Line 112:
||
||
* Week W39 (09/21~09/25)
* Week W39 (09/21~09/25)
 
** RedSquare workshop at Mountain View
||
||
* Week W40 (09/28~10/05)
* Week W40 (09/28~10/02)
 
** (PTO for 2 days)
** RedSuqare QA SOW
** QA Test addons
** Academy program preparation
|-
|-
| Teri
| Teri
||
||
* Week W39 (09/21~09/25)
* Week W39 (09/21~09/25)
 
** [V2.5] Replaceable Homescreen
*** New home screen
**** Additional memory tests as suggested by Dev feeback
**** Provided test results and analysis to Dev for comment and review
**** Positive feedback from Dev about test results - no regression
*** Replaceable homescreen
**** Sent out test cases and test plan for review
** [V2.5 PTS]
*** Review Marigold PTS test result
*** Resolved task cluster specific build reference issue
*** Resolved PTS 6.2.1 profile inconsistency problem
*** Confirm test case details with MariGold
*** 2 blocked bugs: 1208310, 1208337
||
||
* Week W40 (09/28~10/05)
* Week W40 (09/28~10/02)
** [V2.5] Replaceable Homescreen
*** Part 2 replaceable homescreen code landed
*** Start testing
** [V2.5 PTS]
*** Follow up blocked bugs
*** Resolved workspace profile inconsistency issue


|-
|-
Line 107: Line 153:
** Planning for better ways of MCTS Cert reference generation
** Planning for better ways of MCTS Cert reference generation
||
||
* Week W40 (09/28~10/05)
* Week W40 (09/28~10/02)
** holidays on 9/28 & 9/29
** holidays on 9/28 & 9/29
** matching issues in bugzilla, scrumdesk, github, and google doc
** PR reviews
** PR reviews
** Better ways of MCTS Cert reference generation
** Better ways of MCTS Cert reference generation
Line 134: Line 181:
*** Follow up fullrun-2 progress and triage fullrun bugs
*** Follow up fullrun-2 progress and triage fullrun bugs
||
||
* Week W40 (09/28~10/05)
* Week W40 (09/28~10/02)
** Follow v2.5 user story  
** Follow v2.5 user story  
*** L10n test case creation and review, and knowledge sharing
*** L10n test case creation and review, and knowledge sharing

Latest revision as of 06:55, 5 October 2015

Last week | Next week

Name Done Plan
Alison
  • Week W39 (09/21~09/25)
    • [v2.5 Pin the Web] Update test plan and test cases based on the latast UX spec
    • [v2.5 Pin the Web] Exploratory test
    • Bugs work from QAnalyst/Marigold
  • Week W40 (09/28~10/02)
    • [v2.5 Tracking Protection] Confirm 2.5 scope
    • [v2.5 Tracking Protection] Study feature and write test plan
    • [v2.5 Tracking Protection] Create test cases
    • Bugs work from QAnalyst/Marigold
Askeing
  • Week W39 (09/21~09/25)
    • Prepare Slides of Academy Program
    • Investigate the biwet issue
    • Develop the prototype of TC DL
  • Week W40 (09/28~10/02)
    • Academy program preparation
    • Investigate the biwet issue
Cynthia
  • Week W39 (09/21~09/25)
    • [v2.5 TV - TV Deck] Design test cases and execute the testing
    • [v2.5 TV - EPG] Design test cases and execute the testing
    • [v2.5 TV] Bugs work
  • Week W40 (09/28~10/02)
    • [v2.5 TV - Pocket Integration] Study feature and create test cases
    • [v2.5 TV - Bookmark Sync] Study feature in desktop for preparing the test account
    • [v2.5 TV] Bugs work
Gerry
  • Week W39 (09/21~09/25)
  • Week W40 (09/28~10/02)
Iris
  • Week W39 (09/21~09/25)
    • Set up testing environment on Desktop
    • Practice automation testing b2g
    • Study ftu-ping, app usage testing
  • Week W40 (09/28~10/02)
    • Set up Telemetry server/device/environment
    • Study Telemetry testing
Kinder
  • Week W39 (09/21~09/25)
    • [New Tool Development]
      • Prepare Puppet Scripts demo
  • Week W40 (09/28~10/02)
    • [New Tool Development]
      • Survey Docker
Mike
  • Week W39 (09/21~09/25)
    • [Open Mobile]
      • P1 issues verification
    • [v2.5]
      • Monitor performance regression
      • Add more add-ons test cases
      • Study New Security Model
  • Week W40 (09/28~10/02)
    • NSec WW
Paul
  • Week W39 (09/21~09/25)
    • integrating crash-bug-report system
  • Week W40 (09/28~10/02)
    • support replaceable homescreen
Shako Ho
  • Week W39 (09/21~09/25)
    • MTBF
      • integrate the raptor Minion with boss framework [in progress]
      • Fix MTBF test cases on aries [done]
  • Week W40 (09/28~10/02)
    • MTBF
      • integrate the raptor Minion with boss framework [in progress]
      • Fix MTBF test cases on aries [done]
Shing
  • Week W39 (09/21~09/25)
    • RedSquare workshop at Mountain View
  • Week W40 (09/28~10/02)
    • (PTO for 2 days)
    • RedSuqare QA SOW
    • QA Test addons
    • Academy program preparation
Teri
  • Week W39 (09/21~09/25)
    • [V2.5] Replaceable Homescreen
      • New home screen
        • Additional memory tests as suggested by Dev feeback
        • Provided test results and analysis to Dev for comment and review
        • Positive feedback from Dev about test results - no regression
      • Replaceable homescreen
        • Sent out test cases and test plan for review
    • [V2.5 PTS]
      • Review Marigold PTS test result
      • Resolved task cluster specific build reference issue
      • Resolved PTS 6.2.1 profile inconsistency problem
      • Confirm test case details with MariGold
      • 2 blocked bugs: 1208310, 1208337
  • Week W40 (09/28~10/02)
    • [V2.5] Replaceable Homescreen
      • Part 2 replaceable homescreen code landed
      • Start testing
    • [V2.5 PTS]
      • Follow up blocked bugs
      • Resolved workspace profile inconsistency issue
Walter
  • Week W39 (09/21~09/25)
    • PR reviews
    • MCTS Cert-WebAPI fixes
    • Planning for better ways of MCTS Cert reference generation
  • Week W40 (09/28~10/02)
    • holidays on 9/28 & 9/29
    • matching issues in bugzilla, scrumdesk, github, and google doc
    • PR reviews
    • Better ways of MCTS Cert reference generation
    • Checking for MCTS results again since all suites are fixed
William Hsu