Build:TeamRadar: Difference between revisions
Jump to navigation
Jump to search
Warning: This RelEng page is obsolete! This practice is not maintained anymore
No edit summary |
No edit summary |
||
(13 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{Obsolete RelEng Page|This practice is not maintained anymore}} | |||
= Build Team Task Radar = | = Build Team Task Radar = | ||
For the last few months, we've been tracking all of our various projects, ToDo items and bugs as actual bugs in bugzilla. If you want to see the same list we see, [https://bugzilla.mozilla.org/buglist.cgi?cmdtype=runnamed&namedcmd=assigned-to-build-people click here]. | |||
Our workload falls into 4 categories: | |||
* p1: emergency task; take priority over everything else | |||
* p2: scheduled task; being actively worked on. Hope to have completed within 2 weeks. | |||
* p3: triaged, but not scheduled task. No work being done on this. | |||
* --: not yet triaged. No work being done on this. | |||
If you see something that needs fixing, and its not already filed as a bug, please do file a bug (product=mozilla.org; component=build). We triage through the bugs, and this allows us to schedule/loadbalance/prioritize as needed. Feel free to contact us on email (build at mozilla dot org) or IRC (irc.mozilla.org #build) if you have any questions. | |||
= 2008 = | |||
* [[https://intranet.mozilla.org/Build:2008Q1Goals 2008 Q1 Goals]] | |||
= 2007 = | |||
* [[https://intranet.mozilla.org/Build:Q4Goals 2007 Q4 Goals]] | |||
* [[https://intranet.mozilla.org/Build:Q3Goals 2007 Q3 Goals]] | |||
= 2006 = | = 2006 = | ||
* [[Build::TeamRadar::2006q3|Third Quarter (Long Range)]] | |||
* [[Build::TeamRadar::200608|August]] | |||
* [[Build::TeamRadar::200607|July]] | |||
* [[Build::TeamRadar::200606|June]] | * [[Build::TeamRadar::200606|June]] |
Latest revision as of 23:02, 9 February 2011
Build Team Task Radar
For the last few months, we've been tracking all of our various projects, ToDo items and bugs as actual bugs in bugzilla. If you want to see the same list we see, click here.
Our workload falls into 4 categories:
- p1: emergency task; take priority over everything else
- p2: scheduled task; being actively worked on. Hope to have completed within 2 weeks.
- p3: triaged, but not scheduled task. No work being done on this.
- --: not yet triaged. No work being done on this.
If you see something that needs fixing, and its not already filed as a bug, please do file a bug (product=mozilla.org; component=build). We triage through the bugs, and this allows us to schedule/loadbalance/prioritize as needed. Feel free to contact us on email (build at mozilla dot org) or IRC (irc.mozilla.org #build) if you have any questions.