QA/Fennec/Waverley/2011-03-08: Difference between revisions

From MozillaWiki
< QA‎ | Fennec‎ | Waverley
Jump to navigation Jump to search
 
(4 intermediate revisions by 3 users not shown)
Line 20: Line 20:
<i> (eg. Status, top issues) </i>
<i> (eg. Status, top issues) </i>
* Mozilla (test lead)
* Mozilla (test lead)
** On order, HTC Desire, Nexus S, Optimus 1.  Tracking number will be sent to Ady once that is in progress
** [https://wiki.mozilla.org/QA/Fennec/Milestones/2.0/ReleaseTest/RC1 RC Release Test Wiki] is available with assignments
* Waverley (Ioana, Andreea, Anna, Nicolae)
* Waverley (Ioana, Andreea, Anna, Nicolae)
** Weekly Status:
** Weekly Status:
Line 26: Line 28:
*** run performance tests against daily builds with the add-on (result are on server) and against all [https://spreadsheets.google.com/ccc?hl=ro&hl=ro&key=tSYUhuuHfysysUGpFIx1VlQ&authkey=CIj7v7oN#gid=0 previous RC]
*** run performance tests against daily builds with the add-on (result are on server) and against all [https://spreadsheets.google.com/ccc?hl=ro&hl=ro&key=tSYUhuuHfysysUGpFIx1VlQ&authkey=CIj7v7oN#gid=0 previous RC]
*** as at the test day was propose to write Tc for [https://bugzilla.mozilla.org/buglist.cgi?query_format=advanced&field0-0-0=flagtypes.name&type0-0-0=equals&value0-0-0=in-litmus%3F&resolution=FIXED&product=Fennec&known_name=in-litmus%3F  in-litmus flagged bugs]  we added [https://spreadsheets.google.com/ccc?key=0AgbEknPON8vbdFNhVE1FLS1aNXpSZ3MtbUljSUp1ckE&authkey=CNXehc0N&hl=ro#gid=0 some TC]
*** as at the test day was propose to write Tc for [https://bugzilla.mozilla.org/buglist.cgi?query_format=advanced&field0-0-0=flagtypes.name&type0-0-0=equals&value0-0-0=in-litmus%3F&resolution=FIXED&product=Fennec&known_name=in-litmus%3F  in-litmus flagged bugs]  we added [https://spreadsheets.google.com/ccc?key=0AgbEknPON8vbdFNhVE1FLS1aNXpSZ3MtbUljSUp1ckE&authkey=CNXehc0N&hl=ro#gid=0 some TC]
** Questions:
*** Is there a way to see which patches are added in a brand new build?


== Round Table ==  
== Round Table ==  
Line 33: Line 33:


* Vlad: PTO request between 14th and 18th of March
* Vlad: PTO request between 14th and 18th of March
* Andrei: PTO request between 25th April and 8th May


== Take Aways ==
== Take Aways ==
<i> (eg. Action items) </i>
<i> (eg. Action items) </i>

Latest revision as of 16:08, 8 March 2011

Meeting Notes for 2011-03-08

Welcome

(eg. headcount, updates with staffing, vacation/away time)

Firefox Updates

(eg. Status, top issues)

Fennec Updates

(eg. Status, top issues)

  • Mozilla (test lead)
    • On order, HTC Desire, Nexus S, Optimus 1. Tracking number will be sent to Ady once that is in progress
    • RC Release Test Wiki is available with assignments
  • Waverley (Ioana, Andreea, Anna, Nicolae)
    • Weekly Status:

Round Table

(eg. Other items to discuss)

  • Vlad: PTO request between 14th and 18th of March
  • Andrei: PTO request between 25th April and 8th May

Take Aways

(eg. Action items)