L10n:Planning/2012-03-05: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
(Created page with "{{SUBPAGENAME}} {{SUBPAGENAME}} __NOTOC__ ==Meeting Details== * Time and location: Monday, 8 AM PST, conf bridge 2...")
 
 
(8 intermediate revisions by 5 users not shown)
Line 23: Line 23:
* Attendees:
* Attendees:
* ''Put your talking points here.''
* ''Put your talking points here.''
* Contract with Dwayne
* [https://l10n.etherpad.mozilla.org/goals-2012q2 goals]
* l20n with b2g/jetpack. see also the [https://wiki.mozilla.org/L20n/Features feature list]


==Action Items==
==Action Items==
Line 49: Line 52:
=== gandalf ===
=== gandalf ===
'''goal for this week''':
'''goal for this week''':
Update the python parser to work with [[L20n/Features|new features]]


planned for this week:
planned for this week:
*
* Work on [[L20n/Features|new features]] with Pike and Stas
* Update the grammar and python parser to work with the new features
 
done last week:
done last week:
*
* finalize the list of [[L20n/Features|new features for L20n]]
* update pyast to support tree dumping
* initialize work on the toolchain for l20n
* work with fantasai on LOL syntax improvements
 
=== Jeff ===
=== Jeff ===
'''goal for this week''':
'''goal for this week''':


planned for this week:
planned for this week:
*
* Blog post on fixing small L10n bugs ([https://l10n.etherpad.mozilla.org/socialmedia see l10n blog post schedule]).
* Draft intermediate Narro tutorial.
* Make edits to process documentation on wikimo.
* Finish tools vision testing analysis.
* Q2 goals
 
done last week:
done last week:
*
* Finished translator recruiting for MozCamp LATAM.
* Began intermediate and advanced Narro tutorials.
* Prepared presentation for next week's career fair.
* Spent most of last week sick with flu.
 
=== Matjaž ===
=== Matjaž ===
'''goal for this week''':
'''goal for this week''':
Line 70: Line 90:
=== Milos ===
=== Milos ===
'''goal for this week''':
'''goal for this week''':
Get progress in LSV updating
Educate Ibrahima(ff) on HG


planned for this week:
planned for this week:
*
* LSV updating
* Affiliates new process implementation
* Flicks update and reaching-out
* Blogging
* Old-beta style locales: figure out trending since Firefox 4
 
done last week:
done last week:
*
* Productization
* Firefox Flicks Release(yay!)
* Affiliates l10n process rewrite
 
Status on beta:
* Acholi: San James is not responding in bugs, but deferring to Dwayne
* Burmese: no response since landing
* Ligurian looks good for de-beta, Axel to double-check and review sign-off
* Fulah: Had problems finding a right time to catch up with Ibrahima
* Wolof: No response
 
=== Pascal ===
=== Pascal ===
'''goal for this week''':
'''goal for this week''':


planned for this week:
planned for this week:
*
* Prepare the excel file for EUBallot with the translated strings
done last week:
done last week:
* put  a beta download link on all /new pages with an existing beta promotion string (convinced engagement to reuse a string and activate the link for all locales instead of translating a new one for 4 locales only). Fixed about 20 pages to still look good after that visual change.
* gave instructions for SVN to Arash our Persian localizer (I was committing for him until he got his account created)
* Launched translation of a new snippet to promote Firefox Flicks on about:home
* Created ESR pages for German
* Coded a live view of snippets.lang so as that marketing can easily check locales done and copy/paste them http://l10n.mozilla-community.org/~pascalc/langchecker/?action=translate
* Worked with Alexis from the python services team to help me setup bedrock locally (he even patched bedrock to fix the install steps which lacked documentation)
* Kept working on Beta pages, 47 locales done
*
*
=== Pike ===
=== Pike ===
'''goal for this week''':
planned for this week:
planned for this week:
*
* mercurial 2.1 support for the dashboard
* help elmo ship
* prepare for merge day
done last week:
done last week:
*
* loads of reviews following up to outreach
* investigated outdated ldap accounts. Too many
 
=== stas ===
=== stas ===
'''goal for this week''':
'''goal for this week''':

Latest revision as of 16:18, 5 March 2012


Meeting Details

  • Time and location: Monday, 8 AM PST, conf bridge 206
  • irc.mozilla.org #l10n-drivers for back-channel

« previous meetingindexnext week » create?

Previous Action Items

carry-overs


Meeting Notes

  • Notetaker:
  • Attendees:
  • Put your talking points here.
  • Contract with Dwayne
  • goals
  • l20n with b2g/jetpack. see also the feature list

Action Items

carry-overs


Roundtable

arky

goal for this week:

planned for this week:

done last week:

chofmann

goal for this week:

planned for this week:

done last week:

gandalf

goal for this week:

Update the python parser to work with new features

planned for this week:

  • Work on new features with Pike and Stas
  • Update the grammar and python parser to work with the new features

done last week:

  • finalize the list of new features for L20n
  • update pyast to support tree dumping
  • initialize work on the toolchain for l20n
  • work with fantasai on LOL syntax improvements

Jeff

goal for this week:

planned for this week:

  • Blog post on fixing small L10n bugs (see l10n blog post schedule).
  • Draft intermediate Narro tutorial.
  • Make edits to process documentation on wikimo.
  • Finish tools vision testing analysis.
  • Q2 goals

done last week:

  • Finished translator recruiting for MozCamp LATAM.
  • Began intermediate and advanced Narro tutorials.
  • Prepared presentation for next week's career fair.
  • Spent most of last week sick with flu.

Matjaž

goal for this week:

planned for this week:

done last week:

Milos

goal for this week: Get progress in LSV updating Educate Ibrahima(ff) on HG

planned for this week:

  • LSV updating
  • Affiliates new process implementation
  • Flicks update and reaching-out
  • Blogging
  • Old-beta style locales: figure out trending since Firefox 4

done last week:

  • Productization
  • Firefox Flicks Release(yay!)
  • Affiliates l10n process rewrite

Status on beta:

  • Acholi: San James is not responding in bugs, but deferring to Dwayne
  • Burmese: no response since landing
  • Ligurian looks good for de-beta, Axel to double-check and review sign-off
  • Fulah: Had problems finding a right time to catch up with Ibrahima
  • Wolof: No response

Pascal

goal for this week:

planned for this week:

  • Prepare the excel file for EUBallot with the translated strings

done last week:

  • put a beta download link on all /new pages with an existing beta promotion string (convinced engagement to reuse a string and activate the link for all locales instead of translating a new one for 4 locales only). Fixed about 20 pages to still look good after that visual change.
  • gave instructions for SVN to Arash our Persian localizer (I was committing for him until he got his account created)
  • Launched translation of a new snippet to promote Firefox Flicks on about:home
  • Created ESR pages for German
  • Coded a live view of snippets.lang so as that marketing can easily check locales done and copy/paste them http://l10n.mozilla-community.org/~pascalc/langchecker/?action=translate
  • Worked with Alexis from the python services team to help me setup bedrock locally (he even patched bedrock to fix the install steps which lacked documentation)
  • Kept working on Beta pages, 47 locales done

Pike

planned for this week:

  • mercurial 2.1 support for the dashboard
  • help elmo ship
  • prepare for merge day

done last week:

  • loads of reviews following up to outreach
  • investigated outdated ldap accounts. Too many

stas

goal for this week:

planned for this week:

done last week: