Program Management/Firefox/2014-Q3-Goals: Difference between revisions

m
Line 37: Line 37:
** Additional work will be included in the iteration once all committed work selected in the planning meeting is at least at the review stage.
** Additional work will be included in the iteration once all committed work selected in the planning meeting is at least at the review stage.
* Aim to achieve the following performance gains based on the above mentioned process changes at the conclusion of Iteration 35.2 on September 29:
* Aim to achieve the following performance gains based on the above mentioned process changes at the conclusion of Iteration 35.2 on September 29:
** Improve the average percentage of verified work by Iteration 35.2 to 75%.
** Improve the average percentage of verified work to 75%.
** Reduce the average percentage of carry over work by Iteration 35.2 to 25%.
** Reduce the average percentage of carry over work to 25%.
*** The breakdown for the 25% reduction in carry over work aims to be 5% for resolved work awaiting verification and 20% for incomplete Engineering/Design work.
*** The breakdown for the 25% reduction in carry over work aims to be 5% for resolved work awaiting verification and 20% for incomplete Engineering/Design work.