** Additional work will be included in the iteration once all committed work selected in the planning meeting is at least at the review stage. | ** Additional work will be included in the iteration once all committed work selected in the planning meeting is at least at the review stage. | ||
* Aim to achieve the following performance gains based on the above mentioned process changes at the conclusion of Iteration 35.2 on September 29: | * Aim to achieve the following performance gains based on the above mentioned process changes at the conclusion of Iteration 35.2 on September 29: | ||
** Improve the average percentage of verified work | ** Improve the average percentage of verified work to 75%. | ||
** Reduce the average percentage of carry over work | ** Reduce the average percentage of carry over work to 25%. | ||
*** The breakdown for the 25% reduction in carry over work aims to be 5% for resolved work awaiting verification and 20% for incomplete Engineering/Design work. | *** The breakdown for the 25% reduction in carry over work aims to be 5% for resolved work awaiting verification and 20% for incomplete Engineering/Design work. | ||