* Tiling on Desktop - Removed in April. Currently not deemed as required for APZ and scrolling performance, so the priority dropped. | * Tiling on Desktop - Removed in April. Currently not deemed as required for APZ and scrolling performance, so the priority dropped. | ||
------ Items above done before or during Q2 ------ | ------ Items above done before or during Q2 ------ | ||
* APZ Fennec parity (added in June) - enable in 43, but do a double nightly, ride 44 train | * APZ Fennec parity (added in June) - enable in 43, but do a double nightly, ride 44 train | ||
* Desktop Scrolling Performance (postponed from Q2 in May) | * Desktop Scrolling Performance (postponed from Q2 in May) | ||
Line 216: | Line 215: | ||
* Expose the graphics card details | * Expose the graphics card details | ||
------ Items above planned to be done before or during Q3 ------ | ------ Items above planned to be done before or during Q3 ------ | ||
* APZ - | * APZ on Desktop - enabled in 42, do multiple nightlies only, ride 44 or 45 train, but only under E10S | ||
* WebGL2 on par (target 46; goal added in June) | * WebGL2 on par (target 46; goal added in June) | ||
* WebGL Mobile Performance | * WebGL Mobile Performance | ||
* WebGL Performance Parity on Desktop | * WebGL Performance Parity on Desktop - investigation stage | ||
------ Items above planned to be done before or during Q4 ------ | ------ Items above planned to be done before or during Q4 ------ | ||
| style="vertical-align:top;" | | | style="vertical-align:top;" | | ||
Line 244: | Line 241: | ||
* WebGL Mobile Performance | * WebGL Mobile Performance | ||
* WebGL Performance Parity on Desktop | * WebGL Performance Parity on Desktop | ||
* APZ - "fake scroll" - removed - priority lowered | |||
* APZ - OOP iframe support - removed - priority lowered | |||
* Zooming-in Improvements - removed - the ask is not there anymore | |||
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ | ------ Items above planned to be done before or during Gecko 45 (End 2015) ------ | ||
|} | |} |
Revision as of 17:47, 23 October 2015
![]() |
Firefox Platform 2015 Roadmap | |
Owner: Martin Best | Updated: 2015-10-23 | |
This roadmap outlines the current direction for Firefox Platform development through 2015. The following document is subject to change at anytime. It is also not a commitment to ship a features but rather an intent to implement and land them on by default in the nightly version of Firefox unless otherwise stated. |
Related Links:
Teams
Definition of Done: All listed features are present in our nightly version of Firefox. The features must then go through the standard quality assurance process before appearing in a release channel.
Accessibility
Current Plans | Previous Plans |
---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------
------ Items above planned to be done before or during Q4 ------
|
[everything below not finalized]
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
DOM
Current Plans | Previous Plans |
---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------
------ Items above planned to be done before or during Q4 ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
e10s
Current Plans | Previous Plans |
---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------
------ Items above planned to be done before or during Q4 ------ |
------ Items above planned to be done before or during Q1 ------ ------ Items above planned to be done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------
------ Items above planned to be done before or during Q4 ------ |
Graphics
Current Plans | Previous Plans |
---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------
------ Items above planned to be done before or during Q4 ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
JavaScript
Current Plans | Previous Plans |
---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------ ------ Items above planned to be done before or during Q3 ------ ------ Items above planned to be done before or during Q4 ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
Layout
Current Plans | Previous Plans |
---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------ ------ Items above planned to be done before or during Q4 ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------
------ Items above planned to be done before end 2015 but may get reprioritized ------ |
Media
Current Plans | Previous Plans |
---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------
------ Items above planned to be done before or during Q4 ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
Mobile Platform
Current Plans | Previous Plans |
---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------ ------ Items above planned to be done before or during Q4 ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
Networking
Current Plans | Previous Plans |
---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------
------ Items above planned to be done before or during Q4 ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
PKI
Current Plans | Previous Plans |
---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------
------ Items above planned to be done before or during Q4 ------
|
|
Sandboxing
Current Plans | Previous Plans |
---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------ ------ Items above planned to be done before or during Q4 ------
|
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
Security
Current Plans | Previous Plans |
---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------
------ Items above planned to be done before or during Q4 ------ |
------ Items above were done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
WebRTC / WebAudio
(All these features/fixes below are landing in Nightly during these quarters)
Current Plans | Previous Plans |
---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------
------ Items above planned to be done before or during Q4 ------
|
------ Items were done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
Web Compatibility
Current Plans | Previous Plans |
---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------ ------ Items above planned to be done before or during Q3 ------ ------ Items above planned to be done before or during Q4 ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
Initiatives
- 60fps
- Focused on producing a smooth, jank free experiences. 60fps goal is dependant on media type.
- BarrierSmash
- Ensure that accessibility features are working throughout our products.
- Candle
- Program targeted at reducing energy usage.
- CrashKill
- Improve the overall stability of Gecko and the project that rely on it.
- CritSmash
- Fix known critical security bugs.
- Electrolysis
- This is focused on providing multi-process browser (aka e10s).
- Offline
- Offline Support
- Presto
- Program targeted at improving overall load times and performance. This is resurrecting an older program that was discontinued.
- MemShrink
- Reduce memory usage (all products)
- Web Compatibility
- Improve the overall web compatibility of Gecko.
- Webify
- Reduce the webs dependence on plugins. This includes several content targeted initiatives such as the games program (Unity), Shumway (Flash), MSE/EME, WebRTC (Google Talk, Facebook Video)
- Games Program