Connected Devices/Projects/Project Link: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
(verb tense correction)
(→‎Project Overview: updated verb tenses)
Line 24: Line 24:


== Project Overview ==
== Project Overview ==
Project Link (formerly Foxlink) is a short-term experiment to build software building blocks that can interact with various "things". Most code is done in [https://www.rust-lang.org/ Rust].
Project Link (formerly Foxlink) was a short-term experiment to build software building blocks that can interact with various "things". Most code was done in [https://www.rust-lang.org/ Rust].


We are using the "Design Thinking" innovation approach by IDEO, where the philosophy of Product Innovation is at the center of technology (feasibility), person (desirability) & business (viability).  
We used the "Design Thinking" innovation approach by IDEO, where the philosophy of Product Innovation is at the center of technology (feasibility), person (desirability) & business (viability).


== Validation Stage ==
== Validation Stage ==

Revision as of 16:27, 16 August 2016

After the successful completion of a Project Link prototype and further study by team members, the team closed Project Link and pivoted to a project called Cue, that is focused on making the lives of busy families easier by using voice and a smart screen to manage reminders, lists, and schedule coordination. Please visit the Project Cue wiki for information about the learning taken from Project Link that has resulted in the studies and experiments being conducted for Project Cue.

If interested in learning more about what Project Link was and what experiments were conducted, please read further.

Project Link had a goal of being your own, personal user agent for the smart home, creating a web of things that is completely yours. Instead of entrusting your data to a third party, a goal of the Link agent was to understand your preferences for how you wanted to interact with the world of devices in your home, and to automate your connected world for you. All of this still was to be done conveniently and securely, but completely under your control.

Project Overview

Project Link (formerly Foxlink) was a short-term experiment to build software building blocks that can interact with various "things". Most code was done in Rust.

We used the "Design Thinking" innovation approach by IDEO, where the philosophy of Product Innovation is at the center of technology (feasibility), person (desirability) & business (viability).

Validation Stage

In the Validation stage, the Link team has been conducting investigations and studies to answer the questions:

  • Does it fit the Mozilla mission?
  • Is there a problem worth solving?
  • What is the MVP?
  • Is it something customers want?
  • Can it be solved?

Early in the Validation stage, the team experimented with consumer smart devices available today, as described in Phase 1 in the Archive section below, and developed a prototype that enabled device discovery, rule configuration for how the devices should automatically interact, and the push of notifications to the user.

The next steps....coming to this wiki soon

  • Note: A description of the activities in which the team is currently engaged is coming soon.

Team Participants

  • Aleh Zasypkin
  • Andrew Osmond
  • Christiane Ruetten
  • Dave Hylands
  • David Rajchenbach-Teller
  • Fabrice Desré
  • Fernando Jiménez Moreno
  • Francisco Jordano
  • Guillaume Marty
  • Hema Koka
  • Johan Lorenzo
  • Julie McCracken
  • Julien Wajsberg
  • No-Jun Park
  • Preeti Sanketh
  • Sam Giles

Development

Proposals

Technical documentation

Presentations

Following are presentations made during the 2016/03 workweek.

Repositories

All code is open source and hosted on https://github.com/fxbox. Please file bugs on Github issues for these repositories.

Complex and/or breaking changes are discussed as Requests For Comments.

Participation

Project Link is at a very early stage and we are still figuring out many thing, including how to best accept contributions. But don't let this deter you!

The core of Project Link is developed in Rust. The front-end is developed in HTML5/JS using REST/WebSocket.

Help Wanted

We maintain lists of issues for which we are looking for help.

We also maintain a full, unclassified, list of ongoing issues. If you wish to help, don't hesitate to look at them, but they may not be as easy or as detailed:

And all our source code may be found on GitHub repositories.

Getting In Touch

Please subscribe to our mailing-list.

We've established Project Link on Discourse

Otherwise, the best way to get in touch with us is to come and chat through irc. We can be found on channel #foxlink of irc.mozilla.org.

If you wish to file a bug, please visit our GitHub repositories and file an issue.

We also discuss our design decisions, improvements or radical new directions as Requests For Comments. Feel free to take a look and to participate.

IRC

You can find us on irc.mozilla.org, channel #foxlink.

Team Meetings

We are using some agile practices:

  • "Stand-up" meetings happen on etherpad and on IRC every weekday between 5pm and 5:15pm UTC.
  • Weekly meetings happen in Vidyo and on etherpad every monday between 5pm and 6pm UTC.

QA

Project Link Test Plan
Project Link Test Cases
Integration Test Environment Design Document

ARCHIVE

Phase 1

As the first step, we worked toward delivering a prototype that allows a user to -

  1. Setup "Link"
  2. Have their devices that use Z-wave/WiFi protocols be discovered by Link
  3. Interact & control their devices whether they are home or remote via a web-app.
  4. Configure rules around how these devices should automatically interact with each other for specific scenarios
  5. Receive notifications

Devices Supported in Phase 1

Device Standard
D-Link Pan & Tilt Wi-Fi Camera DCS-5020L WiFi
Fibaro Motion Sensor Z-Wave
Philips Hue Lights Zigbee (via Phillips Hue Bridge)
Kwikset Door Lock SmartCode 910 Z-Wave
Schlage Door Lock BE469NXCAM619 Z-Wave

For more details, see Pilot Scenes

Phase 1 Status - Completed

Milestone Date Status
Gate 0 approval 2016.1.11 Done
Project kickoff 2016.2.1 Done
Integration Meetup 2016.3.21 Done
Pilot Scene 1 End to End Integration 2016.4.15 Done
Pilot Scene 2 End to End Integration 2016.4.15 Done