QA/Fennec/Waverley/2011-03-08: Difference between revisions
Jump to navigation
Jump to search
Line 31: | Line 31: | ||
* Vlad: PTO request between 14th and 18th of March | * Vlad: PTO request between 14th and 18th of March | ||
* Andrei: PTO request between 25th April and 5th May | |||
== Take Aways == | == Take Aways == | ||
<i> (eg. Action items) </i> | <i> (eg. Action items) </i> |
Revision as of 15:44, 8 March 2011
Meeting Notes for 2011-03-08
Welcome
(eg. headcount, updates with staffing, vacation/away time)
Firefox Updates
(eg. Status, top issues)
- Mozilla (juanb)
- Fx4rc: Sign-off tomorrow end of day.
- Plugins matrix: lots of issues found, a few not reproducible.
- Focus areas based on fixes.
- Fx4rc: Sign-off tomorrow end of day.
- Waverley (Desktop Firefox team)
Fennec Updates
(eg. Status, top issues)
- Mozilla (test lead)
- Waverley (Ioana, Andreea, Anna, Nicolae)
- Weekly Status:
- run BFTs, OS integration tests and daily smoke tests on all available devices (Samsung Galaxy S Captivated, HTC Desire, Motorola Droid 2) daily results
- bug validation daily results and from the test day link
- run performance tests against daily builds with the add-on (result are on server) and against all previous RC
- as at the test day was propose to write Tc for in-litmus flagged bugs we added some TC
- Weekly Status:
Round Table
(eg. Other items to discuss)
- Vlad: PTO request between 14th and 18th of March
- Andrei: PTO request between 25th April and 5th May
Take Aways
(eg. Action items)