QA/Fennec/Waverley/2011-03-08: Difference between revisions

From MozillaWiki
< QA‎ | Fennec‎ | Waverley
Jump to navigation Jump to search
mNo edit summary
 
Line 21: Line 21:
* Mozilla (test lead)
* Mozilla (test lead)
** On order, HTC Desire, Nexus S, Optimus 1.  Tracking number will be sent to Ady once that is in progress
** On order, HTC Desire, Nexus S, Optimus 1.  Tracking number will be sent to Ady once that is in progress
** [https://wiki.mozilla.org/QA/Fennec/Milestones/2.0/ReleaseTest/RC1 RC Release Test Wiki] is available with assignments
* Waverley (Ioana, Andreea, Anna, Nicolae)
* Waverley (Ioana, Andreea, Anna, Nicolae)
** Weekly Status:
** Weekly Status:

Latest revision as of 16:08, 8 March 2011

Meeting Notes for 2011-03-08

Welcome

(eg. headcount, updates with staffing, vacation/away time)

Firefox Updates

(eg. Status, top issues)

Fennec Updates

(eg. Status, top issues)

  • Mozilla (test lead)
    • On order, HTC Desire, Nexus S, Optimus 1. Tracking number will be sent to Ady once that is in progress
    • RC Release Test Wiki is available with assignments
  • Waverley (Ioana, Andreea, Anna, Nicolae)
    • Weekly Status:

Round Table

(eg. Other items to discuss)

  • Vlad: PTO request between 14th and 18th of March
  • Andrei: PTO request between 25th April and 8th May

Take Aways

(eg. Action items)