Services/Meetings/2011-08-02: Difference between revisions
Jump to navigation
Jump to search
Rsoderberg (talk | contribs) |
|||
Line 56: | Line 56: | ||
== FunkLoad Scripts (ocoutts) == | == FunkLoad Scripts (ocoutts) == | ||
== Sync Server (jbonacci) == | == Sync Server (jbonacci) == | ||
* sync6 has successfully been set up as a QA Sync Server for off-cycle testing and tools and test development. | |||
** Running latest build on EL6 with minimal adjustments/changes from original OPs configuration | |||
** Short-term goal is to get this running 24/7 hooked to Jenkins (similar to Tarek's env). | |||
** Longer-term goal is to get Owen's API automation hooked in as well. | |||
* Planning continues for next Sync Server weekly train. | |||
** Need to talk to Petef about scheduling Load Test in parallel with QA work for next train. | |||
* Planning continues for new Stage/QA environment. Will need a day to review/test drive the environment prior to next weekly Train, time permitting. | |||
* Completed several Sync Server install across various flavors of Linux. | |||
** Goal here is to be able to publish build, deploy, and test steps for Sync Server community. | |||
== TPS (jgriffin) == | == TPS (jgriffin) == | ||
Revision as of 16:09, 2 August 2011
- Time: Tuesday at 9:15 AM PST / 12:15 PM EST / 5:15 PM UTC.
- Place: Mozilla HQ, North Bridge
- Phone (US/Intl): 650 903 0800 x92 Conf: 8616#
- Phone (Toronto): 416 848 3114 x92 Conf: 8616#
- Phone (US): 800 707 2533 (pin 369) Conf: 8616#
Who's away?: .
Ops
Stage->Test
Done. Lots of bugs found, fixed. More work required on test environment.
Load->Stage
Done. Waiting to hear back from netops re: external access to stage.
AP and LDAP mod (syncNode)
Engineering
Core Server Platform
Roadmap (Toby)
Big Lebowski (rtilder)
Sync
Client (philikon/rnewman)
Latest handoff:
- bug 646539 [STRs]
- bug 673288 [qa-]
- bug 674238 [qa-]
- bug 674097 [qa-]
- bug 675125 [qa-]
- bug 666330 [qa-]
Other things:
- Nailed down roadmap for Sync Setup Improvements.
Server (Tarek)
Notifications
Client/Server (JR/Paul)
Beta Channel
Program Launch (mconnor)
QA
Testing and Sign-offs (tracy)
- Client sign-off last week was a bit tricky around timers
- this weeks client sign-off is only one QA verifiable bug in client name change
- note: bug triage session this Thursday.
FunkLoad Scripts (ocoutts)
Sync Server (jbonacci)
- sync6 has successfully been set up as a QA Sync Server for off-cycle testing and tools and test development.
- Running latest build on EL6 with minimal adjustments/changes from original OPs configuration
- Short-term goal is to get this running 24/7 hooked to Jenkins (similar to Tarek's env).
- Longer-term goal is to get Owen's API automation hooked in as well.
- Planning continues for next Sync Server weekly train.
- Need to talk to Petef about scheduling Load Test in parallel with QA work for next train.
- Planning continues for new Stage/QA environment. Will need a day to review/test drive the environment prior to next weekly Train, time permitting.
- Completed several Sync Server install across various flavors of Linux.
- Goal here is to be able to publish build, deploy, and test steps for Sync Server community.
TPS (jgriffin)
Deployment Requests
Metrics
Reports and Monitoring (daniel)
Product
Sync
Firefox 6
Firefox 7
Beyond
- mconnor: Sequence mostly locked down.