Firefox OS/DeviceQA/2014-09-01WeeklyReport: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 122: Line 122:
** Update Wiki for how to use MIFARE discover software which is provided by NXP (http://mzl.la/1wdz0i6)
** Update Wiki for how to use MIFARE discover software which is provided by NXP (http://mzl.la/1wdz0i6)
** Prepare NFC workweek QA session
** Prepare NFC workweek QA session
|-
| Askeing
||
* Week 36 (09/01~09/05):
** Develop the combo-runner framework. (https://github.com/Mozilla-TWQA/combo-runner)
** Refactoring the scripts of MTBF/CI.
** Prepare the slides of Git Tips. (http://askeing.github.io/Slides/git-tips/)
** Prepare the information of outsourcing.
||
* Week 37 (09/09~09/12)
** Develop the combo-runner framework.
** Refactoring the scripts of MTBF/CI.
** Develop the flashing tools.
** Prepare the information of outsourcing.
|-
|-
| Cynthia
| Cynthia

Revision as of 06:37, 10 September 2014

Last week | Next week

Name Done Plan
Shing
  • Week W36 (09/01~09/07):
    • Learned B2G-flash-tool.
    • Smoketest 2.0.
    • Walked through gaia-ui-test tutorial on MDN.
    • Learned how to file bugs with Bugzilla.
    • Looked into Bug 921965.
    • Finished various new-hire-related tasks.
  • Week W36 (09/08~09/12):
    • Follow up on Bug 921965.
    • Find more qawanted bug to participate.
    • Try to fix Bug 1034780 as a practice for the gaia submittion flow.
    • Prepare for study group sharing.
Paul
  • Review test case patches
  • Lab scale-up plan
  • Feedback arima for browser test cases
  • Add log timestamp in mtbf-v2.0 branch
  • Crash report patch
  • Trigger first test run on v2.1
  • Modify crash report patch based on review
  • Followup lab setup issue

-- backlog --

  • Followup live test run stream
  • Datazilla integration
  • Bug fix for in-testcase logging
  • Draw figure to intro. mtbf
eric
  • Week W36 (09/01~09/05):
    • Sign off v2.1 landed features
    • Take over Dialer, Contacts features from Johan
    • Create test cases for bug 877971
    • Create test cases for bug 1042591
    • Smoketest support for 9/1, 9/2
  • Week W37 (09/09~09/12):
    • Test Run for COMMS
    • PTS v2.1
Gerry
  • Week W36 (09/01~09/05):
    • v2.1 Finish creating test case - bug 1024776 - Support for EU Internet APN
    • Smoketest support for 9/1, 9/2
    • Finish testing bug 1035250
    • Finish testing bug 1026098
    • Verify 2.1 bugs
  • Week W37 (09/09~09/12):
    • Start to test bug 1024776
    • Start to test bug 1023818 - [User Story][Lockscreen] Taking action on lock screen notifications
Mike
  • Week W36 (09/01~09/05):
    • Categorize test cases from version tags (70%)
    • Test case mind map creation
    • Flame KK v1.4 release candidate verification: v167
    • Madai bugs verification
  • Week W37 (09/09~09/12):
    • Categorize test cases from version tags (cont.)
    • Test case mind map creation
    • Flame KK v2.0 base image verification
    • Madai bugs verification
Hubert
  • Week W36 (09/01~09/05):
    • Execute Woodduck regression test
    • Follow up Woodduck tasks and issues
    • Woodduck weekly meeting
    • Plan Woodduck Automatic testing.
  • Week W37 (09/09~09/12):
    • Execute Woodduck regression test
    • Follow up Woodduck tasks and issues
    • Woodduck weekly meeting
    • Plan Woodduck Automatic testing
    • Woodduck triage meeting
    • Execute Woodduck 2nd test run
Al
  • Week 36 (09/01~09/05):
    • Monkey Test stability run on local PC - Passed
    • Support Woodduck Issues
    • Local Vixen build verification on Mac
  • Week 37 (09/09~09/12)
    • Check issues found on Vixen w/ TAM & partners
    • Monkey Test migrates to TWCI-Jenkins and changes to v2.1 (Flame)
    • Tools for collection logs
Alison
  • Week 36 (09/01~09/05):
    • Bugs verification
    • Sign off v2.1 landed features
    • Smoketest support for 9/1, 9/2
    • Full run test - [Devices] Test Media Transfer Protocol (MTP) (bug 922927)
    • Full run test - [Ringtones] Test transfer ringtones from SD card to ringtones folder (bug 1027995)
    • Full run test - [NFC] Test tap-to-pay user story (bug 979152)
  • Week 37 (09/09~09/12)
    • Update test cases - Bug 979157 [B2G][NFC][User Story]: Tap-to-go (using MIFARE 1k) functionality to pass through gates
    • Update Wiki for how to use MIFARE discover software which is provided by NXP (http://mzl.la/1wdz0i6)
    • Prepare NFC workweek QA session
Askeing
  • Week 37 (09/09~09/12)
    • Develop the combo-runner framework.
    • Refactoring the scripts of MTBF/CI.
    • Develop the flashing tools.
    • Prepare the information of outsourcing.
Cynthia
  • Week 36 (09/01~09/05):
  • Week 37 (09/09~09/12)
    • Execute Woodduck daily smoke test