Program Management/Firefox/2014-Q3-Goals: Difference between revisions

m
Line 33: Line 33:
** {{done|}} Each planning group will have its own point cap based on their own production capability.
** {{done|}} Each planning group will have its own point cap based on their own production capability.
** {{done|}} 'Review+' bug status will now be considered work in progress and count towards the point cap during the planning meeting.
** {{done|}} 'Review+' bug status will now be considered work in progress and count towards the point cap during the planning meeting.
* Aim to achieve the following performance gains based on the above mentioned process changes at the conclusion of Iteration 35.2 on September 29:
* Aim to achieve the following performance gains based on the above mentioned process changes at the conclusion of Iteration 35.2 (Monday September 29):
** {{done|}} Reduce the average percentage of points selected by 25%.
** {{done|}} Reduce the average percentage of points selected by 25%.
** {{done|}} Increase the average percentage of completed work to 75%.
** {{done|}} Increase the average percentage of completed work to 75%.
Confirmed users
4,160

edits