Confirmed users
564
edits
Msreckovic (talk | contribs) m (→Scheduled and past triages: Adjust) |
Msreckovic (talk | contribs) (Consolidate sections) |
||
Line 3: | Line 3: | ||
This is a pilot project starting in 2015. The goal is to refine the process enough to understand what kind of time load this requires, what kind of latency we can accomplish, and collect enough data for a retrospective about best ways to measure the progress, any possible changes and next steps. | This is a pilot project starting in 2015. The goal is to refine the process enough to understand what kind of time load this requires, what kind of latency we can accomplish, and collect enough data for a retrospective about best ways to measure the progress, any possible changes and next steps. | ||
=== Process === | === Process === | ||
Line 23: | Line 19: | ||
=== | === Schedule === | ||
The schedule is tracked in a shared calendar, ID mozilla.com_6059q0oha1t7ueamb52cs7vegk@group.calendar.google.com and in case of difference with that and the table below, the shared calendar wins. | |||
{| class="fullwidth-table" | {| class="fullwidth-table" | ||
! align="center" style="width: 25%;" | 2015 Q1 | ! align="center" style="width: 25%;" | 2015 Q1 |