FxOS Portfolio Management: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
(template)
No edit summary
Line 15: Line 15:
|-
|-
| rowspan="2" | Title Goes Here
| rowspan="2" | Title Goes Here
| [https://bugzilla.mozilla.org/show_bug.cgi?id=1180659 Bug ID]
| [https://bugzilla.mozilla.org/show_bug.cgi?id=1180659 Bug 1180659]
| User Story 1
| User Story 1
| Acceptance Criteria 1
| Acceptance Criteria 1
Line 46: Line 46:
|
|
! style="background:#FF2800;" | AT RISK
! style="background:#FF2800;" | AT RISK
|-
| Milestone 4
|
! style="background:#00B2FF;" | DONE
|}
|}



Revision as of 21:16, 28 October 2015

Fxossmall.png

Program Description

Enter text here

Product Requirements:

Enter text here

User Stories and Acceptance Criteria

Title BUG ID User story Acceptance Criteria
Title Goes Here Bug 1180659 User Story 1 Acceptance Criteria 1
Bug ID User Story 2 Acceptance Criteria 2
Help/Onboarding Bug ID User Story 3 Acceptance Criteria 3

Program Status

Milestone Date Status
Milestone 1 ON TARGET
Milestone 2 CHALLENGED
Milestone 3 AT RISK
Milestone 4 DONE

Status Key

Color Status Key
On Target The project or deliverable is expected to meet its due date.
Challenged The project or deliverable is facing an issue that might cause it to miss its due date, but a “get well” plan has been developed to get it back on track.
At Risk or Late The project or deliverable is blocked or facing an issue that might cause it to miss its due date, and there’s no “get well” plan to get it back on track, or it is already late.
Done The project or deliverable has been completed.
On Hold The project or deliverable has been placed on hold.

Program Timeline

Release Timeline.png


MVP Scope

Querying by 2.6+ features

(please add correct bug tracking number)

No results.

0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);



Dependency Tracking

Dependency Gantt Chart.png


Detailed Program Plan

Action Item Engineering Owner QA Owner UX Owner Bugzilla ID Planned Done Actual Done

Program Stakeholders

Role Name IRC
EPM
EM
PM
TL
UX
QA
  • EPM = Engineering Program Manager
  • EM = Engineering Manager
  • PM = Product Manager
  • TL = Tech Lead
  • UX = User Experience
  • QA = Quality Assurance

UX Specs


Reference Links