BMO/Meetings/2016-03-29: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 3: | Line 3: | ||
* Next step for master-merge testing? | * Next step for master-merge testing? | ||
* MozReview-update noise reduction is possibly too hacky; see {{bug|1259963}}. Is there something else we can do? | * MozReview-update noise reduction is possibly too hacky; see {{bug|1259963}}. Is there something else we can do? | ||
* [glob] https://glob.uno/bteam/ changes |
Revision as of 15:07, 29 March 2016
- PT -> UTC next TCW.
- Do we need a test system (as per deliverable)?
- Next step for master-merge testing?
- MozReview-update noise reduction is possibly too hacky; see bug 1259963. Is there something else we can do?
- [glob] https://glob.uno/bteam/ changes