Confirmed users
145
edits
Balapandu222 (talk | contribs) (April Wave Added) |
(Fixed a typo) |
||
Line 43: | Line 43: | ||
April 10- CLT sign-up form opens.<br> | April 10- CLT sign-up form opens.<br> | ||
April 20- April wave sign-up form closes.<br> | April 20- April wave sign-up form closes.<br> | ||
April 25- CLT Eval Exam for the | April 25- CLT Eval Exam for the April wave closes.<br> | ||
April 30- Start of sending out the CLT results.<br> | April 30- Start of sending out the CLT results.<br> | ||