Weave Load Test Plan: Difference between revisions

(Created page with '=== Weave 1.3 Load Test Plan === ==== Objective ==== The objective of Weave 1.3 load test is to ensure that the production configuration of the weave data services can support va…')
 
Line 85: Line 85:
==== Reference Documents ====
==== Reference Documents ====
==== Release Checklist ====
==== Release Checklist ====
# Client Requirements
## All release features are checked in
## Weave client available and installable
## All client blocker bugs are fixed and verified
# Server Requirements
## All 1.3 features are checked in
## All server bugs are fixed and verified
## Current server software installed on staging and production hardware
# Operational Requirements
## All production hardware components are installed and functioning properly
## All staging hardware components are installed and functioning properly
## A hardware architecture design document available and reviewed for accuracy
## Continuous hardware monitoring system is installed and operational
## A disaster recovery plan is reviewed, accepted and key aspects have been tested
## Hardware and data security plan is approved and validated
## Daily operational plan and guide is available and validated
# Test Requirements
## All unit tests written and results are passed
## Client Test Plan reviewed and approved by weave team
## Load Test Plan reviewed and approved by Weave team
## High availability strategy and major component failure testing conducted and passed.
## All tests plans have been conducted and release criteria reviewed and evaluated
==== Issues and Questions ====
==== Issues and Questions ====