Services/Sync/Meetings/2010-10-20: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 30: | Line 30: | ||
== Roundtable == | == Roundtable == | ||
* New user activations - do we have an estimate based on load tests? | |||
* Perf status, targets, benchmark | |||
* EC2 status? | |||
* Client/Server functional spec for other clients | |||
* Timeline and coordination for: | |||
** J-PAKE | |||
** Crypto backend change | |||
* New Sync engineering meeting time? | |||
== Notes and actions == | == Notes and actions == |
Revision as of 16:15, 20 October 2010
- Time: Wednesday at 9:15AM PDT / 12:15PM EDT / 4:15 UTC.
- Place: Mozilla HQ, 3V (Very Good, Very Mighty)
- Phone (US/Intl): 650 903 0800 x92 Conf: 8616#
- Phone (Toronto): 416 848 3114 x92 Conf: 8616#
- Phone (US): 800 707 2533 (pin 369) Conf: 8616#
Technical
Ops
J-PAKE
- Draft timeline up, some fuzziness to fill in after discussion. Work is continuing on all fronts.
Fx Sync
- J-PAKE backend pending review.
- Crypto simplification project kicked off (better perf, less network I/O)
Fx Home
- 1.0.4 builds being tested by QA
- J-PAKE framework in place, UI yet to come.
Server
- 1.5 deployment targeted for ~2 weeks from now
- All bugs are filed and chained from bug 604131
- Toby has the lead from the Engineering side
Metrics
Product
Roundtable
- New user activations - do we have an estimate based on load tests?
- Perf status, targets, benchmark
- EC2 status?
- Client/Server functional spec for other clients
- Timeline and coordination for:
- J-PAKE
- Crypto backend change
- New Sync engineering meeting time?