Confirmed users
2,679
edits
Line 79: | Line 79: | ||
** verified that power cycling from the strip gets them back up & green. ip-controlled power switches en route | ** verified that power cycling from the strip gets them back up & green. ip-controlled power switches en route | ||
** after they're more stable, back to working on unit tests + more suites | ** after they're more stable, back to working on unit tests + more suites | ||
* when "go to build" for Fennec4.0b4? | |||
== QA == | == QA == |