L10n:Planning/2012-03-05: Difference between revisions
Jump to navigation
Jump to search
(Created page with "{{SUBPAGENAME}} {{SUBPAGENAME}} __NOTOC__ ==Meeting Details== * Time and location: Monday, 8 AM PST, conf bridge 2...") |
(→Pascal) |
||
Line 79: | Line 79: | ||
planned for this week: | planned for this week: | ||
* | * Prepare the excel file for EUBallot with the translated strings | ||
done last week: | done last week: | ||
* put a beta download link on all /new pages with an existing beta promotion string (convinced engagement to reuse a string and activate the link for all locales instead of translating a new one for 4 locales only). Fixed about 20 pages to still look good after that visual change. | |||
* gave instructions for SVN to Arash our Persian localizer (I was committing for him until he got his account created) | |||
* Launched translation of a new snippet to promote Firefox Flicks on about:home | |||
* Created ESR pages for German | |||
* Coded a live view of snippets.lang so as that marketing can easily check locales done and copy/paste them http://l10n.mozilla-community.org/~pascalc/langchecker/?action=translate | |||
* Worked with Alexis from the python services team to help me setup bedrock locally (he even patched bedrock to fix the install steps which lacked documentation) | |||
* Kept working on Beta pages, 47 locales done | |||
* | * | ||
=== Pike === | === Pike === | ||
'''goal for this week''': | '''goal for this week''': |
Revision as of 14:49, 5 March 2012
Meeting Details
- Time and location: Monday, 8 AM PST, conf bridge 206
- irc.mozilla.org #l10n-drivers for back-channel
« previous meeting — index – next week » create?
Previous Action Items
carry-overs
Meeting Notes
- Notetaker:
- Attendees:
- Put your talking points here.
Action Items
carry-overs
Roundtable
arky
goal for this week:
planned for this week:
done last week:
chofmann
goal for this week:
planned for this week:
done last week:
gandalf
goal for this week:
planned for this week:
done last week:
Jeff
goal for this week:
planned for this week:
done last week:
Matjaž
goal for this week:
planned for this week:
done last week:
Milos
goal for this week:
planned for this week:
done last week:
Pascal
goal for this week:
planned for this week:
- Prepare the excel file for EUBallot with the translated strings
done last week:
- put a beta download link on all /new pages with an existing beta promotion string (convinced engagement to reuse a string and activate the link for all locales instead of translating a new one for 4 locales only). Fixed about 20 pages to still look good after that visual change.
- gave instructions for SVN to Arash our Persian localizer (I was committing for him until he got his account created)
- Launched translation of a new snippet to promote Firefox Flicks on about:home
- Created ESR pages for German
- Coded a live view of snippets.lang so as that marketing can easily check locales done and copy/paste them http://l10n.mozilla-community.org/~pascalc/langchecker/?action=translate
- Worked with Alexis from the python services team to help me setup bedrock locally (he even patched bedrock to fix the install steps which lacked documentation)
- Kept working on Beta pages, 47 locales done
Pike
goal for this week:
planned for this week:
done last week:
stas
goal for this week:
planned for this week:
done last week: