Firefox3/Schedule: Difference between revisions
< Firefox3
Jump to navigation
Jump to search
Line 57: | Line 57: | ||
* Sept 5, 2007 Code Freeze | * Sept 5, 2007 Code Freeze | ||
* September 18 Ship (or sooner) | * September 18 Ship (or sooner) | ||
|| First l10n builds. Front end feature frozen (no planned features past this point) | || First l10n builds. Front end feature frozen (no planned features past this point). Threat-level: [http://groups.google.com/group/mozilla.dev.planning/browse_thread/thread/f569a23ce266a451/265344ae5291dee0 Yellow] | ||
|- valign="top" | |- valign="top" | ||
| M9 || | | M9 || |
Revision as of 23:05, 4 September 2007
Please do not edit these pages without permission of the Gran Paradiso steering group. Your feedback and comments are welcomed on the discussion page.
Mozilla Developer's Calendar
The Mozilla Developer's Calendar holds the most up to date schedule for the development milestones and planned release dates of Mozilla products:
- subscribe to the ICS file (use Mozilla Sunbird, Apple iCal, or Google Calendar)
- add the calendar to your Google Calendar account.
- view the calendar as a webpage.
Release Criteria
Alpha release criteria:
- Alphas must be generally usable for testing websites and features
- No significant features broken
- Major/high value sites should function and display in a reasonable fashion
Beta release criteria
- Betas must be stable and usable enough for daily browsing for a large number of people
- Features are fully implemented, if not finalized
- Most sites should display properly and regression free (from previous major release)
Gecko 1.9 / Firefox3 Milestone Schedule
This is draft milestone schedule for Gecko 1.9 and the Gran Paradiso release. We are currently in early-planning stages for Firefox 3, so these dates should not be considered fixed, but rather as a reflection of our current estimates (i.e., these are *draft* dates).
- Proposal for L10N cut-off dates
Release | Date | Description |
Alpha 1 | December 2006 | Developer Preview ("Dogfood") Gran Paradiso alpha 1 release notes |
Alpha 2 | 8 Feb 2007 | Gecko 1.9a2 Release Notes, Gran Paradiso alpha 2 release notes |
Alpha 3 | 23 March 2007 | Gran Paradiso alpha 3 release notes |
Alpha 4 | 27 April 2007 | Gran Paradiso alpha 4 release notes |
Alpha 5 | June 6, 2007 | Gran Paradiso alpha 5 release notes |
Alpha 6 | July 2, 2007 | Gran Paradiso alpha 6 release notes |
Alpha 7 | August 3, 2007 | Gran Paradiso alpha 7 release notes |
M8 |
|
First l10n builds. Front end feature frozen (no planned features past this point). Threat-level: Yellow |
M9 |
|
All strings frozen two weeks prior to release. Really frozen. String changes past this will cause overall schedule slippage. |