WeeklyUpdates/2007-12-17: Difference between revisions
(→IT) |
|||
Line 114: | Line 114: | ||
== Mozilla Labs == | == Mozilla Labs == | ||
* [http://labs.mozilla.com/contests/extendfirefox/ Extend Firefox] | |||
** 50 entries to date, contest ends Dec. 31, 2007 | |||
** Thanks to all who are helping with extension testing, let Rhian know if you are still interested | |||
* Personas | |||
** Site launched | |||
** Thanks to fligtar for his help getting this site up. | |||
== Webdev, Add-ons, AMO == | == Webdev, Add-ons, AMO == |
Revision as of 20:45, 17 December 2007
« previous week | index | next week »
Meeting Details
- 1:00pm Pacific time (21:00 UTC until March 9, 2008)
- Mozilla HQ, 1st floor conference table
- +1 650 903 0800 x91 Conf# 8600 (US/International)
- +1 416 848 3114 x91 Conf# 8600 (Canada)
- +1 800 707 2533 (pin 369) Conf# 8600 (US Toll Free)
- join irc.mozilla.org #staffmeeting for backchannel
note: all participants are muted automatically; if you want to talk, press *1 to un-mute yourself
Friends of the Tree 
Jeff Walden & Reed Loden nominate Jesse Ruderman. "One man, one week, 295 crashtests. Zounds." Reed provides the link
Seth Spitzer nominates Phil Ringnalda "for his recent work in finding, logging, and fixing bugs with our livemark code."
Ted Mielczarek nominates Ben Hearsum. "He's done a lot of work setting up a VM to build the MozillaBuild installer, which is totally arcane work, and has been a huge help, and it wasn't at all his responsibility."
I (asa) would like to nominate Seth Spitzer as a friend of the tree for his consistent participation in the Friends of the Tree program and for always trying to make sure Mozilla contributors are recognized and thanked.
Development Updates
Fx 2.0.0.12 / TB 1.5.0.14
Thunderbird 1.5.0.14 is currently in beta. It will be released Wednesday, 12/19, at 3:00 PM if no new issues are found or reported.
There is some debate about when to do the Major Update because of holiday schedules. That should be worked out this week.
Firefox 2.0.0.12 planning has not begun at this time but triaging of bugs will begin this week for that release.
TB 3
Gecko 1.9
- Still a go on Beta 2. Leaving it to QA to report more below.
- Status on Beta 3:
- 14 P1s
- 121 P2s
- please add your suggestions for release note worthy beta 2 bugs/known issues as soon as possible
Firefox 3
- please add your suggestions for release note worthy beta 2 bugs/known issues as soon as possible
Calendar Project
IT
- PHP5 migrations completed
- Kernel upgrades completed
- Kubla live!
- .cn datacenter is up, sites to come up in the next few weeks
- Holiday coverage - oncall at mozilla.org will be covered 24x7
Build
QA
ThunderBird 1.5.0.14 [abillings-lead]
- This was pushed to the Beta Channel after testing bug fixes, smoke testing, BFTs, update channels, L10n, etc.
Firefox 3 [tchung-lead]
- Testing Beta 2: Completed: Smoke tests, BFTs, memory leak teesting, Top extension checks, P1 local spot checks, accessibility, Betatest channel update testing, community test day. [tchung,tracy, others]
- Places feature testing - general bugmail triage and filingnew bugs along with verified 15 bugs
- Continued work on Download Manager--Edward Lee is keeping stephend busy :-)
- Continued work on Location Bar--both Litmus and bug verifications [stephend]
- Filed [Bug+creation&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0=Bug|a number of bugs in the Layout, ImageLib, autocomplete areas]. [mw22]
- We are working out which locales to test for B2. See here. We are also planning to test 3 languages for the first round of testing by our skilled language testers at Smartware.
- Litmus cleanup: cleaned up/restructured Microsummaries, Layout, General and all "Security" related subgroups [tracy, marcia]
Partner testing
- Yahoo!Japan and Google Fx3b1 spot checks [tracy]
Webdev testing: Planning on testing Remora
Test Automation:
- Added more tests to the Eggplant automated Security tests [tracy, bc]
- js test automation (sisyphus) - linux and mac (ppc) reporting results for both branch and trunk. Windows will be setup early in Q1.
Performance
- Talos try server is running and reporting to mozillatest tinderbox tree
Community
- Bug day was on Tuesday, Dec 11th.
8 We held a Firefox 3 B2 test day on Fri Dec 14th. See the results here.
- Last Test Day for 2007 is on Fri, Dec 21st. It will be focused on testing Firefox 3, Beta 2.
Security
Marketing/PR
- FOSS.IN a success - join us for brown bag on 12/19 at 12:30 p.m.
Support
- Worked with Stanisław Małolepszy and Seth Bindernagel on a community user-to-user support survey. Objectives:
- To understand and measure how Mozilla is doing with product support in the different locales.
- To get a better understanding on people's perception of the SUMO project and its scope.
- To find out how can we make SUMO more useful.
Metrics
Evangelism
SVG initiative status
- Review open bugs with patches we could land in Fx3 (done)
- Collect some SVG samples to help gauge Mozilla SVG implementations support and performance (done)
- Collect some samples of SVG demos (done)
- Revamp SVG landing page on MDC (inprogress)
- Add some SVG code snippets on MDC (inprogress)
- Create a summary doc on the state of Mozilla SVG [inprogress]
- Create a list of use cases for using SVG in web development [inprogress]
JavaScript 2
- Compiled a full list of features in ECMAScript 4, broken down by implementation
- Released the the results along with a pretty picture.
Mobile Work
Mozilla Labs
- Extend Firefox
- 50 entries to date, contest ends Dec. 31, 2007
- Thanks to all who are helping with extension testing, let Rhian know if you are still interested
- Personas
- Site launched
- Thanks to fligtar for his help getting this site up.
Webdev, Add-ons, AMO
- Breakpad
- Reduced recurrence of exceptions due to corrupt JSONs
- Reduced processorLoopTime to increase throughput of processor(s)
- System should be snappier and able to keep up with submission rate now
- If you have any problems let morgamic know
- AMO
- Design work is complete, see finished mocks
- Working through updated deployment checklist for the reskin, pushing schedule back to allow time for localizers and public beta testing
- API is 99% complete (TM 3.3)
- Rounding up rest of TM 3.2