Program
|
Passed Gate
|
Status
|
Notes
|
Project Sensor Web
|
Cindy/Jean
|
Gate 1
|
On Target
|
- Bulleted list item
- Bulleted list item
|
Project_Haiku (taking in Project Smart Display)
|
Liz/Joe/Mahe
|
Gate 0
|
On Target
|
- Bulleted list item
- Bulleted list item
|
Platform and Tools
|
Sandip/Nicole/Mahe
|
N/A
|
On Target
|
- Bulleted list item
- Bulleted list item
|
Voice Platform - Deep Speech
|
Sandip/Nicole
|
N/A
|
On Target
|
- Bulleted list item
- Bulleted list item
|
Abigail
|
Preeti/Julie
|
Gate 0
|
On Target
|
Product Concept Validation
- Launched a consumer study Oct. 25th to test two different value propositions with groups of 100 in the target demographic group. Will monitor results and review the questions we're asking for appropriateness.
- Also launched a Facebook campaign and landing page to gauge interest in Abigail and collect email addresses.
- Working closely with an agency on the Abigail video that will feature how a family of four can be helped by Abigail.
- Models of Abigail have been printed in 3D to be used in the video and available for studies.
Engineering
- Spending this week with testing code, bug fixing. Working on getting voice commands with user names working.
- Getting the base code running on the 5 prototype devices and preparing them for use in the study. Working on a problem identified with flaky accelerometer connections. Looking into loose jumper wires.
Concept Validation Testing
- Study was started October 28th to test a couple concepts for the Abigail product: 1) Smart Family Tracker and 2) Smart Reminders for the Whole Family
- A Facebook campaign has been active since October 26th to test consumer interest using different product concepts. Data is coming in on how well this is driving consumers to Abigail product page.
- Revisiting how to produce a video to showcase all the functionality that Abigail can provide.
Abigail Study with Prototypes
- Finishing up work on a prototype study guide that will be used during the visits to participant homes.
- Scheduling participant sessions. The first will be held November 11th. Abigail team members will be interviewing the participants and observing their interactions with the Abigail prototypes.
- Study will include consumer interaction with the prototypes and collection of feedback regarding usage and responses to questions asked of the consumers.
Schedule
- Value proposition validation - Oct. 24 - early November Status: On Target
- Prototype development: month of October Status: Completed - fixing bugs now
- Assembly of devices: week of October 31 Status: Nearly Completed - working on loose connections
- Testing in homes: November 7 - 18 Status: On Target - home visits are being scheduled
- Data synthesis from pilot and video/landing page studies: November 21 - 29
- Gate 1 pitch: November 30
|
Project Magnet
|
David/Maria
|
Gate 0
|
On Target
|
Mozfest
- Project Magnet team
- London team attended to the Science Fair (Friday), they presented Magnet app with the new Virtual Beacon experience. Warm welcome and really good one to one feedback.
- Contacted to several storytellers interested in use Magnet as a channel to provide content in the future
- Mozfestation application: Dietrich, Liz and Katie run an experiment based on our app during Mozfest
- With very small changes in the Magnet app (as adding a counter of the beacons discovered with mozfest URL), 100 beacons were distributed in the venues encouraging people to visit all the ideas and spaces at Mozfest to discover them.
- With the info provided from Magnet server during the experiment, Mozfest team could track people movements and create a heat map of the spaces.
- The game was a success, and that's the reason we are right now exploring the call of adventure (gamification) and completeness as possible features in the UX of Magnet to make it more engaging/compelling for future versions. Storytellers could also provide a reward encouraging people subscribed to their channels to visit more POIs
Magnet status
- This week we will finish our second sprint Sprint 7
- In the client side Channels subscription is almost ready in iOS and Android and the team is working on the buzz notifications
- Server side: most of the work done, still working on an issue regarding to the 'extra_metadata' returned from the content service and adding the call to actions to the metadata response
- Research product/solution fit: Facebook/Landing page test for pre-signups and app downloads from Londoners. We are ready to run the campaign. Planning on testing 3 value propositions in order to tune it with the goal of achieving a 5% response rate from FB ad 10% action rate from the landing page.
|
HomeWeb
|
Ben/Mahe
|
Gate 0
|
On Target
|
- Bulleted list item
- Bulleted list item
|
GameON!
|
Candice/Julie
|
Gate 0
|
On Target
|
- Bulleted list item
- Bulleted list item
|
Lighthouse
|
Preeti/Julie
|
Gate 0
|
On Target
|
- Bulleted list item
- Bulleted list item
|
3D Printing
|
Thomas
|
Pre Gate 0
|
On Target
|
- Bulleted list item
- Bulleted list item
|
Participation Update
|
Michael/Brian
|
--
|
On Target
|
- Bulleted list item
- Bulleted list item
|
Market Developments Update
|
Irina
|
|
|
- Bulleted list item
- Bulleted list item
|
Other Announcements / Questions
|
--
|
--
|
|