Firefox OS/DeviceQA/2014-10-13WeeklyReport

< Firefox OS‎ | DeviceQA
Revision as of 09:10, 21 October 2014 by Echang (talk | contribs)

Last week | Next week

Name Done Plan
Al
  • Week W42 (10/13~10/17):
  • Week W43 (10/20~10/24):
Walter
  • Week W42 (10/13~10/17):
  • Week W43 (10/20~10/24):
Cynthia
  • Week W42 (10/13~10/17):
    • Take care of Flame KK v2.0 automation reports
    • Provide Woodduck daily build
    • Clarify and reproduce Woodduck issues
  • Week W43 (10/20~10/24):
Edward
  • Week W42 (10/13~10/17):
    • Productivity - Verify sprint 6 tickets
    • Bugs verfification
    • Write Marionette js auto scripts.
    • Final confirm and trace status of blocking issues in v2.1
  • Week W43 (10/20~10/24):
Shing
  • Week W42 (10/13~10/17):
    • Cost Control test cases cleanup.
    • Write gaia-ui-test for cost control app.
    • Verify cost control and telemetry bugs.
  • Week W43 (10/20~10/24):
Askeing
  • Week W42 (10/13~10/17):
  • Week W43 (10/20~10/24):
Gerry
  • Week W42 (10/13~10/17):
    • Create app usage metric test cases.
    • (50%) Automate test cases for actions on notification
    • Review smoke tests for SP & OTA
    • Verify bugs.
  • Week W43 (10/20~10/24):
    • Automate test cases for "actions on notification"
    • Test cases categorization for WiFi
    • Verify bugs.
Mike
  • Week W42 (10/13~10/17):
    • Flame base image verification
      • v188 HW Sanity Test
      • Bug reproduction
    • Others: 4 days PTO
  • Week W43 (10/20~10/24):
    • Flame base image verification
      • v188+PVT Full Flash HW Sanity Test
      • Bug reproduction
    • Suppport Dolphin SD card verification
    • Arrange discussion of topics against MozTrap Ecosystem
Paul
  • Follow up device/graphic issue
  • Prepare Q3 retrospect demo
  • Q4 plan
  • Check incoming request for flash tool

-- backlog --

  • Followup live test run stream
  • Datazilla integration
  • Bug fix for in-testcase logging
  • Modify crash report patch based on review
  • Week W43 (10/20~10/24):
eric
  • Week W42 (10/13~10/17):
    • Exploratory against v2.1
    • Verification of bugs
    • Fixing SMS/STK test cases
    • Reviewing smoke test case
  • Week W43 (10/20~10/24):
    • Market customization testing
    • Market customization test case fixing
    • Bug bash preparation badge design
Hubert
  • Week W42 (10/13~10/17):
  • Week W43 (10/20~10/24):
William Hsu
  • Week W42 (10/13~10/17):
    • [Device] Assist device related tests - Tako
      1. Tako v2.1 Test Plan
      2. Assign Tako's bugs to developers and stakeholders.
      3. Executing Gaia UI test on Tako ES2 build (ETA: 10/14)
      4. Executing smoketest on Tako ES2 build (ETA: 10/16)
      5. Weekly meeting with partner (10/14)
    • [Device] Assist device related tests - Flame
      1. Gaia UI test on v2.0 Build
      2. v2.0 Bug verification (verifyme) (Ref: http://goo.gl/EyMRDn)
      3. New Flame base image verification (v186?)
      4. Answer flame inquiries
  • Week W43 (10/20~10/24):
Alison
  • Week W42 (10/13~10/17):
    • Bugs verification
    • Update DSDS gaia-ui-test case for bug 980757
    • Study [SIMalliance] Open Mobile API Test Specification
    • Test cases categorization for NFC
  • Week W43 (10/20~10/24):