Name
|
Done
|
Plan
|
Al
|
- Week W12 (03/16~03/20)
- MCTS v2.2
- Bug 1116878 - [2.1] Most bluetooth tests fail with "app = null" error
- attempting to resolve it again \_/#
- Have a release for MCTS v2.2 in this week
- Marionette Issue
- Support Fire2-3.5 MCTS
|
- Week W13 (03/23~03/27)
- Have a release for MCTS v2.2 in this week
|
Alison
|
|
|
Askeing
|
- Week W12 (03/16~03/20)
- MCTS issues fixing.
- Bug 1142421 - marionette-extension should support v2.2
- Bug 1142422 - fxosapp-gen should support v2.2 officially
- Bug 1143531 - [MCTS] update the dependencies to support v2.2
- Bug 1144605 - NameError: global name 'dm' is not defined
- Bug 1142430 - [MCTS] The semiauto tests will show "Could not close CertTest App automatically..." error message.
- Bug 1144536 - [MCTS] Change omni.ja test with a proper presentation in report
|
- Week W13 (03/23~03/27)
- MCTS issues fixing.
- Investigate the log/report of MCTS
- Bug 1144536 - [MCTS] Change omni.ja test with a proper presentation in report
- Investigate the python diff mechanism for checking omni.ja
|
Cynthia
|
|
|
Edward
|
|
|
Eric
|
- Week W12 (03/16~03/20)
- Check for v2.2 bug status
|
- Week W13 (03/23~03/27)
- Check for v2.2 bug status
- Check resource for Marigold
|
Gerry
|
- Week W12 (03/16~03/20)
- v2.2 feature testing
- Privacy Controls feature - keep testing.
- Follow up unresolved issues.
- QAnalyst/MGSEI bugs verification/follow-up
- Nexus 5 automation test monitoring
- Test Spec template drafting
|
- Week W13 (03/23~03/27)
- v2.2 feature testing
- Privacy Controls feature - keep testing.
- Follow up unresolved issues.
- QAnalyst/MGSEI bugs verification/follow-up
- Nexus 5 smoke test result verification
- Test Spec template drafting
|
Hermes
|
- Week W12 (03/16~03/20)
- Monitor v2.2+ System FE Bugs
- Feature landing verification of Bug 1001861
- Monitor SysFE bugs
- Start MozTrap enhancement
- Study react.js
- implement a feature
|
- Week W13 (03/23~03/27)
- Monitor v2.2+ System FE Bugs
- Monitor SysFE bugs for FL milestone
- Refine 2.2 CI script
- MozTrap enhancement project
- implement features if time is enough
|
Hubert
|
- Week W12 (03/16~03/20)
- Follow up Woodduck tasks and issues
- Outsourcing weekly meeting
- Bug work for Marigold submitted bugs
- Modify and create test cases for In-House FOTA (Completed: 85%)
- In-House FOTA testing strategy discussion with PM and RD.
- Generate lesson learn document for woodduck project. (Completed: 80%)
- Study OTA data migration automation test
|
- Week W13 (03/23~03/27)
- Follow up Woodduck tasks and issues
- Outsourcing weekly meeting
- Bug work for Marigold submitted bugs
- Modify and create test cases for In-House FOTA
- In-House FOTA testing strategy discussion with PM and RD.
- Generate lesson learn document for woodduck project.
- Study OTA data migration automation test
- Review and modify SOW document for QA outsourcing
|
Mike
|
- Week W12 (03/16~03/20)
- v2.1 bug work
- Power consumption measurement
- Support Madai issue verification
- New SUPL server follow up
|
- Week W13 (03/23~03/27)
- v2.1&v2.1s bug work
- Power consumption measurement
- Woodduck A-GPS verification
|
Owen Ouyang
|
|
|
Paul
|
|
|
Shing
|
- Week W12 (03/16~03/20)
- New test case management system prototyping
- Metrics testing + test case update
- MozTrap enhancements
- Meetings with US team + qanalyist
- Meetings with Johan
|
- Week W13 (03/23~03/27)
- Test case management system prototyping
- Metrics Testing
- MozTrap enhancements retrospect
- Prepare sharings on MozTrap enhancement
- Interview RDs on their automation testing practices
|
Teri
|
|
|
Walter
|
|
|
William Hsu
|
- Week W12 (03/16~03/20)
- [Device]
- Bug work
- GU test on Flame v2.0 & Flame v2.1 & Dolphin v2.1s
- [Outsourcing]
- RTL test case review
- Dispatch bugs of free test
- Q1 performance review and documentations
|
- Week W13 (03/23~03/27)
- Marriage leave, 3/23~3/27
|
Shako Ho
|
- Week W12 (03/16~03/20)
- minor fix patch for MTBF
- makefile added for mtbf-driver
- makefile modification for mtbf-operation
- add auto generated report for MTBF job in jenkins
|
- Week W13 (03/23~03/27)
- add mtbf operation daily task in jenkins
|