Metrics Description

From MozillaWiki
Jump to navigation Jump to search
Fxossmall.png

Program Description

Product Requirements:

Provisional Roadmap for 2.6 in included here. Although it needs to be re-evaluated after Mozlando announcement. For the time being, these are the planned features although it's also necessary that they can be prioritized.

Activation
  • Optimizing FTU: % of signups to Moz services: FxAccounts, FMD
  • Accuracy of Retention/MAU: FTU ping should include info on whether User opt-in for metrics (1198164)
Retention
  • Support for progressive web apps (1226458)
  • Make uuid available to Foxfooder app (1226274)
  • Inclusion of device metrics in A/B testing (likely to be moved beyond 2.5)
  • Engagement with device: Number of voice calls, data (wifi and cellular), number of text messages. 1193225.
  • Device Startup time: OTA collection of device dtartup time (1177226)
  • Advanced A/B testing
  • Churn Rate & User Lifecycle Analysis (In planning)
  • Framework Improvements
    • Enum Type and Boolean Type histograms
  • Support for New Security model 1225960
  • FoTA Ping Engg bug: 1202970, Legal bug: 1202987.
Referral
  • Net Promoter Score (User Satisfaction Factor)
Privacy
  • User ability to delete collected info. 1126513.
Server
  • Graphing of Addon Histograms
  • Graphing of Keyed Histograms

User Stories and Acceptance Criteria

Title BUG ID User story Acceptance Criteria
Activation Bug ID Optimizing FTU: % of signups to Moz services: FxAccounts, FMD Acceptance Criteria 1
Bug 1198164 FTU ping should include info on whether User opt-in for metrics Acceptance Criteria 2
Help/Onboarding Bug ID User Story 3 Acceptance Criteria 3

Program Status

Milestone Date Status
Milestone 1 ON TARGET
Milestone 2 CHALLENGED
Milestone 3 AT RISK

Status Key

Color Status Key
On Target The project or deliverable is expected to meet its due date.
Challenged The project or deliverable is facing an issue that might cause it to miss its due date, but a “get well” plan has been developed to get it back on track.
At Risk or Late The project or deliverable is blocked or facing an issue that might cause it to miss its due date, and there’s no “get well” plan to get it back on track, or it is already late.
Done The project or deliverable has been completed.
On Hold The project or deliverable has been placed on hold.

Program Timeline

Release Timeline.png


MVP Scope

Querying by 2.6+ features

(please add correct bug tracking number)

No results.

0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);



Dependency Tracking

Dependency Gantt Chart.png


Detailed Program Plan

Action Item Engineering Owner QA Owner UX Owner Bugzilla ID Planned Done Actual Done

Program Stakeholders

Role Name IRC
EPM
EM
PM
TL
UX
QA
  • EPM = Engineering Program Manager
  • EM = Engineering Manager
  • PM = Product Manager
  • TL = Tech Lead
  • UX = User Experience
  • QA = Quality Assurance

UX Specs


Reference Links