Connected Devices/Projects/Smart Kitchen

From MozillaWiki
< Connected Devices‎ | Projects
Revision as of 19:57, 6 July 2016 by Nyee (talk | contribs) (prototype)
Jump to navigation Jump to search
  • Tamara Insert Project Intro

Project overview

  • Tamara Insert Project Overview

Program Status

Milestone Date Status Status Notes
Passed Gate 0 06/08/2016 Done Gate 0 Pitch
User Research Survey 06/10/2016 Done user Research Doc
Kick off in London 06/13-17/2016 Done
Problem/Product Hypothesis Building 07/10/2016 On Target Problem/Product Hypothesis
Participatory Design 07/12/2016 On Target Participatory Design Template
Hypothesis Validation Prototype 08/04/2016 On Target Smart Kitchen Prototype Requirements

Status Key

Color Status Key
On Target The project or deliverable is expected to meet its due date.
Challenged The project or deliverable is facing an issue that might cause it to miss its due date, but a “get well” plan has been developed to get it back on track.
At Risk or Late The project or deliverable is blocked or facing an issue that might cause it to miss its due date, and there’s no “get well” plan to get it back on track, or it is already late.
Done The project or deliverable has been completed.
On Hold or Not Started The project or deliverable has either not been started or has been placed on hold.

Communication

IRC

Join the conversation on irc.mozilla.org, channel #SmartKitchen.

Vidyo

Bi-Weekly Sync Ups

The Smart Kitchen has open bi-weekly sync ups every Tuesday and Thursday at 11:00AM PST in the SmartKitchen Vidyo room. Instructions for joining the video conference (vidyo) meeting room are above. Meeting notes can be found here.

Project Management (Trello)

Smart Kitchen is operating in 2-week sprints. To follow our actions throughout the gating process, please follow our Smart Kitchen Trello.


References

Team